switching action is required.<br />
ii)<br />
The proposed island scheme shall required to be configured /reconfigured<br />
for peak and off peak operating conditions. The preidentified<br />
relays ( UFRs) at the sub stations shall be enabled during off<br />
peak period to cover the extended load , to match the available<br />
generation. These relays shall be disabled during peak period.<br />
iii)<br />
The proposed islanding scheme operations consists of three stages as<br />
under;-<br />
a) Stage I: When frequency dips to level of 47.9 Hz<br />
b) Stage II: When frequency further dips to level of 47.7 Hz<br />
c) Stage III: When frequency stays at 47.7 Hz*<br />
* additional load shedding at an interval of 300<br />
milli-seconds up to 2 seconds in steps<br />
iv)<br />
Disconnection of feeders will be triggered through UFRs proposed to<br />
be installed at Sub stations. Two independent relays, for sensing the<br />
frequency from each bus of sub station shall be provided at each of the<br />
sub station falling under the islanding zone, classified as under:<br />
Relay on Bus-1 = M1 and S1<br />
Relay on Bus-2 = M2and S2<br />
v) Up to 3 no 220 KV feeder will have dedicated set of relays (M1 and<br />
M2) whereas in case of 66 KV feeders, one set of relay (S1 and S2)<br />
will control up to four 66 KV feeders. S1 & S2 shall also control high<br />
frequency swings in the island by operating at 50.5 Hz & 51.0 Hz for<br />
auto reclosing the pre-identified feeders.<br />
The setting of relays shall be as under:-<br />
M1 M2 47.9 Hz<br />
S1 S2 47.7 Hz<br />
S1 S2 50.5 Hz (for Auto reclosing)<br />
S1 S2 51.0 Hz (for Auto reclosing)<br />