ANEXURE III<br />

TECHNICAL SPECIFICATION OF UFRs :<br />

The broad technical specification of islanding relays for the proposed load<br />

shedding scheme is as under:<br />

a. Rating:<br />

The rated auxiliary voltage : 220V + 5% (D.C).,<br />

The rated system frequency: 50 Hz<br />

Nominal voltage : 110V (A.C). Phase-Phase from P.T’s.<br />

b. Operating frequency range : 45 to 55 Hz in steps 0.1 Hz with accuracy + 10 mHz.<br />

c. Under Voltage block at 40% of P.T. Voltage.<br />

d. Recovery function: Frequency difference from set value 0.1 to 2.0 Hz. Resetting<br />

time – 15 Sec. to 15 minutes. Accuracy + 1%.<br />

e. The relays should be immune to harmonics & transients.<br />

f. It should have feature to self monitor. It should also be possible to monitor the<br />

relay from remote.<br />

g. The relay should have at least 4 levels of settable under frequency levels.<br />

h. The relay should have at least 2 levels of settable over frequency levels.<br />

i. The relay should have three load shedding stages for df/dt function and each<br />

stage should have setting range of 0.1 to 3 Hz (incremental in steps of 0.1<br />

Hz/Sec).<br />

j. The each output contact of relays shall be configurable based on frequency<br />

whether over and under frequency values.<br />

k. The relay shall be IEC 61850 Compliant and shall communicate with SCADA<br />

system located at a remote location through owner communication network<br />

through 2mbps Ethernet port.<br />

l. The relay shall have at least four (4) voltage inputs where PT can be<br />

connected directly without any additional interfacing equipment.<br />

m. The relay shall have at least 12 status input and 6 trip output contacts to trip<br />

at least 6 feeders & monitor Main & Tie CBs of these 6 feeders. The output<br />

contacts shall be wired to self reset heavy duty trip relays to trip Main & Tie<br />

17