ANEXURE III<br />
TECHNICAL SPECIFICATION OF UFRs :<br />
The broad technical specification of islanding relays for the proposed load<br />
shedding scheme is as under:<br />
a. Rating:<br />
The rated auxiliary voltage : 220V + 5% (D.C).,<br />
The rated system frequency: 50 Hz<br />
Nominal voltage : 110V (A.C). Phase-Phase from P.T’s.<br />
b. Operating frequency range : 45 to 55 Hz in steps 0.1 Hz with accuracy + 10 mHz.<br />
c. Under Voltage block at 40% of P.T. Voltage.<br />
d. Recovery function: Frequency difference from set value 0.1 to 2.0 Hz. Resetting<br />
time – 15 Sec. to 15 minutes. Accuracy + 1%.<br />
e. The relays should be immune to harmonics & transients.<br />
f. It should have feature to self monitor. It should also be possible to monitor the<br />
relay from remote.<br />
g. The relay should have at least 4 levels of settable under frequency levels.<br />
h. The relay should have at least 2 levels of settable over frequency levels.<br />
i. The relay should have three load shedding stages for df/dt function and each<br />
stage should have setting range of 0.1 to 3 Hz (incremental in steps of 0.1<br />
Hz/Sec).<br />
j. The each output contact of relays shall be configurable based on frequency<br />
whether over and under frequency values.<br />
k. The relay shall be IEC 61850 Compliant and shall communicate with SCADA<br />
system located at a remote location through owner communication network<br />
through 2mbps Ethernet port.<br />
l. The relay shall have at least four (4) voltage inputs where PT can be<br />
connected directly without any additional interfacing equipment.<br />
m. The relay shall have at least 12 status input and 6 trip output contacts to trip<br />
at least 6 feeders & monitor Main & Tie CBs of these 6 feeders. The output<br />
contacts shall be wired to self reset heavy duty trip relays to trip Main & Tie<br />
17