6.3 Network & Simulation Studies.<br />

To assess stability and re-validate the formation of proposed islands under<br />

different scenario, Dynamic network simulation studies and stability analysis<br />

would be required beforehand. The study would analyze degree of swings in<br />

the bus voltages, line flows and relative rotor angles, etc. The studies would<br />

also suggest any additional measures to be taken for enhancing success rate<br />

of islanding. Line network diagram of system showing boundary of islands is<br />

given as Annexure VI.<br />

6.4 Regular preventive Maintenance.<br />

In order to ensure reliability of the island, regular preventive maintenance of<br />

control switchgears, relays & protection system and governors at each of the<br />

generating units, as covered in the scheme, shall be carried out by the<br />

respective agencies.<br />

6.5 Additional Requirements:<br />

Any additional provision to meet with the functional requirements of the<br />

<strong>Scheme</strong> shall be incorporated during implementation stage.<br />

6.6 Periodic Review of islanding scheme.<br />

The islanding scheme shall be reviewed periodically, at least once a year, by<br />

the SLDC in consultation with the utilities. Changes in system topology,<br />

loading conditions, generation/demand growth, etc shall be reviewed and<br />

necessary changes in the islanding scheme shall be made accordingly.<br />

6.6 Training and mock drills<br />

The detailed procedures/instructions shall be developed and training shall be<br />

imparted to the System Operators at SLDC and other personnel involved at<br />

the sub stations and generating stations. A detailed mock drills shall be<br />

conducted regularly, at least once in a year. SLDC shall co-ordinate this<br />

activity with the utilities.<br />