6.3 Network & Simulation Studies.<br />
To assess stability and re-validate the formation of proposed islands under<br />
different scenario, Dynamic network simulation studies and stability analysis<br />
would be required beforehand. The study would analyze degree of swings in<br />
the bus voltages, line flows and relative rotor angles, etc. The studies would<br />
also suggest any additional measures to be taken for enhancing success rate<br />
of islanding. Line network diagram of system showing boundary of islands is<br />
given as Annexure VI.<br />
6.4 Regular preventive Maintenance.<br />
In order to ensure reliability of the island, regular preventive maintenance of<br />
control switchgears, relays & protection system and governors at each of the<br />
generating units, as covered in the scheme, shall be carried out by the<br />
respective agencies.<br />
6.5 Additional Requirements:<br />
Any additional provision to meet with the functional requirements of the<br />
<strong>Scheme</strong> shall be incorporated during implementation stage.<br />
6.6 Periodic Review of islanding scheme.<br />
The islanding scheme shall be reviewed periodically, at least once a year, by<br />
the SLDC in consultation with the utilities. Changes in system topology,<br />
loading conditions, generation/demand growth, etc shall be reviewed and<br />
necessary changes in the islanding scheme shall be made accordingly.<br />
6.6 Training and mock drills<br />
The detailed procedures/instructions shall be developed and training shall be<br />
imparted to the System Operators at SLDC and other personnel involved at<br />
the sub stations and generating stations. A detailed mock drills shall be<br />
conducted regularly, at least once in a year. SLDC shall co-ordinate this<br />
activity with the utilities.<br />