26 132KV S/S Malout 66KV Abulkhurana 33MVA<br />
27 132KV S/S Abohar 33KV Khuhi Khera line Br, out of ckt<br />
28 132Kv Kotkarore 66KV Mudki line 37.5MVA<br />
P&M Circle Ludhiana<br />
29 132KV Doraha 132KV Bilaspur-Sihora line, 66KV<br />
68MVA<br />
Payal Chawa line, Setco line<br />
30 220KV Sahnewal 66KV Latala 20.5MVA<br />
31 132KV Sawadi 132/11 T/F T-1 20 MVA<br />
32 220KV Jagraon 66KV Sidhwan Bet & Rasulpur &<br />
55MVa<br />
Raikot<br />
33 220KV Gobindgarh-I 3No, 220/66KV T-1, T-2&T-3 226MVA<br />
34 132KV Amloh 66KV Bhadson line 55MVA<br />
35 220KV Dhandari-I 2x100MVA 220/66KV side 184MVA<br />
36 220KV Goraya 33KV Apra & Dosanj Kalan 55MVA<br />
37 220KV S/S Gobingarh-III 66KV Chaurwala 50MVA<br />
28