07.06.2015 Views

Operation Manual

Operation Manual

Operation Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cable Connection<br />

<br />

<br />

<br />

Switch Box <br />

<br />

(For CE Spec only)<br />

<br />

<br />

<br />

<br />

Teaching Pendant<br />

<br />

<br />

COM 1<br />

<br />

<br />

<br />

<br />

[Back of JR2200N Series]<br />

<br />

<br />

COM 2 (Optional)<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

PC<br />

For RS-232C extension<br />

I/O-SYS<br />

I/O-1 (Optional)<br />

COM 3 (Optional)<br />

For RS-232C extension<br />

I/O-S Area Sensor, etc. <br />

Power Cord<br />

Connect a short connector if you are not using the parts indicated by an asterisk.<br />

The robot will not start if nothing is connected. Use the dust cover on unused<br />

connectors to prevent any trouble with static or dust. (Except for outlets)<br />

Setup<br />

5<br />

JR2000N Desktop Robot

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!