<strong>ANJANI</strong> <strong>MINOR</strong> <strong>IRRIGATION</strong> <strong>PROJECT</strong><br />

(Taluka :- Tasgaon. Dist. :- Sangli)<br />

ANNEXURE - II<br />

Prescribed Unit Water Use Entitlement for Flow Irrigation in Rabi and H.W.Season in a normal year.<br />

Sr.No. Description Quantity Unit<br />

1 Utilisation for Rabi season & H.W.Season<br />

Total utilisation (planned) 1.89 Mm 3<br />

Deduct planned utilisation in Kharif Mm 3<br />

Net for Rabi 1.89 Mm 3<br />

2 Deduct from (1) Mm 3<br />

i) Reduction in the live storage due to siltation (assumed) Mm 3<br />

ii) Carry over Mm 3<br />

iii) Net losses from reservoir (considering post monsoon flow),<br />

evaporation losses as per project report. 0.30 Mm 3<br />

iv) Net river losses in case of storage cum pick-up weir scheme<br />

(Note applicable in this case) Mm 3<br />

v) Non-irrigation requirement from reservoir as per Schedule I<br />

Mm 3<br />

vi) Non-irrigation requirement from canal system Mm 3<br />

vii) Water allocation for bulk consumers (Block) Mm 3<br />

Total deductions 0.30 Mm 3<br />

3 Water available for irrigation at canal head in Rabi &<br />

H.W.seasons ie.(1-2) 1.59 Mm 3<br />

4 Deduct from (3)<br />

i) i) Water Allocation for lift irrigation for reservoir actually area<br />

sanctioned 49.41 ha. Out of which 29.94 for flow lift and 19.47<br />

for pressurised lift (as per G.R. 3.60%)<br />

i.e. = 1.59 x 0.0360 = 0.0572 Mm3<br />

0.0572 Mm 3<br />

ii) Deduction: Water allocation for lift and pressurized irrigation<br />

schemes on river portion between Dam and Pickup Weir. 0 Mm 3<br />

iii) Water allocation for lift and pressurized irrigation schemes on<br />

river between dam and pickup weir. 0 Mm 3<br />

Total Deduction 0.0572 Mm 3<br />

Net (3-4) 1.5328 Mm 3<br />

5 Net water available for irrigation at the head of WUA (3-4) x<br />

efficiency from canal head to minor head (1.5328 x 0.80)<br />

1.2262 Mm 3<br />

6 Season wise allocation of net water available for flow<br />

irrigation<br />

(a) Rabi (100%) - (Minor irrigation scheme rabi season only) 1.2262 Mm 3<br />

(b) H.W. (….%) Mm 3<br />

7 Net CCA for flow irrigation<br />

Total CCA<br />

499 ha<br />

Entitlement-UK-Web<br />

1 Anjani-uk-07-08


Sr.No. Description Quantity Unit<br />

Deduct<br />

i) CCA for reservoir lift 49.41 ha<br />

ii) lift on KTWeir<br />

0ha<br />

iii) Canal lift<br />

0ha<br />

Total deduction<br />

49.41 ha<br />

Net CCA<br />

449.59 ha<br />

8 Prescribed unit water use Entitlement per ha. area of net<br />

CCA for Rabi 0.002727 Mm 3<br />