5.3 Standardization Considerations<br />
Optical Link Study Group (<strong>OLSG</strong>) <strong>Final</strong> <strong>Report</strong><br />
IOAG.T.<strong>OLSG</strong>.20<strong>12</strong>.V1<br />
Table 31 represents a set of parameters that need to be defined to ensure compatibility in a<br />
cross-support scenario using optical space communication. The parameters are split into<br />
two categories:<br />
<br />
<br />
Cross-support interface parameters describing characteristics that must be mutually<br />
communicated and agreed upon in order to ensure compatibility for cross support<br />
(i.e., the “What”).<br />
Implementation parameters describing station-internal engineering characteristics of<br />
the ground station’s technical implementation in order to satisfy/meet the interface<br />
parameters (i.e., the “How”). Conversely, an existing station’s<br />
design/implementation will determine the level of compatibility with a given<br />
interface requirement.<br />
Note that the Beacon, Transmit and Receive Telescope and Laser implementation<br />
parameters are listed separately, following their logical functions. The actual<br />
implementation could well combine some or all of the functions in a single device—or keep<br />
them as separate installations.<br />