5.3 Standardization Considerations<br />

Optical Link Study Group (<strong>OLSG</strong>) <strong>Final</strong> <strong>Report</strong><br />

IOAG.T.<strong>OLSG</strong>.20<strong>12</strong>.V1<br />

Table 31 represents a set of parameters that need to be defined to ensure compatibility in a<br />

cross-support scenario using optical space communication. The parameters are split into<br />

two categories:<br />

<br />

<br />

Cross-support interface parameters describing characteristics that must be mutually<br />

communicated and agreed upon in order to ensure compatibility for cross support<br />

(i.e., the “What”).<br />

Implementation parameters describing station-internal engineering characteristics of<br />

the ground station’s technical implementation in order to satisfy/meet the interface<br />

parameters (i.e., the “How”). Conversely, an existing station’s<br />

design/implementation will determine the level of compatibility with a given<br />

interface requirement.<br />

Note that the Beacon, Transmit and Receive Telescope and Laser implementation<br />

parameters are listed separately, following their logical functions. The actual<br />

implementation could well combine some or all of the functions in a single device—or keep<br />

them as separate installations.<br />

Page | 139