16.06.2015 Views

OLSG Report_Final_06_05_12 - Interagency Operations Advisory ...

OLSG Report_Final_06_05_12 - Interagency Operations Advisory ...

OLSG Report_Final_06_05_12 - Interagency Operations Advisory ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Optical Link Study Group (<strong>OLSG</strong>) <strong>Final</strong> <strong>Report</strong><br />

IOAG.T.<strong>OLSG</strong>.20<strong>12</strong>.V1<br />

Figure 26: The cumulative distribution of the amount of data successfully<br />

sent to the ground by the LEO satellite for the seven site network of ground<br />

stations.<br />

3.1.5 Link Budget<br />

3.1.5.1 Downlink Budget<br />

An example link budget for an elevation of 20° is shown in Figure 27. With Tx- and Rxaperture<br />

diameters of 5 and 50 cm respectively, the calculated link margin is about 4 dB.<br />

The scintillation loss (estimated to be -2 dB) can be mitigated by channel coding.<br />

Page | 57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!