Optical Link Study Group (<strong>OLSG</strong>) <strong>Final</strong> <strong>Report</strong><br />

IOAG.T.<strong>OLSG</strong>.20<strong>12</strong>.V1<br />

L1 UPLINK BUDGET<br />

INPUT PARAM ETERS<br />

LINK BUDGET<br />

Slant Range 2.0E+<strong>06</strong> km Tx Ave Power 48.45 dBm<br />

Elevation 20 deg<br />

Tx Antenna Gain<br />

109.66 dBi<br />

TRANSMITTER<br />

Tx Array Gain<br />

9.03 dBi<br />

Tx Wavelength 1.55 µm Tx Transmission Loss -3.47 dB<br />

Tx Ave Power 70.0 W Tx Pointing Loss -1.56 dB<br />

EIRP<br />

132.<strong>12</strong> dBW<br />

Tx Array Size 8 apertures Isotropic Space Loss -324.20 dB<br />

Tx Aperture Diam 0.15 m Atmospheric Loss -3.65 dB<br />

Tx Angular Diam 2.71 arcsec<br />

Tx Footprint Diam 2.63E+04 m Irradiance at rx aperture 1.40E-07 W /m^2<br />

Tx Optical Transmission 45.0 % Rx Antenna Gain 108.74 dBi<br />

Tx Depointing 0.80 arcsec Rx Array Gain 0.00 dB<br />

Rx Transmission Loss<br />

-4.56 dB<br />

ATMOSPHERIC LOSSES Rx Pointing Loss 0.00 dB<br />

Atm Zenith Transmittance 95.0 % Total Optical Path Loss -110.00 dB<br />

Relative Airmass 2.90<br />

Atm Transmission Along LOS 86.2 % Ave Power at Rx Detector -61.54 dBm<br />

Scintillation Loss -3.0 dB<br />

RECEIVER Req. Irradiance at rx aperture 63.0E-09 W/m^2<br />

Rx Aperture Diam 0.14 m Link M argin (Irradiance) 3.46 dB<br />

Rx FOV 5.00 arcsec<br />

Rx Depointing 0.20 arcsec<br />

Rx Optical Transmission 35.0 %<br />

Rx Array Size 1 apertures<br />

Req. Irradiance at rx aperture<br />

63.0E-09 W/m^2<br />

Figure 43: Example uplink budget for the L1 Scenario.<br />

3.6.6 Ground Station Cost<br />

Table 21 provides a cost estimation of the optical ground stations for the L1 Scenario.<br />

Table 21: Ground station costs for the L1 Scenario (k€).<br />

L1 Scenario Ground Station Costs in k€<br />

Tenerife<br />

Hartebeesthoek<br />

Total<br />

Initial Station Investment Costs:<br />

Terminal (telescope, dome, and electronics) 6,230 6,230<br />

Site Facilities Investment Costs (Buildings, Power,<br />

energy, etc.) 1,560 393<br />

Wide Area Communication Investment Costs<br />

(ground comm) 0 <strong>12</strong>42<br />

Weather and Atmospheric monitoring 250 250<br />

Aviation Safety System 350 350<br />

Subtotal Initial Station Investment Costs 8,390 8,465 16,855<br />

Recurring Operating Costs:<br />

Site and Terminal Operating Costs 1,168 1,168<br />

Communication Operating Costs 390 390<br />

Subtotal Recurring Operating Costs 1,558 1,558 3,116<br />