JOINT OPERATION OF DIFFERENT<br />

CHARACTERISTICS RAILWAYS<br />

NETWORKS.<br />

INFRASTRUCTURE SOLUTIONS<br />

Ruth de San Dámaso Martín<br />

rsdamaso@adif.es


3 WAYS TO SOLVE THE GAUGE COMPATIBILITY<br />

PROBLEM IN THE SPANISH NETWORK<br />

<strong>Changeover</strong> facilities and axles changing installations<br />

Multiple gauge sleeper and third rail<br />

2 HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS<br />

Spanish <strong>Rail</strong>ways need to transfer rail traffic between High<br />

Speed lines (UIC gauge 1,435 mm) and Conventional lines<br />

(Iberian gauge 1,668 mm).<br />

The fact is that it´s not only necessary inside the Iberian<br />

peninsula but also to connect with Europe through the<br />

French border.<br />

3<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

AUTOMATIC TRACK GAUGE CHANGEOVER IN SPAIN<br />

260.000 trains, 325.000.000 passengers since 1969<br />

60 High speed trains change track gauge daily.<br />

Trains change gauge and electrification system at 15 Km/h<br />

without stopping.<br />

<strong>Changeover</strong> operations in High Speed Lines for<br />

2.009<br />

L.A.V. Madrid – Barcelona<br />

L.A.V. Madrid – Valladolid<br />

L.A.V. Madrid – Sevilla<br />

8.030<br />

Operations<br />

10.950<br />

Operations<br />

5.056<br />

Operations<br />

4<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

1969- First TALGO changeover facility in Portbou<br />

1981- Second changeover facility in Irun<br />

1992 – Connection of conventional lines (1668 mm) with the<br />

first Spanish High Speed Line Madrid-Sevilla in UIC gauge<br />

(1435 mm)<br />

2000 –Development of dual changeover facility for Talgo and<br />

CAF trains.<br />

2008 – Integration of both TALGO and CAF systems in the<br />

same platform and the latest innovation: CAF + TALGO + DB<br />

RAFIL / SUW 2000 platform<br />

5<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

<strong>Changeover</strong> facilities for passenger traffic. 2009<br />

6<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TECHNOLOGIES<br />

The technologies developed by TALGO and CAF are based on<br />

the same principles but are not geometrically compatible.<br />

ADIF has integrated both technologies in an unique<br />

installation called dual changeover facility<br />

(cambiador dual).<br />

Currently there are 8 dual changeover facilities in use for<br />

commercial passenger trains.<br />

7<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TECHNOLOGIES<br />

First development. Turnable Dual <strong>Changeover</strong><br />

8<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TECHNOLOGIES<br />

Second development. Horizontal Dual<br />

<strong>Changeover</strong><br />

9<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TECHNOLOGIES<br />

Third development. Both technologies by means of a<br />

single platform<br />

TCRS 3 allows the automatic<br />

gauge change of both TALGO<br />

and CAF technologies by means<br />

of a single platform with<br />

Track Gauge Interoperability<br />

Different track gauges in different European<br />

countries.<br />

- Time reduction to<br />

moving elements. Main<br />

features:<br />

commutate from one to the<br />

other technology.<br />

- Space reduction for the<br />

whole system.<br />

10<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TECHNOLOGIES<br />

Unification of wheel’s displacement guide rails for both TALGO<br />

and CAF technologies. The elastic TALGO system is adopted as<br />

the common element.<br />

TCRS3 Prototype. TALGO<br />

position<br />

TCRS3 Prototype. CAF<br />

position<br />

Track Gauge Interoperability<br />

Different track gauges in different European<br />

countries.<br />

11<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TECHNOLOGIES<br />

TCRS3 Prototype<br />

12 HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TECHNOLOGIES<br />

Latest innovation. UNICHANGER (TCRS 4)<br />

CAF + TALGO + SUW 2000/RAFIL – DB platform<br />

13<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

OPERATION<br />

As the train goes through the changing installation at a speed<br />

in between 10 and 20 Km/h, the weight is shifted from the<br />

wheels to a set of external bearings attached to the shafts<br />

and then, the wheels are moved to the new position by a set<br />

of guides embedded in the installation.<br />

14<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

OPERATION<br />

There are two type of operations in an automatic changeover<br />

installation depending of the type of trains being used:<br />

• Towed trains. (Old TALGO trains without automatic gauge<br />

changer in tractor heads)<br />

• Auto propelled trains (New TALGO and CAF trains with<br />

automatic gauge changer in driving shafts)<br />

15<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

THE OPERATION WITH TOWED TRAINS<br />

The operation with towed trains takes the following steps :<br />

1. Arrival of the train, detaching and parking tractor head.<br />

6 minutes.<br />

2. Passing of the first shaft through the changeover installation,<br />

normally using the force of gravity.<br />

3 minutes.<br />

3. Attaching the tractor head on the other side.<br />

4 minutes.<br />

4. Pulling the rest of the train through the changeover<br />

installation.<br />

2 minutes.<br />

Total used time<br />

15 minutes<br />

16<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TALGO OPERATIONS<br />

Operations with TALGO serial VII (Towed Train) in the<br />

changeover facility of Plasencia de Jalón (Zaragoza).<br />

17<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

TALGO OPERATIONS<br />

Operations with TALGO serial VI (Towed Train) in the<br />

changeover facility of Medina del Campo (Valladolid).<br />

18<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

THE OPERATION WITH SELF PROPELLED TRAINS<br />

The operation with self propelled trains is made in less than a<br />

minute.<br />

The train enters the changeover installation at a speed<br />

between 10 and 20 Km/h and automatically commutes<br />

traction, brakes and voltage.<br />

19<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

THE OPERATION WITH SELF PROPELLED TRAINS<br />

Serial 130 (TALGO) in<br />

Valdestillas, Valladolid.<br />

Serial 120 (CAF) in<br />

Puigverd, Lleida.<br />

20<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

THE OPERATION WITH SELF PROPELLED TRAINS<br />

Serial 120 (CAF) in<br />

Valdestillas, Valladolid.<br />

Serial BT (TALGO) in Campo<br />

Grande, Valladolid.<br />

21<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

SYMBOLS<br />

T<br />

Talgo <strong>Changeover</strong><br />

C<br />

CAF <strong>Changeover</strong><br />

T/C<br />

Dual <strong>Changeover</strong><br />

Vertical Talgo / CAF T/C<br />

Dual <strong>Changeover</strong> Horizontal<br />

Talgo / CAF<br />

UIC gauge (1.435 mm)<br />

Iberian gauge<br />

(1.668 mm)<br />

Mixed gauge (1.668<br />

/1435 mm)<br />

End of line<br />

Cars of dragging<br />

It indicates the direction of<br />

raise of a ramp bigger than<br />

3 mm/m<br />

station<br />

22<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

First Generation <strong>Changeover</strong><br />

<strong>Changeover</strong> of Portou (1969-)<br />

Portbou<br />

T<br />

to Cerbere<br />

to Cerbere and<br />

Perpignan<br />

España<br />

Túnel de Balitres<br />

Francia<br />

<strong>Changeover</strong> of Irún (1981-)<br />

Irún<br />

T<br />

España<br />

to Hendaya<br />

to Hendaya<br />

and<br />

Burdeos<br />

Francia<br />

23<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

Second generation <strong>Changeover</strong><br />

<strong>Changeover</strong> of Madrid-Atocha (1992-)<br />

Madrid-Atocha<br />

Cercanías<br />

Madrid-Puerta de<br />

Atocha<br />

<strong>Changeover</strong> of Córdoba (1992-2006)<br />

T<br />

to Entrevías and Alcalá<br />

to Santa<br />

Catalina<br />

to Cerro Negro and Barcelona to Madrid<br />

to Ciudad Real and Sevilla<br />

to Sevilla<br />

to Valchillón and<br />

Málaga<br />

T<br />

Córdoba<br />

24<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

Second generation <strong>Changeover</strong><br />

<strong>Changeover</strong> of Majarabique, Sevilla (1993-Talgo and 1999-CAF)<br />

to Huelva<br />

to Sevilla and Cádiz<br />

C<br />

T<br />

Majarabique (Apt.)<br />

to Madrid<br />

<strong>Changeover</strong> of Lleida (2003-2006)<br />

to Manresa and Barcelona<br />

Lleida<br />

Pirineus<br />

Section in service since march 2006<br />

to Reus and<br />

Tarragona<br />

to Bif. Artesa de Lleida<br />

to Madrid<br />

T<br />

25<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

Third generation <strong>Changeover</strong><br />

Experimental changeover of Río Adaja (2001-2008)<br />

to Medina<br />

del Campo<br />

T/C<br />

to Olmedo<br />

de Adaja<br />

<strong>Changeover</strong> of Plasencia de Jalón (2003)<br />

to Madrid<br />

Plasencia de<br />

Jalón (Apt.)<br />

T/C<br />

to Grisén and<br />

Zaragoza<br />

to Zaragoza<br />

and Lleida<br />

26<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

<strong>Changeover</strong> of Zaragoza Delicias (2003)<br />

to Casetas and<br />

Madrid<br />

to Bif. Moncasi and<br />

Madrid<br />

T/C<br />

La Almozara<br />

Zaragoza<br />

Delicias<br />

<strong>Changeover</strong> of Huesca (2003-2007)<br />

to Jaca and<br />

Canfranc<br />

to Tardienta<br />

and Zaragoza<br />

C<br />

Huesca<br />

27<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

<strong>Changeover</strong> of Puigverd (2006-2007)<br />

to Bif. Artesa de Lleida<br />

and Madrid<br />

to Lleida<br />

C<br />

Puigverd de Lleida<br />

to l´Espluga and Roda (in<br />

service since dic 06)<br />

to Borges and<br />

Reus<br />

<strong>Changeover</strong> of Roda de Bará (2006-2008)<br />

to Casetas and<br />

Madrid<br />

to Bif. Artesa de<br />

Lleida and Madrid<br />

T/C<br />

T/C<br />

Roda de Bará<br />

Bonastre<br />

to St.Vicenç de<br />

Calders and<br />

Barcelona<br />

28<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

<strong>Changeover</strong> of Antequera-Santa Ana (2006)<br />

to Córdoba and<br />

Madrid (LAV)<br />

Antequera<br />

Santa Ana<br />

T/C<br />

a Málaga (LAV en construcción)<br />

T/C<br />

to Antequera and<br />

Granada<br />

a Fuente from Piedra and<br />

Córdoba (Eje.Transv.)<br />

to Fuente from Piedra and<br />

Córdoba<br />

to Bobadilla,<br />

Algeciras and<br />

Málaga<br />

29<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

<strong>Changeover</strong> of Valdestillas and Valladolid (2007)<br />

to Olmedo and Madrid Ch (LAV)<br />

to Valladolid (access<br />

underground in the future)<br />

T/C<br />

to Medina and Madrid P.Pío<br />

Valdestillas<br />

to Viana and Hendaya<br />

to Valladolid (provisional)<br />

El Pinar<br />

30<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

<strong>Changeover</strong> of Campo Grande (2007)<br />

to Olmedo and Madrid<br />

Ch. (LAV)<br />

to Medina and Madrid P.Pío<br />

to Argales<br />

Valladolid<br />

C.G.<br />

Valladolid<br />

C.G.<br />

T/C<br />

to La Esperanza<br />

and La Carrera<br />

31<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

<strong>Changeover</strong> of Medina del Campo (2008)<br />

to Valladolid and<br />

Hendaya<br />

to Zamora and<br />

Orense<br />

MEDINA DEL<br />

CAMPO<br />

T/C<br />

to Río Adaja (experimental railway track OM)<br />

and Olmedo<br />

to Salamanca and<br />

Portugal<br />

to Gomeznarro<br />

and Madrid P.Pío<br />

32<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

<strong>Changeover</strong> of Madrid Chamartín (2007)<br />

to Madrid At.Cercanías and Alicante<br />

to Pitis and Pinar<br />

to Madrid Hortaleza, Barcelona and Burgos<br />

Vía 15<br />

T/C<br />

to Fuencarral<br />

Taller 1.435<br />

Vía 16<br />

to Segovia and Valladolid<br />

33<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


CHANGEOVER<br />

INSTALLATIONS IN SPAIN<br />

<strong>Changeover</strong> of Alcolea de Córdoba (2009)<br />

to Puertollano<br />

and Madrid-Atocha (LAV)<br />

to Jaén and Alcázar<br />

de San Juan<br />

T/C<br />

to Córdoba and<br />

Sevilla (LAV)<br />

to Sevilla<br />

34<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


AXIS-CHANGING<br />

CONECTION WITH CONVENTIONAL RAILWAY<br />

NETWORK DURING CONSTRUCTION.<br />

Axis-changing devices built at Construction Bases<br />

• Useful only for construction trains and machines.<br />

• Instalations are usually left to help further maintenance.<br />

35<br />

HIGH-SPEED RAIL NETWORK EXECUTIVE DIRECTION


MULTIPLE GAUGE SLEEPERS<br />

BOTH GAUGES<br />

• Sleepers with possibility of track assembly in both gauges<br />

that allows to change conventional lines to standard gauge in<br />

the future (developed in 1989).<br />

36<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


MULTIPLE GAUGE SLEEPERS<br />

TECHNOLOGIES<br />

37<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THREE-RAILS SLEEPERS<br />

TWO GAUGES AT SAME TIME<br />

•Developed in 1999. Sleepers with both gauges that allows<br />

operate simultaneously trains in Spanish and Standard<br />

gauge.<br />

38<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THREE-RAILS SLEEPERS<br />

TWO GAUGES AT SAME TIME<br />

Detail of fastening<br />

of closer rails,<br />

possible with<br />

Pandrol or SKL-1<br />

clip.<br />

Finished <strong>Rail</strong>track<br />

39<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THREE-RAILS SLEEPERS<br />

SWITCH GEARS:<br />

Mixed gauge switch<br />

Change of side rail<br />

40<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THREE-RAILS SLEEPERS<br />

Three <strong>Rail</strong>s <strong>Rail</strong>road. 2009 scenario<br />

Olmedo –<br />

Medina del Campo<br />

Tardienta –<br />

Huesca Girona –<br />

Figueres<br />

41<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THREE-RAILS SLEEPERS<br />

ELECTRICAL SYSTEMS: CONTACT LINE EFFECTS<br />

42<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THREE-RAILS SLEEPERS<br />

SEPARATION OF ELECTRICAL SYSTEMS<br />

• 25 kV A.C. 3 kV D.C.<br />

• It´s needed to aisolate the catenary and returns<br />

43<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THREE-RAILS SLEEPERS<br />

EFFECTS ON SAFETY SYSTEMS: ASFA BALISE DOUBLE WIDE<br />

ASFA DOUBLE-WIDE BALISE<br />

ASFA CONVENTIONAL-WIDE BALISE<br />

ASFA DOUBLE-WIDE BALISE wider and<br />

centered with the two axes to get<br />

onboard detection equipment both in<br />

Iberian width and <strong>International</strong> width.<br />

44<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THREE-RAILS SLEEPERS<br />

EFFECTS ON SAFETY SYSTEMS : WIDTH DETECTION<br />

Detection is needed to properly define wide<br />

pathways depending on the width of each<br />

change in the act.<br />

It is possible to have two trains of different<br />

widths in a same track circuit.<br />

The wide detection is performed by axle<br />

counters.<br />

45<br />

HIGH-SPEED RAILWAY NETWORK EXECUTIVE DIRECTION


THANK YOU FOR YOUR ATTENTION<br />

Ruth De San Dámaso Martín<br />

rsdamaso@adif.es

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!