- Page 1: Indianapolis Metropolitan Planning
- Page 5 and 6: 1. Introduction Background Metropol
- Page 7 and 8: The current Metropolitan Planning A
- Page 9 and 10: 2. Work Program and Products SAFETE
- Page 11 and 12: 6. Be adopted and transmitted to IN
- Page 13 and 14: 3. Indianapolis Long-Range Transpor
- Page 16 and 17: Air Quality Conformity The 9-county
- Page 18 and 19: • Highway Safety Improvement Prog
- Page 20 and 21: Air Quality Conformity Determinatio
- Page 22 and 23: 18 (this page intentionally left bl
- Page 24 and 25: The funding for projects shown in t
- Page 26 and 27: ‣ Provide improvements to air qua
- Page 28 and 29: Formal Amendment Process The MPO pr
- Page 30 and 31: • Moving any project phase progra
- Page 32 and 33: attached in PDF format. No hard cop
- Page 34 and 35: 30 federal fiscal year (October 1)
- Page 36 and 37: Federal legislation and the State o
- Page 38 and 39: FTA Funding FTA funds are distribut
- Page 40 and 41: new formula grant program allocated
- Page 42 and 43: those traditionally underserved by
- Page 44 and 45: their neighborhoods. The EJ Program
- Page 46 and 47: evisited. As a rule, however, the M
- Page 48 and 49: scope, schedule, and budget, and re
- Page 50 and 51: 46 (this page intentionally left bl
- Page 52 and 53:
Responsibilities It is somewhat mis
- Page 54 and 55:
e reallocated from slower activitie
- Page 56 and 57:
Data The primary data source for de
- Page 58 and 59:
54 that it feels is unsupportable o
- Page 60 and 61:
56 (this page intentionally left bl
- Page 62 and 63:
58 developed to fund local programs
- Page 64 and 65:
60 (this page intentionally left bl
- Page 66 and 67:
BACKGROUND Federal legislation requ
- Page 68 and 69:
D. Provision of pertinent certifica
- Page 70 and 71:
1. Each local public agency within
- Page 72 and 73:
V. OFFICERS 68 i. The Chair of the
- Page 74 and 75:
B. The Chair and voting members (or
- Page 76 and 77:
Unified Planning Work Program 1. Th
- Page 78 and 79:
74 (this page intentionally left bl
- Page 80 and 81:
76 • making information available
- Page 82 and 83:
Policy 3.2 Those plans and programs
- Page 84 and 85:
MPO website http://www.indympo.org/
- Page 86 and 87:
Contact Those seeking more informat
- Page 88 and 89:
APPENDIX D TITLE VI COMPLAINT PROCE
- Page 90 and 91:
III. Responsible Official The overa
- Page 92 and 93:
• If the allegations are not subs
- Page 94 and 95:
APPENDIX E INDIANAPOLIS MPO TRANSPO
- Page 96 and 97:
92 • All applications that do not
- Page 98 and 99:
CONTACT INFORMATION Comments or que
- Page 100 and 101:
96 (this page intentionally left bl
- Page 102 and 103:
Introduction The Indianapolis Metro
- Page 104 and 105:
• telework/telecommuting programs
- Page 106 and 107:
APPENDIX: CONGESTION MITIGATION & A
- Page 108 and 109:
8. Transit Service Expansion Projec
- Page 110 and 111:
1 B. Existing Roadway Capacity Impr
- Page 112 and 113:
D. Roadway Reconstruction/Rehabilit
- Page 114 and 115:
F. Bridge Replacement (100 points p
- Page 116 and 117:
H. Intersection or Intersection Gro
- Page 118 and 119:
J. Pedestrian Enhancement (100 poin
- Page 120:
L. Transit Enhancement Capital Proj