09.07.2015 Views

the Conservation Rooflight® Pleated Blind Installation Manual

the Conservation Rooflight® Pleated Blind Installation Manual

the Conservation Rooflight® Pleated Blind Installation Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pleated</strong> <strong>Blind</strong> <strong>Installation</strong> <strong>Manual</strong>Step 7.1On <strong>the</strong> right jamb, at <strong>the</strong> cill of <strong>the</strong> Rooflight, align <strong>the</strong> bottom edge of Drilling Template 1(Part A) to <strong>the</strong> bottom edge of <strong>the</strong> integral lining and abut <strong>the</strong> left side to <strong>the</strong> bottom. Drillthrough Hole A. Note: Do not drill deeper than 10mm through <strong>the</strong> integral lining.Step 7.2Using one of <strong>the</strong> screws (Part B), loosely screw in <strong>the</strong> left blind channel (Part G) through <strong>the</strong>hole created in step 7.0.10 Issue 01 | March 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!