09.07.2015 Views

the Conservation Rooflight® Pleated Blind Installation Manual

the Conservation Rooflight® Pleated Blind Installation Manual

the Conservation Rooflight® Pleated Blind Installation Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pleated</strong> <strong>Blind</strong> <strong>Installation</strong> <strong>Manual</strong>Step 4.0At <strong>the</strong> head of <strong>the</strong> Rooflight, align <strong>the</strong> bottomedge of Drilling Template 1 (Part A) to <strong>the</strong> bottomedge of <strong>the</strong> integral Rooflight lining and abut <strong>the</strong>right side of <strong>the</strong> template to <strong>the</strong> left jamb lining.Drill through Hole A. Note: Do not drill deeper than 10mm through <strong>the</strong> integral lining.Step 4.1Align <strong>the</strong> bottom edge of Drilling Template 1 (Part A) to <strong>the</strong> bottom edge of <strong>the</strong> integralRooflight lining and abut <strong>the</strong> left side of <strong>the</strong> template to <strong>the</strong> right jamb lining. Drill throughHole A. Note: Do not drill deeper than 10mm through <strong>the</strong> integral lining.Issue 01 | March 2011 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!