the Conservation Rooflight® Pleated Blind Installation Manual
the Conservation Rooflight® Pleated Blind Installation Manual
the Conservation Rooflight® Pleated Blind Installation Manual
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Pleated</strong> <strong>Blind</strong> <strong>Installation</strong> <strong>Manual</strong>HOLE C(7/64" / 2.8mm Drill bit)Part A: Drilling Template 1Carefully push <strong>the</strong> drilling template out of <strong>the</strong>manual cover and disconnect from Part F. Useas instructed in <strong>the</strong> manual.Position this edge facing <strong>the</strong> glassHOLE A(7/64" / 2.8mm Drill bit)DRILLING TEMPLATE 1Align arrows to <strong>the</strong> bottom edge of rooflight integral liningAlign arrows to <strong>the</strong> bottom edge of rooflight integral liningDRILLING TEMPLATE 2Centre linePart F: Drilling Template 2Carefully push <strong>the</strong> drilling template out of <strong>the</strong>manual cover and disconnect from Part A. Useas instructed in <strong>the</strong> manual.HOLE B(7/64" / 2.8mm Drill bit)Issue 01 | March 2011 19