State Route 6 Corridor Study Final Report - Cobb County Government
State Route 6 Corridor Study Final Report - Cobb County Government
State Route 6 Corridor Study Final Report - Cobb County Government
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 3-1:<br />
ARC Envision6 RTP Planned and Programmed Projects within the SR 6 <strong>Study</strong> Area<br />
Total Cost<br />
Network<br />
Year<br />
Sponsor Location Length<br />
(miles)<br />
TIP/RTP<br />
Status<br />
1 2010 $586,000<br />
<strong>Cobb</strong><br />
<strong>County</strong><br />
Programmed City of<br />
Austell<br />
N/A 2010 $1,350,000<br />
Programmed GDOT Paulding<br />
<strong>County</strong><br />
2010 $3,500,000<br />
2010 $1,500,000<br />
2020 $31,000,000<br />
Programmed GRTA Douglas<br />
<strong>County</strong><br />
Programmed GRTA Paulding<br />
<strong>County</strong><br />
Long-Range MARTA Fulton<br />
<strong>County</strong><br />
and the<br />
City of<br />
Atlanta<br />
Long Range GDOT Multi-<br />
<strong>County</strong><br />
ARC GDOT<br />
Project<br />
Project PI Description/Location Endpoints<br />
Type<br />
Number Number<br />
CO-AR- 0004504 US 78 (Veterans From SR 6 (Thornton Road) Pedestrian<br />
BP185<br />
Memorial Highway) in Douglas <strong>County</strong> to<br />
Facility<br />
Rosehill Street in City of<br />
Austell<br />
PA- 641830 SR 61 (Villa Rica From Winndale Road to US Bridge<br />
061C2<br />
Highway), widen 2 to 4 278 (Jimmy Campbell Capacity<br />
lanes<br />
Parkway)<br />
AR-606 0007920 Park and ride facilities SR 6/I-20 West Transit<br />
for Xpress bus service<br />
Facilities<br />
AR-610 0007924 Park and ride facilities SR 6/Hiram Transit<br />
for Xpress bus service<br />
Facilities<br />
M-AR-<br />
I-20 West Bus Rapid From H.E. Holmes<br />
Fixed<br />
287<br />
Transit (BRT)<br />
MARTA Station/Fulton Guideway<br />
Industrial Boulevard<br />
Transit<br />
Capital<br />
8.1 2020 $270,795,750<br />
Managed<br />
Lanes<br />
(Auto/Bus)<br />
From SR 280 (H.E. Holmes<br />
Drive) in City of Atlanta to<br />
SR 6 (Thornton Road) in<br />
Douglas <strong>County</strong><br />
From SR 6 (Thornton Road)<br />
to Bright Star Road in<br />
Douglas <strong>County</strong><br />
0001760 I-20 West Managed<br />
Lanes (4 lanes)<br />
AR-H-<br />
200<br />
9.9 2020 $178,223,000<br />
Programmed GDOT Douglas<br />
<strong>County</strong><br />
Managed<br />
Lanes<br />
(Auto/Bus)<br />
0003165 I-20 West Managed<br />
Lanes (4 lanes)<br />
AR-H-<br />
201<br />
3.3 2020 $97,500,000<br />
Programmed GDOT City of<br />
Atlanta<br />
Interchange<br />
Capacity<br />
From SR 6 (Thornton Road)<br />
to I-285 West - includes<br />
interchange and ramp<br />
reconstruction and<br />
associated 6-lane<br />
collector/distributor system<br />
AR-939 0000379 I-285 at I-20 West<br />
Interchange<br />
Reconstruction<br />
<strong>Final</strong> <strong>Report</strong> January 2008