18.11.2012 Views

State Route 6 Corridor Study Final Report - Cobb County Government

State Route 6 Corridor Study Final Report - Cobb County Government

State Route 6 Corridor Study Final Report - Cobb County Government

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 3-1:<br />

ARC Envision6 RTP Planned and Programmed Projects within the SR 6 <strong>Study</strong> Area<br />

Total Cost<br />

Network<br />

Year<br />

Sponsor Location Length<br />

(miles)<br />

TIP/RTP<br />

Status<br />

1 2010 $586,000<br />

<strong>Cobb</strong><br />

<strong>County</strong><br />

Programmed City of<br />

Austell<br />

N/A 2010 $1,350,000<br />

Programmed GDOT Paulding<br />

<strong>County</strong><br />

2010 $3,500,000<br />

2010 $1,500,000<br />

2020 $31,000,000<br />

Programmed GRTA Douglas<br />

<strong>County</strong><br />

Programmed GRTA Paulding<br />

<strong>County</strong><br />

Long-Range MARTA Fulton<br />

<strong>County</strong><br />

and the<br />

City of<br />

Atlanta<br />

Long Range GDOT Multi-<br />

<strong>County</strong><br />

ARC GDOT<br />

Project<br />

Project PI Description/Location Endpoints<br />

Type<br />

Number Number<br />

CO-AR- 0004504 US 78 (Veterans From SR 6 (Thornton Road) Pedestrian<br />

BP185<br />

Memorial Highway) in Douglas <strong>County</strong> to<br />

Facility<br />

Rosehill Street in City of<br />

Austell<br />

PA- 641830 SR 61 (Villa Rica From Winndale Road to US Bridge<br />

061C2<br />

Highway), widen 2 to 4 278 (Jimmy Campbell Capacity<br />

lanes<br />

Parkway)<br />

AR-606 0007920 Park and ride facilities SR 6/I-20 West Transit<br />

for Xpress bus service<br />

Facilities<br />

AR-610 0007924 Park and ride facilities SR 6/Hiram Transit<br />

for Xpress bus service<br />

Facilities<br />

M-AR-<br />

I-20 West Bus Rapid From H.E. Holmes<br />

Fixed<br />

287<br />

Transit (BRT)<br />

MARTA Station/Fulton Guideway<br />

Industrial Boulevard<br />

Transit<br />

Capital<br />

8.1 2020 $270,795,750<br />

Managed<br />

Lanes<br />

(Auto/Bus)<br />

From SR 280 (H.E. Holmes<br />

Drive) in City of Atlanta to<br />

SR 6 (Thornton Road) in<br />

Douglas <strong>County</strong><br />

From SR 6 (Thornton Road)<br />

to Bright Star Road in<br />

Douglas <strong>County</strong><br />

0001760 I-20 West Managed<br />

Lanes (4 lanes)<br />

AR-H-<br />

200<br />

9.9 2020 $178,223,000<br />

Programmed GDOT Douglas<br />

<strong>County</strong><br />

Managed<br />

Lanes<br />

(Auto/Bus)<br />

0003165 I-20 West Managed<br />

Lanes (4 lanes)<br />

AR-H-<br />

201<br />

3.3 2020 $97,500,000<br />

Programmed GDOT City of<br />

Atlanta<br />

Interchange<br />

Capacity<br />

From SR 6 (Thornton Road)<br />

to I-285 West - includes<br />

interchange and ramp<br />

reconstruction and<br />

associated 6-lane<br />

collector/distributor system<br />

AR-939 0000379 I-285 at I-20 West<br />

Interchange<br />

Reconstruction<br />

<strong>Final</strong> <strong>Report</strong> January 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!