18.11.2012 Views

State Route 6 Corridor Study Final Report - Cobb County Government

State Route 6 Corridor Study Final Report - Cobb County Government

State Route 6 Corridor Study Final Report - Cobb County Government

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 3-1:<br />

ARC Envision6 RTP Planned and Programmed Projects within the SR 6 <strong>Study</strong> Area<br />

Total Cost<br />

Network<br />

Year<br />

Sponsor Location Length<br />

(miles)<br />

TIP/RTP<br />

Status<br />

Project<br />

Type<br />

Description/Location Endpoints<br />

GDOT<br />

PI<br />

Number<br />

ARC<br />

Project<br />

Number<br />

Point<br />

0.92 2030 5,837,400<br />

Fulton<br />

(South)<br />

Long Range City of<br />

East<br />

Point<br />

4.23 2020 $24,334,000<br />

Programmed GDOT Paulding<br />

<strong>County</strong><br />

lanes Roadway<br />

Capacity<br />

FS-200C 751140 Washington Road: From Delowe Drive to General<br />

Segment 3, widen 2 to 4 Legion Way<br />

Purpose<br />

lanes<br />

Roadway<br />

Capacity<br />

PA-015 S000163 Bill Carruth Parkway, From SR 92 (Hiram<br />

General<br />

widening and new Douglasville Highway) near Purpose<br />

alignment, 4 lanes intersection of Panter Roadway<br />

School Road to intersection Capacity<br />

of US 278 (Jimmy Lee<br />

Smith Parkway) and SR 120<br />

(Marietta Highway)<br />

2.21 2020 $25,605,000<br />

Programmed GRTA Paulding<br />

<strong>County</strong><br />

General<br />

Purpose<br />

Roadway<br />

Capacity<br />

From intersection of SR 92<br />

(Hiram Douglasville<br />

Highway) and SR 120<br />

Connector (Hiram Sudie<br />

Road) to US 278 (Jimmy<br />

Lee Smith Parkway)<br />

between Metromont Road<br />

and Poplar Springs Road<br />

From Dallas-Nebo Road to<br />

US 278 (Jimmy Campbell<br />

Parkway)<br />

PA-016 0004688 East Hiram Parkway, 4<br />

lanes<br />

3.09 2020 $37,283,000<br />

Programmed GDOT Paulding<br />

<strong>County</strong><br />

General<br />

Purpose<br />

Roadway<br />

Capacity<br />

General<br />

Purpose<br />

Roadway<br />

Capacity<br />

621570 SR 61 (Villa Rica<br />

Highway): Segment 3,<br />

widen 2 to 4 lanes<br />

PA-<br />

061C1<br />

13.8 2030 $87,864,000<br />

Long Range GDOT Paulding<br />

<strong>County</strong><br />

From SR 6 Business<br />

(Memorial Drive) to Bartow<br />

<strong>County</strong> Line<br />

PA-061D 0007866 SR 61 (Confederate<br />

Avenue / Cartersville<br />

Highway): Segment 4,<br />

widen 2 to 4 lanes<br />

<strong>Final</strong> <strong>Report</strong> January 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!