State Route 6 Corridor Study Final Report - Cobb County Government
State Route 6 Corridor Study Final Report - Cobb County Government
State Route 6 Corridor Study Final Report - Cobb County Government
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 3-1:<br />
ARC Envision6 RTP Planned and Programmed Projects within the SR 6 <strong>Study</strong> Area<br />
Total Cost<br />
Network<br />
Year<br />
Sponsor Location Length<br />
(miles)<br />
TIP/RTP<br />
Status<br />
Project<br />
Type<br />
Description/Location Endpoints<br />
GDOT<br />
PI<br />
Number<br />
ARC<br />
Project<br />
Number<br />
Point<br />
0.92 2030 5,837,400<br />
Fulton<br />
(South)<br />
Long Range City of<br />
East<br />
Point<br />
4.23 2020 $24,334,000<br />
Programmed GDOT Paulding<br />
<strong>County</strong><br />
lanes Roadway<br />
Capacity<br />
FS-200C 751140 Washington Road: From Delowe Drive to General<br />
Segment 3, widen 2 to 4 Legion Way<br />
Purpose<br />
lanes<br />
Roadway<br />
Capacity<br />
PA-015 S000163 Bill Carruth Parkway, From SR 92 (Hiram<br />
General<br />
widening and new Douglasville Highway) near Purpose<br />
alignment, 4 lanes intersection of Panter Roadway<br />
School Road to intersection Capacity<br />
of US 278 (Jimmy Lee<br />
Smith Parkway) and SR 120<br />
(Marietta Highway)<br />
2.21 2020 $25,605,000<br />
Programmed GRTA Paulding<br />
<strong>County</strong><br />
General<br />
Purpose<br />
Roadway<br />
Capacity<br />
From intersection of SR 92<br />
(Hiram Douglasville<br />
Highway) and SR 120<br />
Connector (Hiram Sudie<br />
Road) to US 278 (Jimmy<br />
Lee Smith Parkway)<br />
between Metromont Road<br />
and Poplar Springs Road<br />
From Dallas-Nebo Road to<br />
US 278 (Jimmy Campbell<br />
Parkway)<br />
PA-016 0004688 East Hiram Parkway, 4<br />
lanes<br />
3.09 2020 $37,283,000<br />
Programmed GDOT Paulding<br />
<strong>County</strong><br />
General<br />
Purpose<br />
Roadway<br />
Capacity<br />
General<br />
Purpose<br />
Roadway<br />
Capacity<br />
621570 SR 61 (Villa Rica<br />
Highway): Segment 3,<br />
widen 2 to 4 lanes<br />
PA-<br />
061C1<br />
13.8 2030 $87,864,000<br />
Long Range GDOT Paulding<br />
<strong>County</strong><br />
From SR 6 Business<br />
(Memorial Drive) to Bartow<br />
<strong>County</strong> Line<br />
PA-061D 0007866 SR 61 (Confederate<br />
Avenue / Cartersville<br />
Highway): Segment 4,<br />
widen 2 to 4 lanes<br />
<strong>Final</strong> <strong>Report</strong> January 2008