09.07.2015 Views

fiscal year 2013 annual listing of obligated projects ohio and ... - OKI

fiscal year 2013 annual listing of obligated projects ohio and ... - OKI

fiscal year 2013 annual listing of obligated projects ohio and ... - OKI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FISCAL YEAR <strong>2013</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGIONOHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTSButler CountyPID Facility Section Project Description PhaseTotalAuthorizedAmountFederalAuthorizedAmountRemainingFundsSR-129 in Butler County from IR 75to SR 4, 4-lane using advanceconstruction. This PID is to either15693 BK TIDhelp retire the bonds purchsedthrough the TID <strong>and</strong>/or receiveCON $220,242,242 $181,456,828 $38,785,414reimbursement from FHWA or theTID for SR 129 & Allen Roadinterchange (Union Center).24664 IR 75-3.76/1.90Widen IR 75 from Cincinnati-DaytonRoad in Butler County to 0.2 milessouth <strong>of</strong> Middletown in WarrenCON $132,657,625 $54,043,262 $78,614,363County.75899 SR 747-4.25Upgrade SR 747 by widening fromtwo lanes to four lanes with turnlanes as necessary, with minor CON $5,151,505 $3,587,513 $1,563,992horizontal <strong>and</strong> verticalimprovements.76290SR 4B-1.04 (Phase Widen Bypass 4 to four lanes most2) <strong>of</strong> project.CON $8,120,668 $5,567,838 $2,552,830Replace bridge superstructure over77915 SR 73-12.20 a tributary <strong>of</strong> Cotton Run. CON CON $294,520 $294,520 $0Authorized in FY <strong>2013</strong>77917 SR 177-8.61Replace existing superstructure onbridge no. BUT-177-0861 over FourMile Creek.CON Authorized in FY <strong>2013</strong>CON $1,435,860 $1,148,688 $287,17281988 Butler-Warren RdWiden existing two lane roadway t<strong>of</strong>ive lanes with curb <strong>and</strong> gutter;improve the intersection <strong>of</strong>Ttylersville Road <strong>and</strong> Butler WarrenRoad including signal upgrade.CON $12,948,123 $7,768,874 $5,179,2498240682423Reily Millville RoadBridge ReplacmentReplace functionally deficient steelbeam bridge over Indian Creek.Replace superstructure <strong>and</strong>Hamilton Newrehabilitate substructure <strong>of</strong>London Road Bridgestructurally deficient steel trussReplacementbridge over Indian Creek.83392SR 4B-3.50 (PhaseConstruct Superstreet intersection at1)Hamilton Mason Road <strong>and</strong> SR 4B.Widen SR 4B to 4 lanes, includeupgrades <strong>and</strong> widening at SR 12983395 SR 4B-4.24 interchange structure, <strong>and</strong> addedturn lanes at SR 4 <strong>and</strong> SR 4Bintersection. Phase 5A83811 SR 732-0.00Resurface SR 732 throughout ButlerCounty, omitting Oxford.Resurfacing <strong>and</strong> pavement repair on84359 SR 130-0.00 SR 130 in Butler County. CONAuthorized in FY <strong>2013</strong>84747Add an additional turn lane from SRSR 4-12.31/Liberty4 to NB Liberty Fairfield Road.Fairfield RoadCON Authorized in FY <strong>2013</strong>CON $662,636 $659,692 $2,944CON $1,427,204 $1,421,992 $5,212CON $4,733,700 $2,655,632 $2,078,068CON $5,144,916 $4,115,933 $1,028,983CON $1,650,236 $1,320,191 $330,045CON $1,113,150 $890,520 $222,630CON $4,617,921 $1,470,752 $3,147,1692

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!