09.07.2015 Views

fiscal year 2013 annual listing of obligated projects ohio and ... - OKI

fiscal year 2013 annual listing of obligated projects ohio and ... - OKI

fiscal year 2013 annual listing of obligated projects ohio and ... - OKI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FISCAL YEAR <strong>2013</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGIONOHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTSClermont CountyPID Facility Section Project Description PhaseTotalAuthorizedAmountFederalAuthorizedAmountRemainingFunds75682 SR 132-12.43Plane <strong>and</strong> pave a portion <strong>of</strong> SR 132in Clermont County.CON $970,287 $776,230 $194,057Plane <strong>and</strong> pave a portion <strong>of</strong> US 52 in75695 US 52-13.31 Clermont County.CON CON $2,683,530 $2,146,824 $536,706Authorized in FY <strong>2013</strong>76289 IR 275-10.15/8.95Reconstruct interchange <strong>of</strong> IR 275<strong>and</strong> SR 32.CON $72,541,339 $33,316,782 $39,224,557CON Authorized in FY <strong>2013</strong>77099 US 27-18.55Widening US 27 including theaddition <strong>of</strong> a center turn lane,sidewalks, street lighting & signals CON $5,263,660 $4,191,853 $1,071,807from Merry Day Drive to Oxfordnorth corporate line.79005 CR 351-2.80Replace old SR 32 bridge over theNorfolk <strong>and</strong> Southern Railroad.CON $1,757,679 $1,400,533 $357,14681425 SR 125-0.40Safety project at Mt. Carmel Road,IR 275 <strong>and</strong> Nine Mile Roadintersections <strong>of</strong> SR 125.CON $6,187,884 $2,194,740 $3,993,144CON Authorized in FY <strong>2013</strong>81626 US 52-6.74Resurface portion <strong>of</strong> US 52 from theNew Richmond corporate line to SR CON $1,077,955 $862,364 $215,59182139CR 132-2.50(Wolfpen-PleasantHill Road)82140 SR 28-2.0582141 Bethel Signals8255382555Aicholtz RoadConnector (CR 3)Eastgate North (CR382-0.00)743.Improve Wolfpen-Pleasant Hill byadding center turn lane with a 4-footsidewalk on one side.Construct a 5 lane (from existingthree lane) curb <strong>and</strong> gutter sectionwith a four foot sidewalk on oneside.Installation <strong>of</strong> new traffic signalcontrollers <strong>and</strong> signal heads <strong>and</strong>coordinated timing on SR 125.Project will provide a new networkconnection from Mt. Carmel-Tabasco Road on Old State Route74 approximately 7000 feet toEastgate Boulevard.Relocate Eastgate North with threelane section.CON Authorized in FY <strong>2013</strong>CON $3,238,080 $1,619,039 $1,619,041CON $2,851,108 $2,048,702 $802,406CON $172,194 $120,595 $51,599PE $300,000 $300,000 $0CON $3,498,738 $2,228,135 $1,270,60383537 SR 28-2.12Construct loop ramp from SR 28 WBto IR 275 SB.CON $8,158,130 $1,904,291 $6,253,83983605 SR 749-2.87Replace failed combination stone<strong>and</strong> concrete retaining wall.CON $975,468 $780,375 $195,09383661Stonelick CoveredBridgeRehabilitate Stonelick CoveredBridge.CON $1,535,656 $447,771 $1,087,885(CR 116-1.21) CON Authorized in FY <strong>2013</strong>84474 SR 133-28.00Resurfacing <strong>and</strong> pavement repair onSR 133 from US 50 to SR 727.CON $1,350,602 $1,080,482 $270,120Add center turn lane <strong>and</strong> 4 foot84731paved shoulders from Mt. CarmelClough Pike (CRTobasco Road to Glen-Este33)Withamsville Road.CON $5,250,400 $5,250,400 $0CON Authorized in FY <strong>2013</strong>85105 SR 774-0.00Minor rehabilitation--all state funds.$0 (state <strong>and</strong>CON $1,133,000CON Authorized in FY <strong>2013</strong>local funds)$1,133,00085233 SR 125-6.90Construct left turn lane from SR 125to SR 132.ROW $760,139 $684,125 $76,0144

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!