10.07.2015 Views

Easterly Tunnel Dewatering Pump Station

Easterly Tunnel Dewatering Pump Station

Easterly Tunnel Dewatering Pump Station

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Material Handling12’x12’ roof hatch providesaccess for wheel or trackmounted crane to movelarge equipment to andfrom cavern.5 Ton Jib Crane designed tolift mid sized items to atgradefloor level 609.034

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!