10.07.2015 Views

Underground Ground Control Major Hazard Standard - MIRMgate

Underground Ground Control Major Hazard Standard - MIRMgate

Underground Ground Control Major Hazard Standard - MIRMgate

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><strong>Underground</strong> <strong>Ground</strong> <strong>Control</strong>** Uncontrolled copy. Use latest revision **SupportedWork Plan<strong>Control</strong>led to an approved standard and made safe through the appropriate use ofcontrolled blasting, scaling, ground support and ground reinforcement.Each excavation and rock type shall have defined minimum approved supportspecifications (e.g. stable spans, minimum ground support, minimum groundreinforcement spacings and types, specifications for installation, specificationsfor ground reinforcement elements). In certain circumstances ground may beconsidered supported when no ground support or reinforcement is installed. Inthis case a geotechnical evaluation would have been undertaken to determine thata situation does not exist which may possibly result in a rockfall or otherwiseaffect the stability of the excavation. In pre-existing areas of the mine, historicalperformance of the ground would also be considered.A set of work instructions for specific locations in a mine. It usually includes asurvey plan of the proposed work area identifying geotechnical or other relevanthazards.B Related DocumentsSAF-MHS-05<strong>Underground</strong> Mobile EquipmentSAF-MHS-08Safe Working at HeightSAF-MHS-09Inrushes and SubsidenceSAF-MHS01-R01<strong>Ground</strong> <strong>Control</strong> Inspection ChecklistSAF-MHS01-R05<strong>Ground</strong> <strong>Control</strong> Ladder Rising ConsiderationsC Revision Information.Revision 2 issued 19/06/00Revision 1 issued 24/05/99Revision 0 issued 12/05/97SectionPurpose and Scope1.1 Producing the<strong>Ground</strong> <strong>Control</strong> Plan1.3 Determining theMining Method andEquipment Options1.4.1 <strong>Major</strong> Uncontrolled<strong>Ground</strong> Failure1.4.2 Determining the MostAppropriate <strong>Ground</strong>DifferenceWording amendedDot point eleven add “<strong>Ground</strong>”Paragraph one and two amended and mergedChanged from “Inrushes”Renumbered and this whole section has been moved from 1.4.4. Wording notchangedSAF-MHS-01 Rev. 1 DOCS No. 55945 Issued: 19/06/00 Page 16 of 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!