10.07.2015 Views

Underground Ground Control Major Hazard Standard - MIRMgate

Underground Ground Control Major Hazard Standard - MIRMgate

Underground Ground Control Major Hazard Standard - MIRMgate

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><strong>Underground</strong> <strong>Ground</strong> <strong>Control</strong>** Uncontrolled copy. Use latest revision **• Are there any major structures or controllingfeatures?• What are the dips and strikes of the geologicalstructures (ore body and veins)?• What are the joint orientations, spacing andproperties?• What are the boundary conditions—prevailingstress, hydrogeological regime, geomorphologicalregime, depth?1.3 Determining the Mining Method andEquipment OptionsThe person delegated by the Mine Manager shall usethe information gathered in Section 1.3 to determinethe alternative mining methods and equipmentoptions.Whatever method is used, the following issues shallbe addressed in the <strong>Ground</strong> <strong>Control</strong> Plan:• What is the size of the deposit?• Do we need to go underground?• What are the alternative mining methods andalternative mine designs, equipment, sequencingand scheduling to minimise or eliminate theexposure of personnel to particularly hazardousexcavations? The delegate shall recommend thepreferred mining method and shall prepare thefollowing details to be included in the <strong>Ground</strong><strong>Control</strong> Plan:– A description of the excavation layouts,orientations, sizes, shapes and type of excavationmethods in all areas of the mine for the selectedmining method– The actual or proposed serviceabilityrequirements of each excavation– Plans showing actual or proposed mine layouts• What are the methods to be used to develop steeplyinclined excavations. In selecting a rising method,the selection process should look at all the optionsin the order of preference of: non-entry methods,mechanised methods, other entry methods andladder rising. Alternative methods of establishingrises shall be considered in the mine designprocess and the need to use ladder rising designedout of the mining process where ever possible. Noladder rising shall be undertaken until anevaluation of all other alternatives has been carriedout and a risk assessment has verified that ladderrising is the only practicable method availableRefer to the supporting documentSAF-MHS01-R05 <strong>Ground</strong> <strong>Control</strong> Ladder RisingConsiderations for more detail of the issues thatshall be considered in the risk assessment.• Should dedicated, purpose-built rock-boltingapparatus be used?• What is the life of the mine?• What are the geotechnical domains (groundconditions) within the mine?• What influence will each alternative have on theregional stability?• What will be the heights and widths of drives, withconsideration given to stability, profile, and theability to inspect and scale the drives?• What extraction sequence will minimise the timeany production area remains open and active?• What are the mine design assumptions for themine?In determining the mining method and equipment tobe used, each mine shall have in place a systematicplanning and design process and a checklist orguidelines for all mine design criteria.For example, factors of safety, extraction ratios,pillar and long hole extraction sequences, maximumpowder factors, use of down-hole in preference to upholes,air, water, power and ventilation services,access and egress routes, excavation dimensions andany other factors which may be required by thatmine.1.4 Designing the Excavation and <strong>Ground</strong><strong>Control</strong> SystemThe <strong>Ground</strong> <strong>Control</strong> Co-ordinator shall arrange for ageotechnical evaluation to be carried out for the orebody and host rock.1.4.1 Inrushes <strong>Major</strong> Uncontrolled <strong>Ground</strong>FailureTo eliminate the possibility of major uncontrolledground failure which could result in surfacesubsidence or inrushes of material such as water,mud, rock or fill material:• Each excavation or sequence of excavations (wherecaving is not part of the mining method)shall bedesigned to be stable, and the design shall be basedon sound geotechnical principles• Where the excavation sequencing is identified asbeing important for ground control, the excavationsequences:– Shall be stipulated as part of the design– Shall not be altered unless approved in writing bythe Mine Manager• The procedures and processes to create theexcavations shall not be designed to induceuncontrolled instability, either locally or regionally• During excavations, any deviations from the planor design shall be recorded, and the design reevaluatedto ensure local and regional stability ismaintained.SAF-MHS-01 Rev. 1 DOCS No. 55945 Issued: 19/06/00 Page 3 of 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!