10.07.2015 Views

Underground Ground Control Major Hazard Standard - MIRMgate

Underground Ground Control Major Hazard Standard - MIRMgate

Underground Ground Control Major Hazard Standard - MIRMgate

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><strong>Underground</strong> <strong>Ground</strong> <strong>Control</strong>** Uncontrolled copy. Use latest revision **Step 4. Install the ground reinforcement.The ground reinforcement must be installedaccording the SWP for that groundreinforcement type, and any specialinstructions that might be required by the<strong>Ground</strong> <strong>Control</strong> Plan must be followed.Step 5. Make the final adjustment of groundreinforcement.The final adjustment or modification mayinclude post-tensioning, post-grouting,placing extra bolts to pin straps and mesh,application of curing sprays on shotcrete,etc. These tasks must be treated with thesame care as during the initial installationstage, and will often involve specialinstructions in the <strong>Ground</strong> <strong>Control</strong> Plan andin the SWP.Step 6. Check the installation and groundconditions.The <strong>Ground</strong> <strong>Control</strong> Operator must ensurethat the ground reinforcement has beeninstalled according to the <strong>Ground</strong> <strong>Control</strong>Plan, but has not (regardless of the Plan)inadvertently produced a hazardouscondition.Step 7. Record ground conditions and groundreinforcement conditions.It is important to record the groundconditions, the condition of the installedground reinforcement and any variations ordifficulties encountered during installation.This information is vital for the <strong>Ground</strong>Conditions Model. A record of no variationsor no difficulties is equally as important.Obtain correct planAssemble and checkmaterials and equipment<strong>Hazard</strong> identificationassessment and actionDrill holes and/orprepare surfaceInstall ground supportPretension or adjust asrequiredRecord conditionsand/or variationsCheck installation andground conditionsThe <strong>Ground</strong> <strong>Control</strong> Installation ProcessSAF-MHS-01 Rev. 1 DOCS No. 55945 Issued: 19/06/00 Page 20 of 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!