10.07.2015 Views

Underground Ground Control Major Hazard Standard - MIRMgate

Underground Ground Control Major Hazard Standard - MIRMgate

Underground Ground Control Major Hazard Standard - MIRMgate

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><strong>Underground</strong> <strong>Ground</strong> <strong>Control</strong>** Uncontrolled copy. Use latest revision **• Scaling• Jumbo scaling• Scaling machine operation• Manual scaling and scaling from a platform• Installing ground reinforcement• Shotcreting of the rock mass• Survey mark-up, sampling mark-up andgeotechnical mapping• Blast hole drilling• Blasting (charging and initiation)• Bogging• Rising• Ladder rising• Mechanical rising• Rise on pilot boreholes.• Raise boring• BackfillingIf other critical activities are identified, then SWPsshall be developed for them.SAF-MHS-01 Rev. 1 DOCS No. 55945 Issued: 19/06/00 Page 6 of 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!