Compliance Assessment Plan - Fremantle Ports

Compliance Assessment Plan - Fremantle Ports

Compliance Assessment Plan - Fremantle Ports

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STATUS OF THIS DOCUMENTThis document has been produced by the Office of the Appeals Convenor as an electronic version ofthe original Statement for the proposal listed below as signed by the Minister and held by this Office.Whilst every effort is made to ensure its accuracy, no warranty is given as to the accuracy orcompleteness of this document.The State of Western Australia and its agents and employees disclaim liability, whether in negligenceor otherwise, for any loss or damage resulting from reliance on the accuracy or completeness of thisdocument.Copyright in this document is reserved to the Crown in right of the State of Western Australia.Reproduction except in accordance with copyright law is prohibited.Published on 18 August 2009 Statement No 801STATEMENT THAT A PROPOSAL MAY BE IMPLEMENTED(PURSUANT TO THE PROVISIONS OF THEENVIRONMENTAL PROTECTION ACT 1986)FREMANTLE PORTS INNER HARBOUR AND CHANNEL DEEPENING,RECLAMATION AT ROUS HEAD AND OFFSHORE PLACEMENT OF DREDGEDMATERIALProposal:The proposal is to deepen the <strong>Fremantle</strong> Inner Harbour,Entrance Channel and the Deep Water Channel by dredgingapproximately 3.1 million cubic metres to provide for furtherreclamation at Rous Head of approximately 27 hectares and foroffshore disposal.The proposal is further documented in schedule 1 of thisstatement.Proponent:<strong>Fremantle</strong> <strong>Ports</strong>Proponent Address: 1 Cliff Street, <strong>Fremantle</strong>, WA 6160<strong>Assessment</strong> Number: 1621Report of the Environmental Protection Authority: Report 1330The proposal referred to in the above report of the Environmental Protection Authority maybe implemented. The implementation of that proposal is subject to the following conditionsand procedures:1 Proposal Implementation1-1 The proponent shall implement the proposal as documented and described inschedule 1 of this statement subject to the conditions and procedures of thisstatement.Published on:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!