10.07.2015 Views

TENDER FOR SUPPLY, INSTALLATION ... - Port of Chennai

TENDER FOR SUPPLY, INSTALLATION ... - Port of Chennai

TENDER FOR SUPPLY, INSTALLATION ... - Port of Chennai

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

espective values will not be considered for determining the Tenderer’s eligibility.The Completion Certificate shall indicate the work order reference and value forwhich the work order was executed.The Tenderer shall have ESI registration code and the documentary evidencefor the same may be submitted along with the Tender.3.0. SCOPE OF WORK:i) Supply and installation <strong>of</strong> 30 Nos ecosafe maintenance free earthingsystem.ii) Supply and installation <strong>of</strong> 25 X 3 mm GI flats encased in a PVC 50 mm diapipe as enclosure.iii) Testing and commissioning the earthing system.4.0. DETAILED TECHNICAL SPECIFICATION:i) Supply and installation <strong>of</strong> ecosafe maintenance free earthing systemcomprising <strong>of</strong> 25 mm diameter and 2 metre long earth electrode <strong>of</strong> lowcarbon steel electrode with 250 micron copper coating with 1 bag <strong>of</strong> (50pounds) carbon based environment friendly back fill compound and suitableclamp confirming to UL467-2007 & BS: 7430; IEC:60364-5.ii) Supply and installation <strong>of</strong> 25 X 3 mm GI flats encased in a 50 mm dia pipePVC enclosure for connecting earth electrode with street light posts. Thesame shall be laid 3 inch below the ground level.iii) Testing and commissioning the earthing system.5.0. GENERAL TERMS AND CONDITION:-i) The work shall be completed within 60 days from the date <strong>of</strong> receipt <strong>of</strong> order.ii) The Contractor shall arrange their own tools and plants and other materialsand components required for the above work.iii) The safe custody <strong>of</strong> men and materials, tools and plants required for thecontractor shall be the responsibility <strong>of</strong> the contractor and Trust will not haveany responsibility in this regard.iv) Transportation <strong>of</strong> materials shall be the responsibility <strong>of</strong> the contractor.v) Electric power supply will be provided free <strong>of</strong> cost and the consumption <strong>of</strong>power will be charged as per the Trust’s scale <strong>of</strong> rates.vi) The bidder shall give an undertaking that they have not made any paymentor illegal gratification to any person/authority connected with the bid process21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!