Active Park Planning Projects<br />
Friday, January 13, 2012<br />
Lead Project Name Team %Complete Est. Completion<br />
VDOT/NPS/PCC<br />
VDOT<br />
TE&S<br />
RPCA<br />
Jones Point Improvement/Renovation RMK JB<br />
Notes: RPCA Staff as <strong>City</strong> lead. Completion date remains June 25, 2012.<br />
Four Mile Pedestrian Bridge DW RK<br />
12-Jun-12<br />
01-Mar-12<br />
11:39:04 AM<br />
Notes: Contract drafting between NVRC and design consultant(s). Scope is being refined based on cost<br />
constraints. Contract expected by end <strong>of</strong> January.<br />
Freedman's Cemetery LD RMK<br />
Notes: All Bids were rejected :<br />
Rebid:<br />
January 4, 11:00AM pre-bid meeting at site<br />
01-Nov-12<br />
Freedman's Cemetery Sculpture AC RK<br />
Preliminary Plan<br />
Notes: Alisa Carrel coordinating RFP for artists. Timing based on anticipated construction schedule.<br />
Witter BC RK<br />
40% CA 01-Nov-12<br />
Notes: Construction is underway. Final earthwork elements are concluding and field construction has<br />
started. Anticipated project delivery Spring 2012 and s<strong>of</strong>tball field/plantings Fall 2012.<br />
Holmes Run trail Feasibility Study DW<br />
15-Feb-12<br />
Notes: TE&S is working with consultant team to improve trail between Brookvalley Park and 395. Three<br />
concepts have been proposed.<br />
S. Washington St. Improvements RPCA: DG, RK, J<br />
Notes: RPCA attend 90% consultant work pre-reiew. Schedule:<br />
1/18: BAR<br />
1/19: PRC<br />
Trail Improvements<br />
Notes: Demonstration using pourous paving, in collaboration with TES. TES to initiate community outreach.<br />
1 & 7 East Del Ray LD JL<br />
99% 18-Aug-11<br />
Notes: Gameboards to be installed weather permitting. Plantings installed late September.<br />
Park dedication withDRCA to occur next Spring.<br />
Playground open to the public in mid-August.<br />
ADA Study RMK JL DW<br />
Notes: Scope <strong>of</strong> work needed. DW and JL to begin.<br />
Friday, January 13, 2012 Page 1 <strong>of</strong> 7