Active Park Planning Projects<br />

Friday, January 13, 2012<br />

Lead Project Name Team %Complete Est. Completion<br />

VDOT/NPS/PCC<br />

VDOT<br />

TE&S<br />

RPCA<br />

Jones Point Improvement/Renovation RMK JB<br />

Notes: RPCA Staff as <strong>City</strong> lead. Completion date remains June 25, 2012.<br />

Four Mile Pedestrian Bridge DW RK<br />

12-Jun-12<br />

01-Mar-12<br />

11:39:04 AM<br />

Notes: Contract drafting between NVRC and design consultant(s). Scope is being refined based on cost<br />

constraints. Contract expected by end <strong>of</strong> January.<br />

Freedman's Cemetery LD RMK<br />

Notes: All Bids were rejected :<br />

Rebid:<br />

January 4, 11:00AM pre-bid meeting at site<br />

01-Nov-12<br />

Freedman's Cemetery Sculpture AC RK<br />

Preliminary Plan<br />

Notes: Alisa Carrel coordinating RFP for artists. Timing based on anticipated construction schedule.<br />

Witter BC RK<br />

40% CA 01-Nov-12<br />

Notes: Construction is underway. Final earthwork elements are concluding and field construction has<br />

started. Anticipated project delivery Spring 2012 and s<strong>of</strong>tball field/plantings Fall 2012.<br />

Holmes Run trail Feasibility Study DW<br />

15-Feb-12<br />

Notes: TE&S is working with consultant team to improve trail between Brookvalley Park and 395. Three<br />

concepts have been proposed.<br />

S. Washington St. Improvements RPCA: DG, RK, J<br />

Notes: RPCA attend 90% consultant work pre-reiew. Schedule:<br />

1/18: BAR<br />

1/19: PRC<br />

Trail Improvements<br />

Notes: Demonstration using pourous paving, in collaboration with TES. TES to initiate community outreach.<br />

1 & 7 East Del Ray LD JL<br />

99% 18-Aug-11<br />

Notes: Gameboards to be installed weather permitting. Plantings installed late September.<br />

Park dedication withDRCA to occur next Spring.<br />

Playground open to the public in mid-August.<br />

ADA Study RMK JL DW<br />

Notes: Scope <strong>of</strong> work needed. DW and JL to begin.<br />

Friday, January 13, 2012 Page 1 <strong>of</strong> 7