MANUAL OF INSTRUCTIONS for the Guidance of Surveyors
MANUAL OF INSTRUCTIONS for the Guidance of Surveyors
MANUAL OF INSTRUCTIONS for the Guidance of Surveyors
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(4) Where a curve is surveyed at <strong>the</strong> intersection <strong>of</strong> road allowances orpreviously surveyed road right <strong>of</strong> ways and is not a portion <strong>of</strong> a longercontinuous surveyed right <strong>of</strong> way, such curve shall be monumented on<strong>the</strong> boundaries <strong>of</strong> <strong>the</strong> land affected at <strong>the</strong> B.C. and <strong>the</strong> E.C.ExistingsurveysNew Survey4. Where it is impossible or impracticable to establish a monument on <strong>the</strong>new road right <strong>of</strong> way limit opposite a section or quarter section corner dueto a slough or marsh or o<strong>the</strong>r such obstruction, a monument shall beestablished on <strong>the</strong> new right <strong>of</strong> way limit on ei<strong>the</strong>r side <strong>of</strong> <strong>the</strong> obstructionand a connection shown to <strong>the</strong> section or quarter section line. Thereference monument may be omitted.Quarter LineDist.90 o ObstructionsSlough9