11.07.2015 Views

MANUAL OF INSTRUCTIONS for the Guidance of Surveyors

MANUAL OF INSTRUCTIONS for the Guidance of Surveyors

MANUAL OF INSTRUCTIONS for the Guidance of Surveyors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8. When a survey is per<strong>for</strong>med adjacent to a correction line or where <strong>the</strong>re is achange in systems <strong>of</strong> survey, angular and linear measurements shall besecured at each end <strong>of</strong> <strong>the</strong> survey and at least once every mile to connect<strong>the</strong> two survey limits. Monuments are not required to be established at <strong>the</strong>points where <strong>the</strong> section lines are projected to intersect <strong>the</strong> limit <strong>of</strong> <strong>the</strong>survey.CorrectionLineMaintenance Type 1 and Road Right <strong>of</strong> Way combinedDist.Dist.Est. pt.AngleAngleDist.AngleDist.Dist.Est. pt.9. (1) Non-closures within <strong>the</strong> Surveyor’s own measurements shall notexceed <strong>the</strong> greater <strong>of</strong> 1:10,000 or 0.020 metres.Tolerances(2) Non-closures with <strong>the</strong> Surveyor’s own measurements combined with<strong>the</strong> measurements <strong>of</strong> previous surveys shall not exceed <strong>the</strong> greater <strong>of</strong>1:5,000 or 0.020 metres.(3) Where conflicting measurements or non-closures exceeding 1:5,000 areencountered with previous surveys, every ef<strong>for</strong>t shall be made toresolve <strong>the</strong>se differences with <strong>the</strong> Surveyor responsible be<strong>for</strong>e reportingto <strong>the</strong> Director <strong>of</strong> Legal Surveys, SGD. The report shall include anycorrespondence and commitment from <strong>the</strong> Surveyor responsible toundertake any necessary fieldwork and/or plan amendments.(4) Where conflicting linear measurements <strong>of</strong> existing road widenings areencountered over 0.020 metres <strong>the</strong> Surveyor shall make every ef<strong>for</strong>t toresolve <strong>the</strong> differences as stated in Sub-section 9. (3) <strong>of</strong> this Part.Where <strong>the</strong> road widenings agree within <strong>the</strong> 0.020 metre tolerance, <strong>the</strong>previous road widening shall be held to maintain consistency betweenplans.(5) These limits <strong>of</strong> error will apply to surveys over reasonably level and opencountry. Where certain conditions apply, <strong>the</strong> Director <strong>of</strong> Legal Surveys, SGD,may allow a greater limit <strong>of</strong> error.5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!