11.07.2015 Views

S type - Kitagawa Europe

S type - Kitagawa Europe

S type - Kitagawa Europe

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DATE 18 DEC 2008 № MA0534RKY P34The resolution / an assembling work procedureFor S <strong>type</strong> cylinderMANAGER CHIEF WRITE BY高 橋 優Fig. 8The assembly work procedure is shown here.8 ) The position H of guide-pin Q 2 pieces is matchedand the piston is built into the rotary-valve E .(Fig. 7)9 ) O-ring 04 is built into the cylinder D . The piston Hand rotary valve E are inserted in the cylinder D , itmatches, the position with the plug S in outer of O-ring04 and rotary valve E is built, and it tightens with thesocket head cap screw 03 lightly.(Please be suitable and confirm it by the mark.)(Fig. 6and 9)10 ) Under such a condition, please install it in the spindleonce. And, please do the wick match so that run-out ofthe cylinder D and rotary valve E may become smallas much as possible. Afterwards, please tighten with thesocket head cap screw 03 .(run-out must aim at 0.01TIR or less.)(Fig. 10)Fig. 9Fig. 10KITAGAWA IRON WORKS CO., LTD.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!