Section 2Trench Excavation <strong>and</strong> Backfill2.1 Types of Allowed Backfill2.2 Materialsa. Class A backfill – compacted native material1. Class A backfill requires <strong>District</strong> approval <strong>and</strong> shall only be considered for use inunpaved areas.b. Class B backfill – compacted crushed rock granular material1. Class B backfill shall be used in all paved areas.c. Refer to St<strong>and</strong>ard Detail 10.a. Class A Backfill – compacted native material1. The <strong>District</strong> may require a geotechnical engineering investigation of the suitabilityof native materials for use in trench backfill.2. Class A backfill material shall be free of organic material, wood, rocks larger than6 inches in any dimension, <strong>and</strong> other debris.3. The moisture content of Class A backfill material shall be no more than 5% aboveoptimum during backfill placement <strong>and</strong> compaction.b. Class B Backfill – compacted crushed rock granular material1. Class B backfill material shall be crushed rock meeting the requirements of ODOTSt<strong>and</strong>ard Specifications Section 00641 <strong>and</strong> Section 02630.2. <strong>Design</strong>ated sizes shall be 1”-0” or ¾”-0” with no more than 5% passing theNo. 200 sieve (wet analysis).c. Bedding <strong>and</strong> Pipe Zone Material1. Bedding <strong>and</strong> pipe zone material shall be Class B backfill material.d. Foundation Stabilization Material1. Foundation stabilization material shall be 2 1/2"-0” crushed rock meeting therequirements of ODOT St<strong>and</strong>ard Specifications Section 00641 <strong>and</strong> Section 02630,or other material as approved by the Inspector.TVWD <strong>Water</strong> System St<strong>and</strong>ards June 2012 Page 2-1
Trench Excavation <strong>and</strong> Backfill Section 22.3 Pavement, Curb, <strong>and</strong> Sidewalk Removala. Prior to excavation of the trenches, cut all pavements, curbs, <strong>and</strong> sidewalks,regardless of the thickness, with a pavement saw or other approved pavementcutter.b. The width of the pavement cut shall be at least equal to the required width of thetrench at ground surface. The city, county, or state agency responsible for thestreet may require T-cutting or additional pavement milling prior to re-surfacing.c. Removed pavement <strong>and</strong> concrete materials shall be hauled from the site to berecycled <strong>and</strong> not used for trench backfill.2.4 Trench Width, Base, <strong>and</strong> Gradea. The width of trenches in which pipe is to be laid shall be 12 inches greater thanthe nominal diameter of the pipe or 24 inches minimum, unless otherwiseapproved by the <strong>District</strong> Engineer.b. Grade the full width of the bottom of the trench where the pipe is to be laid;additional excavation to accommodate pipe bells shall be required. The trenchbottom shall be level across the width <strong>and</strong> on a uniform grade between gradebreaks along the length of the trench.2.5 Shoring, Sheeting, <strong>and</strong> Bracing of Trenchesa. Trench safety, including but not limited to shoring <strong>and</strong> bracing design, shall bethe responsibility of the contractor.b. Erect, maintain, <strong>and</strong> remove shoring, sheeting <strong>and</strong> bracing as required by themost stringent of all applicable laws, codes, <strong>and</strong> ordinances.c. Where sheeting <strong>and</strong> bracing are used, increase trench widths accordingly by thethickness of the sheeting. Keep sheeting in place until the pipe has been placed<strong>and</strong> backfilled at the pipe zone.d. Shoring <strong>and</strong> sheeting shall be removed as backfilling progresses in a mannerthat will not damage the pipe or permit voids in the backfill.e. Foundation Stabilization1. When the existing material in the bottom of the trench is unsuitable for supportingthe pipe, excavate below the flow line of the pipe. If firm, native material is notpresent within three feet below the bottom of the pipe zone, contact the Inspectorfor further guidance on foundation stabilization.2. Backfill the trench to the bottom of the pipe zone with approved material <strong>and</strong>compact.2.6 Location of Excavated Materialsa. During trench excavation, place the excavated material within the constructioneasement or specified working area so that the excavated material does notobstruct any private or publicly traveled roadways.TVWD <strong>Water</strong> System St<strong>and</strong>ards June 2012 Page 2-2