Precast Concrete Vaults Section 7g. Vault Joints1. Preformed plastic gaskets for horizontal vault joints shall meet requirements ofFederal Specification SS-S-00210.2. Gaskets shall be:i. Kent Seal No. 2 manufactured by Hamilton Kent Manufacturing Companyof Kent, OHii. Ram-Nek by K.T. Snyder Company, Inc. of Houston, TXiii. Approved equalh. Grout <strong>and</strong> Dampproof Coatings1. Damp-proof the exterior below-grade walls <strong>and</strong> base with a water-based blend thatreacts with the free lime <strong>and</strong> calcium hydroxides in the concrete to seal the vault.An asphalt compound of brush or spray consistency conforming to FederalSpecification ASTM D449 may be used with the <strong>District</strong> Engineer's approval.2. Vaults damp-proofed using clear compounds shall be marked in black paint ashaving received such a coating. The markings shall indicate the type of materialused.7.3 Vault Installationa. Excavation, base rock, <strong>and</strong> backfill shall conform to Sections 2.1 <strong>and</strong> 2.8. Ifmaterial in bottom of excavation is unsuitable for supporting unit, excavate <strong>and</strong>backfill to required grade with foundation stabilization as specified in Section2.1.6b. Place precast vaults in conformance with St<strong>and</strong>ard Details 300, 310, <strong>and</strong> 811.c. Install preformed plastic gaskets for vault sections in accordance withmanufacturer's instructions <strong>and</strong> the following:1. Carefully inspect precast vault sections to be joined. Do not use sections with chipsor cracks in the tongue.2. Install gasket material in accordance with manufacturer's instructions. Use onlyprimer furnished by gasket manufacturer.3. Completed vaults shall be rigid <strong>and</strong> watertight.4. Top of vault lid shall be six inches above adjacent finished l<strong>and</strong>scape grade.d. Pipe Penetrations1. Openings in vault walls shall be no larger than two inches greater than flangediameter of pipe being installed.2. Openings in knockout shall be made using a core drill or a series of smallerdiameter drill holes along the circumference of the opening with centers no morethan two inches in diameter.3. Prior to backfilling around vaults, use non-shrink grout to seal all joints <strong>and</strong> wallpenetrations, <strong>and</strong> patch wall areas with rock pockets.TVWD <strong>Water</strong> System St<strong>and</strong>ards June 2012 Page 7-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!