11.07.2015 Views

Design and Construction Standards - Tualatin Valley Water District

Design and Construction Standards - Tualatin Valley Water District

Design and Construction Standards - Tualatin Valley Water District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Water</strong> Service Connections Section 66.3 <strong>Construction</strong>a. Installation of Service Connections1. Trench excavation <strong>and</strong> backfill shall conform to Chapter 2. Cover over pipe shall beas indicated on St<strong>and</strong>ard Detail 10.2. Service Saddlesi. Thoroughly clean the pipe surface <strong>and</strong> apply a suitable gasket lubricant perthe manufacturer’s instructions.ii. Position the saddle body over the pipe, install the straps, install the nuts tofinger tight, <strong>and</strong> check to ensure that the gasket is seated flat onto the pipeface.Iii. Tighten the nuts evenly in 20 pound increments to the manufacturer’srecommended torque specifications.3. Copper Tubing Installationi. Copper tubing shall be cut with square ends, reamed, cleaned, <strong>and</strong> madeup tightly.ii. Install copper tubing in full length segment without joints where possible.Where joints are required, use approved compression fittings.iii. Care shall be taken to prevent the tube from kinking or buckling on shortradius bends. Kinked or buckled sections of copper tube shall be cut <strong>and</strong>the tube spliced with the proper brass fittings at the Contractor's expense.4. Meter Box Installationi. Meters <strong>and</strong> meter boxes shall be installed as shown in St<strong>and</strong>ard Details 7,7D, 7P, 7PD, <strong>and</strong> 9 or as directed.ii. Finish grade of completed meter enclosure shall allow a minimum of oneinch <strong>and</strong> a maximum of four inches clearance from the top of the meter tothe meter box.iii. Meter boxes shall be set or constructed plumb, with the top set horizontally.Grade adjustments of the meter boxes shall be by using st<strong>and</strong>ard extensionsections for the box specified.iv. Lightly compacted earth backfill shall be placed inside of the meter boxesto depth indicated. Backfill around meter boxes as specified for adjoiningpipe. Provide adequate space to allow for sidewalk installation.5. Meter Installationi. Installation of meters will be withheld until the <strong>District</strong> has accepted theproject.ii. Prior to connection of the meter, the angle valve shall be opened <strong>and</strong> theservice line flushed of all foreign materials.iii. Depending on the elevation difference between the meter <strong>and</strong> theproposed building to be served, the <strong>District</strong> may require a gate valve orbackflow prevention device on the customer side of the meter at the meterbox.TVWD <strong>Water</strong> System St<strong>and</strong>ards June 2012 Page 6-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!