11.07.2015 Views

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(F)(G)Educati<strong>on</strong> facilitiesWhe<str<strong>on</strong>g>the</str<strong>on</strong>g>r provided for in <str<strong>on</strong>g>the</str<strong>on</strong>g> project, if not,<str<strong>on</strong>g>the</str<strong>on</strong>g>n details <str<strong>on</strong>g>of</str<strong>on</strong>g> availability <str<strong>on</strong>g>of</str<strong>on</strong>g> such facilities in<str<strong>on</strong>g>the</str<strong>on</strong>g> vicinity, with <str<strong>on</strong>g>the</str<strong>on</strong>g>ir capacities, existingenrolment <str<strong>on</strong>g>of</str<strong>on</strong>g> students, vacancy availabilityetc may be provided.Social Security programmes proposed foraffordable housing beneficiaries: YesAs indicated, <str<strong>on</strong>g>the</str<strong>on</strong>g>re is Government college, PGcollege, higher Sec<strong>on</strong>dary School, EngineeringCollege in <str<strong>on</strong>g>the</str<strong>on</strong>g> nearby vicinity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area.: Yes33. O<str<strong>on</strong>g>the</str<strong>on</strong>g>r infrastructure facilities(A)Roads(i)(ii)(iii)Proposedexpenditure (Rs inlacs)Length <str<strong>on</strong>g>of</str<strong>on</strong>g> roads anddesign parameters inbriefWhe<str<strong>on</strong>g>the</str<strong>on</strong>g>r c<strong>on</strong>nectivitywith <str<strong>on</strong>g>the</str<strong>on</strong>g> mainperipheral road existsor not? If not, is itproposed in <str<strong>on</strong>g>the</str<strong>on</strong>g> DPR?: 7.95: Bitumen top12 mt wide road ( 245 mt x 5.5 mt (carriage way))9 mt wide road ( 46.85 mt x 3.5 mt (carriage way))3 mt wide road( <strong>11</strong>2.18 mt x 3.00 mt (carriage way)): As indicated, <str<strong>on</strong>g>the</str<strong>on</strong>g> project site is situated adjacent tohighway having 200’ ROW <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong> to c<strong>on</strong>nectit with SH as well as internal road network has beentaken as per <str<strong>on</strong>g>the</str<strong>on</strong>g> layout plan.(B)Drainage & Rainwater harvesting Structure(i)(ii)Proposedexpenditure (Rs inlacs)Length <str<strong>on</strong>g>of</str<strong>on</strong>g> drains anddesign parameters inbrief: Rs. 6.39 Lacs: Average 300mmx600mm with ferro cement draincovers(iii)Whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r c<strong>on</strong>nectivitywith <str<strong>on</strong>g>the</str<strong>on</strong>g>main/primary drainsexists or not? If not,is it proposed in <str<strong>on</strong>g>the</str<strong>on</strong>g>: As indicated storm water drain is proposed torecharge <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>under</str<strong>on</strong>g>ground water through rainwaterharvesting structures<strong>11</strong> | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!