11.07.2015 Views

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(xiii)(xiv)(xv)Length <str<strong>on</strong>g>of</str<strong>on</strong>g>pipelineand designparametersin briefIntegrati<strong>on</strong>with citylevelinfrastructureWhe<str<strong>on</strong>g>the</str<strong>on</strong>g>r<str<strong>on</strong>g>the</str<strong>on</strong>g>re isprovisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>rain waterharvesting?: DI-K-09 Pipes80 mm dia. = 1309.44 rmt.100 mm dia. = 126.72 rmt.150 mm dia. = 8.45 rmt.RCC ESR = 170000 Liter: Stand al<strong>on</strong>e system, municipal watersupply does not exist in <str<strong>on</strong>g>the</str<strong>on</strong>g> project areasite. The <str<strong>on</strong>g>under</str<strong>on</strong>g>ground water throughtube well has been proposed to meet out<str<strong>on</strong>g>the</str<strong>on</strong>g> project requirement.: Yes(C)Sanitati<strong>on</strong>(xi)(xii)(xiii)Proposedexpenditure(Rs in lacs)Whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r<str<strong>on</strong>g>under</str<strong>on</strong>g>ground systemproposedLength <str<strong>on</strong>g>of</str<strong>on</strong>g>pipelineand designparametersin brief: Rs.14.32(Sewerage)+ Rs59.89(STP): Yes: RCC NP 04150 mm dia. = 965.25 rmt.200 mm dia. = 9.75 rmt.Main Hole = 65 nos.U-PVC Pipes <strong>11</strong>0 mm dia. = 1040 rmt.STP = 500 KLD47 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!