11.07.2015 Views

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(E)Health facilities:YesWhe<str<strong>on</strong>g>the</str<strong>on</strong>g>r provided for in <str<strong>on</strong>g>the</str<strong>on</strong>g> project, if not,<str<strong>on</strong>g>the</str<strong>on</strong>g>n details <str<strong>on</strong>g>of</str<strong>on</strong>g> availability <str<strong>on</strong>g>of</str<strong>on</strong>g> such facilities in<str<strong>on</strong>g>the</str<strong>on</strong>g> vicinity, with <str<strong>on</strong>g>the</str<strong>on</strong>g>ir capacity etc may beprovided.As indicated, provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Health Care facilitythrough ‘PHC’ in livelihood centre includingmaternity care facility has been taken.(F)(G)Educati<strong>on</strong> facilitiesWhe<str<strong>on</strong>g>the</str<strong>on</strong>g>r provided for in <str<strong>on</strong>g>the</str<strong>on</strong>g> project, if not,<str<strong>on</strong>g>the</str<strong>on</strong>g>n details <str<strong>on</strong>g>of</str<strong>on</strong>g> availability <str<strong>on</strong>g>of</str<strong>on</strong>g> such facilities in<str<strong>on</strong>g>the</str<strong>on</strong>g> vicinity, with <str<strong>on</strong>g>the</str<strong>on</strong>g>ir capacities, existingenrolment <str<strong>on</strong>g>of</str<strong>on</strong>g> students, vacancy availabilityetc may be provided.Social Security programmes proposed foraffordable housing beneficiaries: YesAs indicated, <str<strong>on</strong>g>the</str<strong>on</strong>g>re is Government college, PGcollege, higher Sec<strong>on</strong>dary School, EngineeringCollege in <str<strong>on</strong>g>the</str<strong>on</strong>g> nearby vicinity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> area.: Yes33. O<str<strong>on</strong>g>the</str<strong>on</strong>g>r infrastructure facilities(A)Roads(xi)(xii)(xiii)Proposedexpenditure (Rs inlacs)Length <str<strong>on</strong>g>of</str<strong>on</strong>g> roads anddesign parameters inbriefWhe<str<strong>on</strong>g>the</str<strong>on</strong>g>r c<strong>on</strong>nectivitywith <str<strong>on</strong>g>the</str<strong>on</strong>g> mainperipheral road existsor not? If not, is itproposed in <str<strong>on</strong>g>the</str<strong>on</strong>g> DPR?: 13.29: Bitumen top Carriage way = 2430.484 sqm.3.00 m. Wide Road = 753.26 rmt.3.60 m wide Road = 124.86 rmt.6.0 m. Wide Road = 124.86 rmt.: As indicated, <str<strong>on</strong>g>the</str<strong>on</strong>g> project site is situated adjacentto highway having 200’ ROW <str<strong>on</strong>g>the</str<strong>on</strong>g> provisi<strong>on</strong> toc<strong>on</strong>nect it with SH as well as internal roadnetwork has been taken as per <str<strong>on</strong>g>the</str<strong>on</strong>g> layout plan.(B)Drainage(x)(xi)Proposedexpenditure (Rs inlacs)Length <str<strong>on</strong>g>of</str<strong>on</strong>g> drains anddesign parameters in: 15.07: Rain water Drain 300mm X 200mm secti<strong>on</strong> =1437.84 rmt.67 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!