11.07.2015 Views

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

700mm l<strong>on</strong>g.(vi)Whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r c<strong>on</strong>nectivitywith <str<strong>on</strong>g>the</str<strong>on</strong>g>main/primary drainsexists or not? If not,is it proposed in <str<strong>on</strong>g>the</str<strong>on</strong>g>DPR.: As indicated storm water drain is proposed torecharge <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>under</str<strong>on</strong>g>ground water throughrainwater harvesting structures(C)External Electrificati<strong>on</strong>(iii)Proposed expenditure(Rs in lacs): Rs. 122.64lacs(iv)Indicate nos. <str<strong>on</strong>g>of</str<strong>on</strong>g> poles,transformers etc.: LT Cable=5900 rmt. Transformers 250 KVA=12nos.125 KVA=01 nos. <strong>11</strong>8 nos. Street Light Poles(D)Community facilities(iii)Proposed expenditure(Rs in lacs): Community centre -40.77 Lacs (1364.5 sqft)(iv)Type, area,specificati<strong>on</strong> etc: No details & drawings(E)Parks & open spaces(iii)Proposed expenditure(Rs in lacs): Rs. <strong>11</strong>.57 Lacs(iv) 1No. & area <str<strong>on</strong>g>of</str<strong>on</strong>g> parks : One number park with about 750 m. L<strong>on</strong>g parkwall with parking are has been proposed forplaying <str<strong>on</strong>g>of</str<strong>on</strong>g> children and also be used as oxygenz<strong>on</strong>e for <str<strong>on</strong>g>the</str<strong>on</strong>g> complete project site.(F)Solid Waste Management(iv)(v)Proposed expenditure(Rs in lacs)Details <str<strong>on</strong>g>of</str<strong>on</strong>g> Solid WasteManagement fromcollecti<strong>on</strong> to ultimate: Nil: Through C<strong>on</strong>tract systemIt will be maintained by <str<strong>on</strong>g>the</str<strong>on</strong>g> society through as30 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!