11.07.2015 Views

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

Minutes of the 1st CSMC Meeting under RAY held on 21-11-2011

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(xii)briefWhe<str<strong>on</strong>g>the</str<strong>on</strong>g>r c<strong>on</strong>nectivitywith <str<strong>on</strong>g>the</str<strong>on</strong>g>main/primary drainsexists or not? If not,is it proposed in <str<strong>on</strong>g>the</str<strong>on</strong>g>DPR.: As indicated storm water drain is proposed torecharge <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>under</str<strong>on</strong>g>ground water throughrainwater harvesting structures(C)External Electrificati<strong>on</strong>(vii)Proposed expenditure(Rs in lacs): 82.66(viii) Indicate nos. <str<strong>on</strong>g>of</str<strong>on</strong>g> poles,transformers etc.: Poles -20 nos.Transformers (315KVA)- 01No.Transformers (400KVA)- 01NoTransformers (500KVA)-01NoFeeder Pillar = 32 nos.Hume Pipe 200 mm dia. = 512.00 rmt.(D)Community facilities(vii)Proposed expenditure(Rs in lacs):(viii) Type, area,specificati<strong>on</strong> etc:(E)Parks & open spaces(vii)Proposed expenditure(Rs in lacs): 9.78a. 420.06 sqm.b. 225.38 sqm.(viii) 2No. & area <str<strong>on</strong>g>of</str<strong>on</strong>g> parks: Two numbers large parks proposed ascommunity amenities, for playing <str<strong>on</strong>g>of</str<strong>on</strong>g> childrenand shall also be set as an oxygen z<strong>on</strong>e for <str<strong>on</strong>g>the</str<strong>on</strong>g>complete project site.(F)Solid Waste Management(xi) Proposed expenditure : Nil68 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!