11.07.2015 Views

Aerial Ropeways - Environmental Clearance

Aerial Ropeways - Environmental Clearance

Aerial Ropeways - Environmental Clearance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 6: <strong>Environmental</strong> Monitoring ProgramThis chapter should cover the planned environmental monitoring program. It should also includethe technical aspects of monitoring the effectiveness of mitigation measures.Chapter 7: Additional StudiesThis chapter should cover the details of the additional studies required in addition to thosespecified in the ToR and which are necessary to cater to more specific issues applicable to theparticular project.Chapter 8: Project BenefitsThis chapter should cover the benefits accruing to the locality, neighbourhood, region and nationas a whole. It should bring out details of benefits by way of improvements in the physicalinfrastructure, social infrastructure, employment potential and other tangible benefits.Chapter 9: <strong>Environmental</strong> Cost Benefit AnalysisThis chapter should cover on <strong>Environmental</strong> Cost Benefit Analysis of the project.Chapter 10: <strong>Environmental</strong> Management PlanThis chapter should comprehensively present the <strong>Environmental</strong> Management Plan (EMP), whichincludes the administrative and technical setup, summary matrix of EMP, the cost involved toimplement the EMP, both during the construction and operational phase and provisions madetowards the same in the cost estimates of project construction and operation. This chapter shouldalso describe the proposed post-monitoring scheme as well as inter-organizational arrangementsfor effective implementation of the mitigation measures.Chapter 11: Summary and ConclusionsThis chapter gives the summary of the full EIA report condensed to ten A-4 size pages at themaximum. It should provide the overall justification for implementation of the project and shouldexplain how the adverse effects have been mitigated.Chapter 12: Disclosure of ConsultantsThis chapter should include the names of the consultants engaged with their brief resume andnature of consultancy rendered.This manual is meant to provide general guidance for preparation of EIA report. The contents ofthe manual are to be considered as version 1.0 (2010). An updation / revision of the manual willbe taken up as per the requirements. In case of interpretation of any question related to law, theprovisions of the original law and the Rules made thereunder with various Governmentdirections/resolutions will have to be read and followed. In case of amendment to the originalAct/Rules /Notifications made thereunder, the provisions as amended from time to time shallbe applicable.Administrative Staff College of India, Hyderabadxv

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!