11.07.2015 Views

Aerial Ropeways - Environmental Clearance

Aerial Ropeways - Environmental Clearance

Aerial Ropeways - Environmental Clearance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA Guidance Manual– <strong>Aerial</strong> <strong>Ropeways</strong>Employment potential - skilled; semi-skilled and unskilled labour both duringconstruction and operational phases of the project with specific attention toemployment potential of the local population as well as necessity for imparting anyspecialized skills to them to be eligible for such employment in the project on a longterm basis i.e., during operational and maintenance stages of the project andOther tangible benefits like improved standards of living, health, education etc.9.0 <strong>Environmental</strong> Cost Benefit AnalysisIf recommended by the State Expert Appraisal Committee, this chapter should include theenvironmental cost benefit analysis of the project.10.0 <strong>Environmental</strong> Management Plan (EMP)Summary of potential impact & recommended mitigation measuresAllocation of resources and responsibilities for plan implementationAdministrative and technical setup for management of environmentInstitutional arrangements proposed with other organizations/Govt. authorities foreffective implementation of environmental measures proposed in the EIASafe guards/mechanism to continue the assumptions / filed conditions made in theEIA <strong>Environmental</strong> specifications for contractors should cover the required safeguardsduring the design and construction stage11.0 Summary and Conclusion (Summary EIA)It should be a summary of the full EIA report condensed to 10 A-4 size pages at the maximum. Itshould necessarily cover in brief the following chapters of the full EIA report: -Introduction/ Project description /Analysis of alternative / Description of the environment /Anticipated environmental impact and mitigation measures / <strong>Environmental</strong> monitoring program/Additional studies / Project benefits / <strong>Environmental</strong> cost benefit analysis / <strong>Environmental</strong>management plan / Summary and conclusion / Disclosure of the consultant engaged12.0 Disclosure of Consultants EngagedThis chapter should include the names of the consultants engaged with their brief resume andnature of consultancy rendered.62Administrative Staff College of India, Hyderabad

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!