11.07.2015 Views

Aerial Ropeways - Environmental Clearance

Aerial Ropeways - Environmental Clearance

Aerial Ropeways - Environmental Clearance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Environmental</strong> Monitoring Programd) The outer wires are becoming loose and displaced for any reason;e) The rope has become kinked, distorted or damaged and the damaged piece cannot beremoved; andf) Examination of the rope leaves any doubt as to its safety for any reason whatsoever.Carrier testing is to be performed to confirm design calculations. Carrier tests will simulate as aminimum the maximum design for carrier loads including restraining bars, foot rests, bubbles,etc. Carrier tests will help verify the carriers' ability to support a vertical load during the testingby arranging loads to simulate individual passenger positions. The details of the methods oftesting are given in Annexure 10.In designing trestles the following loads need to be considered:a. The weight of the trestle and the whole pressure exerted by the ropesb. The whole of the stresses due to friction which occurs during the motion of the carryinghauling rope. These stresses can be determined with a sufficient margin of safety as2.5% of the load on the rollersc. Weight of vehicles traveling with maximum load andd. Load due to wind77.5Natural Resource ConservationWater conservation measures should be addressed.Reforestation / Re-plantation measures to be undertakenTop soil conservation measures to be addressed7.6 R&R Action PlanDetailed R&R plan with data on the existing socio-economic status of the population in the studyarea and broad plan for the resettlement of the displaced population, site for the resettlementcolony, alternative livelihood concerns/employment and rehabilitation of the displaced people,civil and housing amenities being offered, etc. and the schedule of the implementation of theproject specific R&R Plan. Details of provisions (capital & recurring) for the project specific R&RPlanSpecific studies requirement depending on the site and activity proposed should be discussed.National Policy on Resettlement and Rehabilitation for project affected families-2003 (publishedin the gazette of India, extraordinary part-i, section 1, no- 46, dated 17th February, 2004)gives thedetails of the national R&R policy.Administrative Staff College of India, Hyderabad29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!