11.07.2015 Views

elevator shaft mounting instructions - mod. “laquila” - Donzelli Srl

elevator shaft mounting instructions - mod. “laquila” - Donzelli Srl

elevator shaft mounting instructions - mod. “laquila” - Donzelli Srl

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ELEVATOR SHAFT MOUNTING INSTRUCTIONS - MOD. “LAQUILA”Rel. 03 February 2011ENCLOSURE PANELS SEALINGRUBBER PROFILE• In order to guarantee better seal, the <strong>Donzelli</strong>LAQUILA steel <strong>shaft</strong> is supplied with a selfadhesiverubber sealing profile. This sealeliminates the need for silicon the panels.• After carefully cleaning the edges of theprofiles shown with the arrows, remove theprotective film and position the seal on theframe as shown on the figure. The adhesiveallows the seal to remain in place evenwithout the panel.• Press on edge shown by the arrows againstthe frame to guarantee that the adhesivebonds.• Make a 45° cut in the seal at the corners asshown on Picture “B”. This joint must be madecorrectly in order to guarantee proper sealingof the panel.• IMPORTANT: The seal is supplied in rolls ofmax. 100 m. The amount provided iscalculated based on the specific needs ofeach structure. It is important that you performany cuts with a minimum waste.1Fig. “A”• IMPORTANT: DO NOT STRETCH THERUBBER GASKET DURING THEMOUNTINGPART LIST1 SELF-ADHESIVE SEALFig. “B”ABINNER FLUSH SURFACE VERSIONOUTER FLUSH SURFACE VERSIONAB<strong>Donzelli</strong> S.r.l. Via Bizzozzero, 106 – 20032 Cormano (MI) Tel. +39 02 66301849 Fax +39 02 6152041 info@donzellisrl.com PAGE 14 / 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!