11.07.2015 Views

Middle Chattahoochee Middle Chattahoochee

Middle Chattahoochee Middle Chattahoochee

Middle Chattahoochee Middle Chattahoochee

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Comparison of Available WaterResource Capacities and Future NeedsFigure 5-4 Assimilative Capacity Results from Dissolved Oxygen Assessment: Flint &Tallapoosa Rivers (2050)Available Assimilitaive Capacity (Total Mileage)None orModel Run Basin Very Good Good Moderate Limited ExceededBaseline Flint 551.22 304.59 74.09 21.68 8.802050 Flint 515.75 254.97 129.43 49.32 10.92Source: EPD, October 2010Available Assimilitaive Capacity (Total Mileage)None orModel Run Basin Very Good Good Moderate Limited ExceededBaseline Tallapoosa 46.45 1.25 0.00 0.00 0.002050 Tallapoosa 28.40 17.21 2.09 0.00 0.00MIDDLE CHATTAHOOCHEE5-8Georgia State-wide Water Management Plan05.02.2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!