11.07.2015 Views

Third Benchmarking Report on Quality of Electricity Supply

Third Benchmarking Report on Quality of Electricity Supply

Third Benchmarking Report on Quality of Electricity Supply

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.6 Background Informati<strong>on</strong> <strong>on</strong> C<strong>on</strong>tinuity Indicators····Where possible countries should seek to measure c<strong>on</strong>tinuity indicators, especially unplannedSAIDI and unplanned SAIFI.Weighting by user is the most comm<strong>on</strong> method for calculating c<strong>on</strong>tinuity indicators. Thereforecountries planning to introduce c<strong>on</strong>tinuity indicators are recommended to adopt this method.Comparative analysis is facilitated where countries use the same method for calculating c<strong>on</strong>tinuityindicators at all voltages.Excepti<strong>on</strong>al events can significantly affect annual performance figures and countries shouldattempt to provide <strong>on</strong>e set <strong>of</strong> figures including all interrupti<strong>on</strong>s and <strong>on</strong>e set excluding suchatypical events.As far as the distributi<strong>on</strong> network is c<strong>on</strong>cerned, c<strong>on</strong>tinuity indicators <strong>on</strong> durati<strong>on</strong> and frequency <strong>of</strong>unplanned interrupti<strong>on</strong>s are available from the majority <strong>of</strong> the surveyed countries. The level <strong>of</strong> c<strong>on</strong>fidencein these indicators reflect the c<strong>on</strong>fidence <strong>on</strong> the data measured, as explained in Subsecti<strong>on</strong> 1.Indicators are more comm<strong>on</strong>ly weighted <strong>on</strong> the number <strong>of</strong> customers served (SAIDI, SAIFI for l<strong>on</strong>ginterrupti<strong>on</strong>s and MAIFI for short interrupti<strong>on</strong>s), but they can be weighted also <strong>on</strong> the c<strong>on</strong>tractedpower (in Portugal both methods are adopted). Table 1.2 summarises the situati<strong>on</strong>, noting thedifferences in voltage levels that are m<strong>on</strong>itored.TABLE 1.2CONTINUITY INDICATORS FOR DISTRIBUTION:unplanned interrupti<strong>on</strong>sSAIDI, SAIFI and MAIFI per voltage level(H, M, L)SAIDI and SAIFI per voltage level (H, M, L)SAIDI and SAIFI per voltage level (H, M)SAIDI and SAIFI all voltagesAverage durati<strong>on</strong> (D) and frequency (F) perc<strong>on</strong>tracted power or otherOther/No indicatorsGB, HU, IT, NO (from 2006)CZ, GR, PT, FR, LT, NO (from 2006)SI (some data <strong>on</strong>ly), BE_Wall<strong>on</strong>iaSE, EE, IE (SAIFI from 2006)AT (average D and F weighted <strong>on</strong> MV power affected,MV/MV, MV/LV),ES (average D and F weighted <strong>on</strong> MV power affected:TIEPI, NIEPI)FI (Average D and F weighted <strong>on</strong> yearly energyc<strong>on</strong>sumpti<strong>on</strong>)FI (Interrupti<strong>on</strong>s are weighted by the yearly energyc<strong>on</strong>sumpti<strong>on</strong> <strong>of</strong> the distributi<strong>on</strong> area that <strong>on</strong>edistributi<strong>on</strong> transformer feeds).PT (TIEPI, ENS, excluding LV)NO (ENS, excluding LV: _ 1kV)LV (number <strong>of</strong> interrupti<strong>on</strong>s), PL (no indicators)9<str<strong>on</strong>g>Third</str<strong>on</strong>g> <str<strong>on</strong>g>Benchmarking</str<strong>on</strong>g> <str<strong>on</strong>g>Report</str<strong>on</strong>g> <strong>on</strong> <strong>Quality</strong> <strong>of</strong> <strong>Electricity</strong> <strong>Supply</strong> – 2005 · Chapter 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!