SPRAYING BOOM ECO BDM - Bargam UK
SPRAYING BOOM ECO BDM - Bargam UK
SPRAYING BOOM ECO BDM - Bargam UK
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4HANDLINGAND LOADINGDisplace the boom structure 20 mm to the right, with respectto the tank unit uprights and position it as shown in fig. 3;tighten the U bolts A nuts.XX+20 mm.AIDM - 05.006 Ec. 034.3.2 Water system - Installation– Should the filters be supplied, fit them aligned as shown in fig. 4, making sure thearrow on the filter case is turned downwards.EXPORT SPECIAL 6-8-10-12 mEXPORT SPECIAL 14-15-16-18 mIDM - 05.017 Ec.04368.005 (F) Ec. 0- 8 -