12.07.2015 Views

Guidelines for Calculation and Provision of Open Space in ...

Guidelines for Calculation and Provision of Open Space in ...

Guidelines for Calculation and Provision of Open Space in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the exist<strong>in</strong>g development; e.g. exist<strong>in</strong>g l<strong>and</strong>scaped areas adjacent to exist<strong>in</strong>g build<strong>in</strong>gs orpark<strong>in</strong>g may be excluded from the “greenfield,” or development area.Where l<strong>and</strong> is be<strong>in</strong>g subdivided <strong>for</strong> the purpose <strong>of</strong> residential lot development, theDeveloped Area <strong>in</strong>cludes the total upl<strong>and</strong> area <strong>of</strong> the lots, road layouts, stormwatersystems, etc. (exclusive <strong>of</strong> the open space lot as may be provided to meet therequirement). Where l<strong>and</strong> is be<strong>in</strong>g subdivided solely <strong>for</strong> the purpose <strong>of</strong> <strong>in</strong>dustrial orcommercial lot development, the Developed Area <strong>in</strong>cludes the total upl<strong>and</strong> area <strong>of</strong> theselots, road layouts, stormwater systems, etc., (aga<strong>in</strong>, exclusive <strong>of</strong> an open space lot).As an example, a large commercial build<strong>in</strong>g proposed on a ten acre parcel <strong>in</strong> a SignificantNatural Resource Area, which results <strong>in</strong> grad<strong>in</strong>g <strong>and</strong>/or clear<strong>in</strong>g <strong>of</strong> five (5) acres <strong>for</strong> thebuild<strong>in</strong>g, site drive, park<strong>in</strong>g, stormwater <strong>and</strong> septic facilities, l<strong>and</strong>scaped areas, etc.,should calculate the 1:2 development to open space requirement as 5 acres x 2 = 10 acresopen space.Redevelopment RequirementsUnder the 2009 RPP, redevelopment <strong>of</strong> exist<strong>in</strong>g developed properties does not require theprovision <strong>of</strong> open space. A redevelopment project’s expansion <strong>in</strong>to “greenfield,” orundisturbed sites is further encouraged <strong>in</strong> Economic Centers; open space is required onlyafter the greenfield expansion portion <strong>of</strong> a redevelopment project exceeds 50% <strong>of</strong> theexist<strong>in</strong>g developed area on a site (MPS OS1.3). For example, an exist<strong>in</strong>g developmentwith a development area <strong>of</strong> 1 acre may exp<strong>and</strong> to a total development area <strong>of</strong> 1.5 acreswith no open space required <strong>in</strong> Economic Centers. Outside <strong>of</strong> Economic Centers,greenfield development associated with a redevelopment project is expected to meet thesame open space requirements as any other greenfield, or new development.Previously Permitted DRIsIf a project, previously permitted through the DRI process <strong>and</strong> required to provide openspace, returns <strong>for</strong> additional DRI review (expansion or redevelopment), only the area <strong>of</strong>the expansion or new disturbance should be used to calculate any additional open spacerequirements. The Commission may allow <strong>for</strong> a credit <strong>for</strong> open space provided <strong>for</strong>projects permitted, constructed, <strong>and</strong> <strong>in</strong> compliance with the requirements <strong>of</strong> the 1996 RPP(65% <strong>of</strong> a project property <strong>for</strong> SNRA, <strong>and</strong> 50% <strong>of</strong> a property <strong>for</strong> projects outside <strong>of</strong>SNRA).<strong>Open</strong> <strong>Space</strong> Technical Bullet<strong>in</strong>, 94-001, as Amended 5/14/09 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!