12.07.2015 Views

No. Company Name Output Investment Cost (1000USD) Area (ha ...

No. Company Name Output Investment Cost (1000USD) Area (ha ...

No. Company Name Output Investment Cost (1000USD) Area (ha ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>No</strong>. <strong>Company</strong> <strong>Name</strong> Project Title<strong>Output</strong><strong>Investment</strong><strong>Cost</strong>(<strong>1000USD</strong>)<strong>Area</strong> (<strong>ha</strong>) Location Remark8 Nam Dinh Textile <strong>Company</strong> 63,917.902001-2002 31,669.60 at company <strong>Investment</strong> in 01 oil-fired boiler and01 water treatment set205.50 Procurement of 10,000 Indianspindles and laboratory equipment4,137.90 Procurement of sizing, warpingmachines, towel weaving line2,026.40 Procurement of 28 Belgian weavingmachines1,517.20 Procurement of 100 Europeanweaving machines6,586.00 Procurement of 100 Chinese broadwidthtowel sewing machines758.60 <strong>Investment</strong> in laboratory equipment 524.10 <strong>Investment</strong> in dyeing equipment 10,660.40 <strong>Investment</strong> in sewing section 1,354.70 <strong>Investment</strong> in waste water treatment 1,379.30 <strong>Investment</strong> in other sections 1,830.00 Upgrading power drive 689.52003-2005 32,248.30 at company <strong>Investment</strong> in 30,000 spindles 17,241.30 <strong>Investment</strong> in air-con system 689.60 <strong>Investment</strong> in knitting equipment 275.80 Upgrading dyeing section 2,768.80 Upgrading power drive 2,886.30 <strong>Investment</strong> in sewing section 1,403.80 <strong>Investment</strong> in waste water treatment 3,120.70 <strong>Investment</strong> in other sections 3,862.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!