Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1. Customer concerns<br />
2. Service bulletins – maintenance<br />
3. Suitability<br />
4. Availability – parts/tools/technical info<br />
5. Boot/binding compatibility<br />
6. Compatibility of under-binding options<br />
7. Defects:<br />
1. a) parts – cracked/corroded/missing<br />
1. b) boot contact area – worn/damaged<br />
1. c) boot contact area – contaminated<br />
1. d) screws – missing/protruding<br />
1. e) brake/rollers/AFD – malfunctioning<br />
1. f) positioning/alignment – incorrect<br />
8. Binding to boot adjustments<br />
9. INITIAL ASSESSMENT<br />
1. Customer concerns<br />
2. Service bulletins – tuning requirements<br />
3. Suitability<br />
4. Defects:<br />
1. a) delaminated<br />
1. b) edge pulled out<br />
1. c) cracked side wall<br />
1. d) warped, bent, twisted<br />
1. e) damaged tip/tail protector<br />
1. f) lost camber<br />
84 / CHECK IT OUT<br />
USED BINDING CHECKLIST<br />
1. Customer concerns<br />
2. Service bulletins – fitting requirements<br />
3. Suitability<br />
4. ISO sole dimensions – Adult/Child<br />
5. Sole hardness/material<br />
6. Defects:<br />
1. a) sole – warped<br />
1. b) contact area – damaged/worn<br />
1. c) contact area – contaminated<br />
1. d) shell/liner/buckle – damaged<br />
7. Type/position of foot bed/fitting aids<br />
8. INITIAL ASSESSMENT<br />
10. Tests:<br />
1. a) screw tightness<br />
1. b) antishock travel<br />
1. c) compatibility (if indicated)<br />
1. d) release indicator verification<br />
1. e) accelerated life cycle (with permission)<br />
11. FINAL ASSESSMENT<br />
USED SKI CHECKLIST<br />
5. INITIAL ASSESSMENT<br />
6. Base/edge condition/thickness<br />
7. Base/edge profile<br />
8. FINAL ASSESSMENT<br />
USED BOOT CHECKLIST<br />
Reprinted with the permission of Vermont Safety Research.<br />
For more information log on to check-itout.com<br />
9. Fit:<br />
1. a) foot anomalies<br />
1. b) foot/boot size comparison<br />
1. c) foot in boot evaluation<br />
10. Performance adjustments<br />
11. FINAL ASSESSMENT