Standard Specifications for Construction of Roads and Bridges on ...
Standard Specifications for Construction of Roads and Bridges on ...
Standard Specifications for Construction of Roads and Bridges on ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Secti<strong>on</strong> 618Make adjustments in the operati<strong>on</strong> to correct any c<strong>on</strong>diti<strong>on</strong> causing surface blemisheslarger than 1/2 inch. Do not use water <strong>on</strong> the completed barrier to correctimperfecti<strong>on</strong>s.(c) Precast. Precast barriers in secti<strong>on</strong> lengths. Prepare the barrier foundati<strong>on</strong> so itdoes not vary over 1/4 inch when a 10-foot straightedge is laid al<strong>on</strong>g the centerline <str<strong>on</strong>g>of</str<strong>on</strong>g>the barrier. Align the joints <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>nect adjacent secti<strong>on</strong>s.Use cast-in-place barrier where transiti<strong>on</strong>s, split barriers, or gaps shorter than 10 feetrequire it. At each joint between precast <str<strong>on</strong>g>and</str<strong>on</strong>g> cast-in-place barrier, provide hardwarein the cast-in-place secti<strong>on</strong> to tie its end to the abutting precast secti<strong>on</strong>.618.05 Precast C<strong>on</strong>crete Guardwall.(a) Fabricati<strong>on</strong>. A full-size sample <str<strong>on</strong>g>of</str<strong>on</strong>g> the guardwall will be provided at a specifiedlocati<strong>on</strong>. Fabricate the guardwall to match the sample's shape, color, <str<strong>on</strong>g>and</str<strong>on</strong>g> texture. Theguardwall shall also c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>m to the following:(1) Fabricate in a precast c<strong>on</strong>crete producti<strong>on</strong> facility certified by the Nati<strong>on</strong>alPrecast C<strong>on</strong>crete Associati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> according to the Associati<strong>on</strong>'s Manual <str<strong>on</strong>g>of</str<strong>on</strong>g>Quality C<strong>on</strong>trol.(2) Formulate the facing mixes, backing mixes, <str<strong>on</strong>g>and</str<strong>on</strong>g> structural c<strong>on</strong>crete backupto produce c<strong>on</strong>crete mix designs <str<strong>on</strong>g>of</str<strong>on</strong>g> similar aggregate-cement ratios to minimizedifferences in shrinkage factors <str<strong>on</strong>g>and</str<strong>on</strong>g> coefficients <str<strong>on</strong>g>of</str<strong>on</strong>g> thermal expansi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g>c<strong>on</strong>tracti<strong>on</strong>. Formulate using hydraulic cement, limest<strong>on</strong>e, quartz, mica, <str<strong>on</strong>g>and</str<strong>on</strong>g>silicious st<strong>on</strong>es in such proporti<strong>on</strong>s as to match the sample.(3) Use epoxy coated rein<str<strong>on</strong>g>for</str<strong>on</strong>g>cing steel at locati<strong>on</strong>s where the rein<str<strong>on</strong>g>for</str<strong>on</strong>g>cing steel isless than 2 inches from the exposed surface.(4) Cast the segments straight <str<strong>on</strong>g>and</str<strong>on</strong>g> true to a line in str<strong>on</strong>g permanent compositemolds <str<strong>on</strong>g>of</str<strong>on</strong>g> steel, plastic resins, c<strong>on</strong>crete, or rubber.(5) Cast the facing mixes a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 1 inch thick. Ensure a good b<strong>on</strong>dbetween facing <str<strong>on</strong>g>and</str<strong>on</strong>g> backup mixes.(6) Provide 4 lifting inserts in unexposed areas. Provide removable caps <str<strong>on</strong>g>for</str<strong>on</strong>g> thelifting inserts to allow <str<strong>on</strong>g>for</str<strong>on</strong>g> future segment replacement.(b) Test secti<strong>on</strong>. Dem<strong>on</strong>strate the ability to match the sample by fabricating a 10-foot, full-scale guardwall test secti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> delivering it to the locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the sample <str<strong>on</strong>g>for</str<strong>on</strong>g>comparis<strong>on</strong>. If the test secti<strong>on</strong> is not in reas<strong>on</strong>ably close c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity to the sample,fabricate another test secti<strong>on</strong> according to (a) above. Test secti<strong>on</strong>s that do not matchthe sample may not be used in the wall installati<strong>on</strong>.526