12.07.2015 Views

Standard Specifications for Construction of Roads and Bridges on ...

Standard Specifications for Construction of Roads and Bridges on ...

Standard Specifications for Construction of Roads and Bridges on ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Secti<strong>on</strong> 618Make adjustments in the operati<strong>on</strong> to correct any c<strong>on</strong>diti<strong>on</strong> causing surface blemisheslarger than 1/2 inch. Do not use water <strong>on</strong> the completed barrier to correctimperfecti<strong>on</strong>s.(c) Precast. Precast barriers in secti<strong>on</strong> lengths. Prepare the barrier foundati<strong>on</strong> so itdoes not vary over 1/4 inch when a 10-foot straightedge is laid al<strong>on</strong>g the centerline <str<strong>on</strong>g>of</str<strong>on</strong>g>the barrier. Align the joints <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>nect adjacent secti<strong>on</strong>s.Use cast-in-place barrier where transiti<strong>on</strong>s, split barriers, or gaps shorter than 10 feetrequire it. At each joint between precast <str<strong>on</strong>g>and</str<strong>on</strong>g> cast-in-place barrier, provide hardwarein the cast-in-place secti<strong>on</strong> to tie its end to the abutting precast secti<strong>on</strong>.618.05 Precast C<strong>on</strong>crete Guardwall.(a) Fabricati<strong>on</strong>. A full-size sample <str<strong>on</strong>g>of</str<strong>on</strong>g> the guardwall will be provided at a specifiedlocati<strong>on</strong>. Fabricate the guardwall to match the sample's shape, color, <str<strong>on</strong>g>and</str<strong>on</strong>g> texture. Theguardwall shall also c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>m to the following:(1) Fabricate in a precast c<strong>on</strong>crete producti<strong>on</strong> facility certified by the Nati<strong>on</strong>alPrecast C<strong>on</strong>crete Associati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> according to the Associati<strong>on</strong>'s Manual <str<strong>on</strong>g>of</str<strong>on</strong>g>Quality C<strong>on</strong>trol.(2) Formulate the facing mixes, backing mixes, <str<strong>on</strong>g>and</str<strong>on</strong>g> structural c<strong>on</strong>crete backupto produce c<strong>on</strong>crete mix designs <str<strong>on</strong>g>of</str<strong>on</strong>g> similar aggregate-cement ratios to minimizedifferences in shrinkage factors <str<strong>on</strong>g>and</str<strong>on</strong>g> coefficients <str<strong>on</strong>g>of</str<strong>on</strong>g> thermal expansi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g>c<strong>on</strong>tracti<strong>on</strong>. Formulate using hydraulic cement, limest<strong>on</strong>e, quartz, mica, <str<strong>on</strong>g>and</str<strong>on</strong>g>silicious st<strong>on</strong>es in such proporti<strong>on</strong>s as to match the sample.(3) Use epoxy coated rein<str<strong>on</strong>g>for</str<strong>on</strong>g>cing steel at locati<strong>on</strong>s where the rein<str<strong>on</strong>g>for</str<strong>on</strong>g>cing steel isless than 2 inches from the exposed surface.(4) Cast the segments straight <str<strong>on</strong>g>and</str<strong>on</strong>g> true to a line in str<strong>on</strong>g permanent compositemolds <str<strong>on</strong>g>of</str<strong>on</strong>g> steel, plastic resins, c<strong>on</strong>crete, or rubber.(5) Cast the facing mixes a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g> 1 inch thick. Ensure a good b<strong>on</strong>dbetween facing <str<strong>on</strong>g>and</str<strong>on</strong>g> backup mixes.(6) Provide 4 lifting inserts in unexposed areas. Provide removable caps <str<strong>on</strong>g>for</str<strong>on</strong>g> thelifting inserts to allow <str<strong>on</strong>g>for</str<strong>on</strong>g> future segment replacement.(b) Test secti<strong>on</strong>. Dem<strong>on</strong>strate the ability to match the sample by fabricating a 10-foot, full-scale guardwall test secti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> delivering it to the locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the sample <str<strong>on</strong>g>for</str<strong>on</strong>g>comparis<strong>on</strong>. If the test secti<strong>on</strong> is not in reas<strong>on</strong>ably close c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity to the sample,fabricate another test secti<strong>on</strong> according to (a) above. Test secti<strong>on</strong>s that do not matchthe sample may not be used in the wall installati<strong>on</strong>.526

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!