12.07.2015 Views

Standard Specifications for Construction of Roads and Bridges on ...

Standard Specifications for Construction of Roads and Bridges on ...

Standard Specifications for Construction of Roads and Bridges on ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Secti<strong>on</strong> 618(c) Installati<strong>on</strong>. After the test secti<strong>on</strong> is approved, produce the guardwall secti<strong>on</strong>s tomatch the approved test secti<strong>on</strong>. Prevent damage to the segments during fabricati<strong>on</strong>,h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling, delivery, <str<strong>on</strong>g>and</str<strong>on</strong>g> installati<strong>on</strong>. Repair or replace all damaged secti<strong>on</strong>s. Preparethe foundati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> place the secti<strong>on</strong>s. Use backer rods <str<strong>on</strong>g>and</str<strong>on</strong>g> joint sealant in the secti<strong>on</strong>joints to match the false joints.At 100-foot intervals <str<strong>on</strong>g>and</str<strong>on</strong>g> at low points in the guardwall, dig outlet ditches <str<strong>on</strong>g>and</str<strong>on</strong>g> fillthem with 6 inches <str<strong>on</strong>g>of</str<strong>on</strong>g> aggregate c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>ming to AASHTO M 43, number 57.618.06 Terminal Secti<strong>on</strong>s. Where barrier is being c<strong>on</strong>structed next to roadway lanesopen to traffic, c<strong>on</strong>nect an approved temporary terminal secti<strong>on</strong> to the barrier at the end <str<strong>on</strong>g>of</str<strong>on</strong>g>each day.C<strong>on</strong>struct permanent graded berms according to Secti<strong>on</strong> 204.618.07 Resetting Barrier. Reset barrier <str<strong>on</strong>g>and</str<strong>on</strong>g> terminal secti<strong>on</strong>s according to Subsecti<strong>on</strong>s618.03 <str<strong>on</strong>g>and</str<strong>on</strong>g> 618.06. Store barrier secti<strong>on</strong>s in an approved locati<strong>on</strong> when resetting cannotimmediately follow removal.618.08 Acceptance. Material <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>crete barrier <str<strong>on</strong>g>and</str<strong>on</strong>g> precast guardwall (except c<strong>on</strong>crete<str<strong>on</strong>g>and</str<strong>on</strong>g> rein<str<strong>on</strong>g>for</str<strong>on</strong>g>cing steel) will be evaluated under Subsecti<strong>on</strong>s 106.02 <str<strong>on</strong>g>and</str<strong>on</strong>g> 106.03.<str<strong>on</strong>g>C<strong>on</strong>structi<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>crete barriers <str<strong>on</strong>g>and</str<strong>on</strong>g> precast c<strong>on</strong>crete guardwalls will be evaluated underSubsecti<strong>on</strong>s 106.02 <str<strong>on</strong>g>and</str<strong>on</strong>g> 106.04.C<strong>on</strong>crete barrier <str<strong>on</strong>g>and</str<strong>on</strong>g> precast c<strong>on</strong>crete guardwall appearance will be evaluated underSubsecti<strong>on</strong> 106.02.Precast c<strong>on</strong>crete guardwall test secti<strong>on</strong>s will be evaluated under Subsecti<strong>on</strong> 106.02.C<strong>on</strong>crete will be evaluated under Secti<strong>on</strong> 552.Rein<str<strong>on</strong>g>for</str<strong>on</strong>g>cing steel will be evaluated under Secti<strong>on</strong> 554.Measurement618.09 Measure the Secti<strong>on</strong> 618 items listed in the bid schedule according to Subsecti<strong>on</strong>109.02 <str<strong>on</strong>g>and</str<strong>on</strong>g> the following as applicable.Measure c<strong>on</strong>crete barrier <str<strong>on</strong>g>and</str<strong>on</strong>g> precast c<strong>on</strong>crete guardwall excluding terminal secti<strong>on</strong>s.Measure reset barrier in the relocated positi<strong>on</strong> including terminal secti<strong>on</strong>s.Measure earth berms under Secti<strong>on</strong> 204.527

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!