12.07.2015 Views

condominium housing in ethiopia - International Union of Tenants

condominium housing in ethiopia - International Union of Tenants

condominium housing in ethiopia - International Union of Tenants

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Series Summary:Hous<strong>in</strong>g Practices: country experiences <strong>of</strong> design<strong>in</strong>g and implement<strong>in</strong>g affordable <strong>hous<strong>in</strong>g</strong> programmesHous<strong>in</strong>g Practices is an ongo<strong>in</strong>g series that documents the experiences <strong>of</strong> countries who are implement<strong>in</strong>g large-scaleaffordable <strong>hous<strong>in</strong>g</strong> programmes. It is a flagship series developed and produced by the Hous<strong>in</strong>g Policy Section <strong>of</strong> UN-HABITAT, which provides authoritative and <strong>in</strong>dependent documentation <strong>of</strong> <strong>in</strong>novative affordable <strong>hous<strong>in</strong>g</strong> programmes<strong>in</strong> countries <strong>of</strong> the develop<strong>in</strong>g world.Rather than draw<strong>in</strong>g from theory or abstract models, Hous<strong>in</strong>g Practices addresses the demand for practical guidanceon <strong>hous<strong>in</strong>g</strong> programmes based on experience. Each volume holistically documents one ‘best-practice’ <strong>hous<strong>in</strong>g</strong>programme that has achieved significant results. The volumes are thoroughly researched and presented <strong>in</strong> a way thatclearly communicates the country’s <strong>hous<strong>in</strong>g</strong> sector context, the elements <strong>of</strong> the programme, key achievements andchallenges, and suggestions for further programme improvement.Dissem<strong>in</strong>at<strong>in</strong>g up-to-date <strong>in</strong>formation on country-specific large-scale <strong>hous<strong>in</strong>g</strong> programmes is vital to reveal to otherdevelop<strong>in</strong>g countries the programmatic opportunities for address<strong>in</strong>g their <strong>hous<strong>in</strong>g</strong> shortages, reduc<strong>in</strong>g slum formationand growth, and improv<strong>in</strong>g the <strong>hous<strong>in</strong>g</strong> conditions <strong>of</strong> their citizens.Copyright © United Nations Human Settlements Programme (UN-HABITAT), 2011All rights reservedUnited Nations Human Settlements Programme (UN-HABITAT)PO Box 30030, Nairobi, KenyaTel: +254 2 621 234Fax: +254 2 624 266www.unhabitat.orgExcerpts may be reproduced without authorization, on condition that the source is <strong>in</strong>dicated:UN-HABITAT (2010) The Ethiopia Case <strong>of</strong> Condom<strong>in</strong>ium Hous<strong>in</strong>g: The Integrated Hous<strong>in</strong>g Development Programme. UnitedNations Human Settlements Programme: Nairobi.HS Number: HS/023/11EISBN Number (Series): 978-92-1-132033-6ISBN Number (Volume): 978-92-1-132326-9DISCLAIMERThe designations employed and the presentation <strong>of</strong> the material <strong>in</strong> this publication do not imply the expression <strong>of</strong> anyop<strong>in</strong>ion whatsoever on the part <strong>of</strong> the Secretariat <strong>of</strong> the United Nations concern<strong>in</strong>g the legal status <strong>of</strong> any country,territory, city or area, or <strong>of</strong> its authorities, or concern<strong>in</strong>g delimitation <strong>of</strong> its frontiers or boundaries, or regard<strong>in</strong>g itseconomic system or degree <strong>of</strong> development. The analysis, conclusions and recommendations <strong>of</strong> the report do notnecessarily reflect the views <strong>of</strong> the United Nations Human Settlements Programme, the Govern<strong>in</strong>g Council <strong>of</strong> theUnited Nations Human Settlements Programme or its Member States.Photos:© UN-HABITAT / Kather<strong>in</strong>e HegabEditor:Cover Design and Layout:Pr<strong>in</strong>t<strong>in</strong>g:Roman Rollnik, Matthew French and Ellen DaltropGideon MureithiUNON, Publish<strong>in</strong>g Services Section, Nairobi, ISO 14001:2004-certified.


acknowledgementsThis report was prepared by Matthew French and Kather<strong>in</strong>e Hegab from the Hous<strong>in</strong>g Policy Section, UN-HABITAT.Kather<strong>in</strong>e Hegab and Rasmus Precht undertook the UN-HABITAT mission to Addis Ababa where they conductedresearch through site-visits, <strong>in</strong>terviews with key stakeholders and household surveys on <strong>condom<strong>in</strong>ium</strong> sites. ClaudioAcioly, Christophe Lalande and Rasmus Precht from Hous<strong>in</strong>g Policy Section, UN-HABITAT, supervised andf<strong>in</strong>alised all outputs <strong>of</strong> this project. Valuable comments were provided by UN-HABITAT’s Regional Office for Africaand the Arab States.UN-HABITAT acknowledges the contribution <strong>of</strong> all <strong>in</strong>dividuals and organisations whose names are listed below. Inaddition to those mentioned here, appreciation is given to the households who participated <strong>in</strong> the household surveysundertaken <strong>in</strong> Bole Gerji and Gotera.Oqubay Arkebe, Abraham Tekeste, Amare Asgedom, Manuela Graetz, Sissay Dejene, Tadesse G. Gtorgis, GetachewErieso, Yass<strong>in</strong> Morku, Tenadem Zewdie, Yemane Tsegaye, Lealem Berhanu, Yigzaw Mekonnen, Tsedale Mamo,Wendwosen Demerew, Mesf<strong>in</strong> Ayalew, Esrael Tesfaye, Belaynesh Teklay, Tewodros Tigabu Alemu, Mesele Haile,Alessandra Tisot, Esayas Abebe, Mesf<strong>in</strong> Assefa, Abay Mehari, Yoseph Tesfaye, Mahlet Mekonnen, Tamrat G. Giorgis,Nigel Browne, Solomon Keffa, Matthew French, Christophe Lalande, Rasmus Precht, Ellen Daltrop.This publication was funded by the Participatory Slum Upgrad<strong>in</strong>g Programme (PSUP), a jo<strong>in</strong>t <strong>in</strong>itiative by theEuropean Commission and the African, Caribbean and Pacific (ACP) Secretariat and implemented by UN-HABITAT.Condom<strong>in</strong>ium Hous<strong>in</strong>g programme: <strong>ethiopia</strong>i


contentsACKNOWLEDGEMENTSTABLE OF CONTENTSLIST OF TABLESLIST OF FIGURESEXECUTIVE SUMMARYiiiiiiivviiPART ONE: THE ETHIOPIAN HOUSING SECTOR 11.1 INTRODUCTION TO ETHiopia 11.2 BRIEF HISTORY OF LAND AND HOUSING IN ETHiopia 21.3 CURRENT STATE OF THE HOUSING SECtor 41.3.1 POLICY AND LEGAL FRAMEWORKS RELATED TO Hous<strong>in</strong>g 41.3.2 KEY PLAYERS IN Hous<strong>in</strong>g 41.3.3 HOUSING STOCK 51.3.4 HOUSING NEEDS AND EFFECTIVE demand 61.3.5 URBAN INFRASTRUCTURE AND BASIC URBAN SERVICes 71.3.6 HOUSING FINANCe 71.3.7 CONSTRUCTION INDUSTRY AND BUILDING MATERIALs 71.3.8 CROSS-CUTTING issues 91.3.9 CURRENT LOW-INCOME HOUSING APPROACHes 91.4 THE VISION OF THE INTEGRATED HOUSING DEVELOPMENT programme 10PART TWO: THE INTEGRATED HOUSING DEVELOPMENT PROGRAMME 132.1 OVERVIEW, ORIGINS AND SIGNIFICANCE OF THE programme 132.2 PROGRAMME design 152.2.1 INSTITUTIONAL FRAMEWORK 152.2.2 LEGAL FRAMEWORKs 172.2.3 PROGRAMME FINANCe 172.2.4 LOCATION OF PROJECts 192.2.5 CONSISTENT PROJECT SPECIFIC Features 20CONDOMINIUM HOUSING TYPOLogies 20COMMERCIAL units 22COMMUNAL BUILd<strong>in</strong>gs 22COSTING, QUANTITY SURVEYING AND CONSTRUCtion 24target BENEFICIARIES AND UNIT ALLOCation 262.3 PROJECT design 272.3.1 AN OVERVIEW OF PROJECts 272.3.2 PROJECT DESIGN AND IMPLementation 27site SELECtion 27preLIMINARY SITE AND HOUSING UNIT design 28LAND CLEARANCE, COMPENSATION, TEMPORARY RESETTLEMENT 28CONSTRUCTION CONTRACTOR engagement 28CONSTRUCTION stage 29unit ALLOCATION AND TRANSFer 29post-OCCUPANCY stage 302.4 CASE studies 31BOLE GERJI – THE CONDOMINIUM PILOT PROJECt 31LIDETA – THE FIRST INNER-CITY RELOCATION PROJECT<strong>in</strong> ADDIS ABABa 31iiContents


PART THREE: PROGRAMME PERFORMANCE 373.1 ANTICIPATED RESULTS AND ACHIEVements 37impaCT ON COUNTRY 37LARGE SCALE AND LOW Cost 37urBAN AND HOUSING DEVELopment 383.2 UNANTICIPATED RESULTS AND ACHIEVements 38HIGH DEMAND AND SUPPORT FOR THE programme 38LOW-INCOME LANDLords 38LAND AND RENTAL HOUSING MARKet 393.3 UNANTICIPATED CHALLENGES FACING THE programme 39aFFORDABILITY 40programme FINANC<strong>in</strong>g 40BENEFICIARY CONSULTATION AND management 41proJECT SPECIFIC issues 41post-OCCUPANCY issues 43PART FOUR: KEY LESSONS AND CONCLUSIONS 474.1 KEY Lessons 474.2 SUGGESTIONS FOR IMPROVement 47aFFORDABILITY 47<strong>in</strong>FORMATION, CONSULTATION AND COMPENSATION IN THEresettLEMENT PROCess 48design AND CONSTRUCTION IMPROVement 48post-OCCUPANCY 484.3 CONCLUDING REMARKS – AN ACHIEVEMENT WITH POSITIVEside EFFECTS AND SCOPE FOR FURTHER IMPROVements 49BIBLIOGRAPHY 50list <strong>of</strong> TABLESTable 1: Houses constructed <strong>in</strong> Addis Ababa, 1996-2003 4Table 2: Planned Condom<strong>in</strong>ium Hous<strong>in</strong>g Unit construction, 2006-2010 11Table 3: Initial f<strong>in</strong>ancial structure for beneficiaries accord<strong>in</strong>g to unit type 19Table 4: Breakdown <strong>of</strong> unit typologies <strong>in</strong> each <strong>condom<strong>in</strong>ium</strong> block 21Table 5: Unit type and beneficiary <strong>in</strong>come level 26Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>iii


list <strong>of</strong> figuresFigure 1: Bole Gerji: the pilot project for <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> <strong>in</strong> EthiopiaviFigure 2: Addis Ababa is ris<strong>in</strong>g from a city <strong>of</strong> two-storey build<strong>in</strong>gs to a city <strong>of</strong> skyscrapers.Bole, Addis AbabaviiiFigure 3: Kebele <strong>hous<strong>in</strong>g</strong>, Addis Ababa 3Figure 4: Market street, Addis Ababa 3Figure 5: The colossal <strong>condom<strong>in</strong>ium</strong> site <strong>of</strong> Jemo I, II, and III. Addis Ababa 12Figure 6: The hills <strong>of</strong> Addis Ababa 5Figure 7: The physical form <strong>of</strong> <strong>hous<strong>in</strong>g</strong> <strong>in</strong> Ethiopia is predom<strong>in</strong>antly s<strong>in</strong>gle-storey 6Figure 8: Small-scale enterprise <strong>in</strong> Addis Ababa 7Figure 9: ‘Chikka’: the traditional construction material for residential construction 9Figure 10: Construction methods <strong>in</strong> Ethiopia are labour <strong>in</strong>tensive 9Figure 11: Multi-storey build<strong>in</strong>gs <strong>in</strong> Addis Ababa are typically constructed fromcast <strong>in</strong>-situ re<strong>in</strong>forced concrete frame with brick <strong>in</strong>fill walls 9Figure 12: Condom<strong>in</strong>ium <strong>hous<strong>in</strong>g</strong> <strong>of</strong> the Integrated Hous<strong>in</strong>g Development Programme. 10Figure 13: Jemo <strong>condom<strong>in</strong>ium</strong> site, Addis Ababa 22Figure 14: Institutional framework (National (MWUD) and <strong>in</strong> Addis Ababa) 16Figure 15: Bole Summit, the last <strong>condom<strong>in</strong>ium</strong> site to be built on the periphery <strong>of</strong> the cityAddis Ababa 18Figure 16: Project sites <strong>in</strong>clude unit blocks arranged around outdoor green space. Sengatera LDP 1 20Figure 17: Condom<strong>in</strong>ium models at the HDPO Headquarters 21Figure 18: Bole Summit under construction. Addis Ababa 22Figure 19: F<strong>in</strong>ished <strong>condom<strong>in</strong>ium</strong>s <strong>in</strong> Mikililand, Addis Ababa 22Figure 20: Condom<strong>in</strong>ium block typical floor plan, SNNPR. ME Eng<strong>in</strong>eer<strong>in</strong>g 23Figure 21: Condom<strong>in</strong>ium block elevation, SNNPR. ME Eng<strong>in</strong>eer<strong>in</strong>g 24Figure 22: Condom<strong>in</strong>ium sites <strong>in</strong>clude commercial units at ground level <strong>in</strong> an effort to createmixed-use environments. Mikililand <strong>condom<strong>in</strong>ium</strong> site, Addis Ababa 25Figure 23: A communal unit <strong>in</strong> Bole Summit, Addis Ababa 26Figure 24: National distribution <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> projects across the n<strong>in</strong>e regional states<strong>of</strong> Ethiopia 28Figure 25: Lideta site be<strong>in</strong>g cleared 29Figure 26: Construction <strong>of</strong> Bole Summit, Addis Ababa 29Figure 27: Quality checks on build<strong>in</strong>g materials are crucial to ensure a high-quality resultLideta, Addis Ababa 30Figure 28: Workman apply<strong>in</strong>g plaster to the first-storey <strong>of</strong> a <strong>condom<strong>in</strong>ium</strong> blockBole Summit, Addis Ababa 30Figure 29: Lottery w<strong>in</strong>ners are announced around the city. HDPO Headquarters, Addis Ababa 31Figure 30: Accumulated rubbish adjacent to <strong>condom<strong>in</strong>ium</strong> build<strong>in</strong>gs. Mikililand<strong>condom<strong>in</strong>ium</strong> site, Addis Ababa 31Figure 31: Labourers build<strong>in</strong>g the foundations for Lideta <strong>condom<strong>in</strong>ium</strong>s. Lideta, Addis Ababa 33Figure 32: The latest <strong>condom<strong>in</strong>ium</strong> project under construction and the last one to be builton the edge <strong>of</strong> the city: Bole Summit, Addis Ababa 36Figure 33: View from a communal corridor, Bole Gerji, Addis Ababa 39Figure 34: Isolated nature<strong>of</strong> <strong>condom<strong>in</strong>ium</strong> sites on the periphery <strong>of</strong> the city. Bole Summit,Addis Ababa 42ivLIST OF FIGURES, BOXES AND ACRONYMS


Figure 1: The Pilot Project for the Condom<strong>in</strong>ium Hous<strong>in</strong>g Programme built <strong>in</strong> Bole Gerji.Bole Gerji, Addis Ababa. © UN-HABITAT / Kather<strong>in</strong>e HegabviExecutive Summary


Figure 2: Addis Ababa’s ris<strong>in</strong>g from a city <strong>of</strong> two-storey build<strong>in</strong>gs to a city <strong>of</strong> skyscrapers.Bole, Addis Ababa. © UN-HABITAT / Kather<strong>in</strong>e Hegabviii


The EthiopianHous<strong>in</strong>g Sector1.1 Introduction to EthiopiaThe Federal Democratic Republic <strong>of</strong> Ethiopia is acountry <strong>of</strong> contrasts. Ancient rock-hewn churches sitalongside modern bustl<strong>in</strong>g cities. Cold mounta<strong>in</strong>ousregions counterpo<strong>in</strong>t low-ly<strong>in</strong>g tropical monsoonclimates. Eighty dist<strong>in</strong>ct ethnic groups and <strong>in</strong>digenouslanguages differentiate the ethnically diverse population.Small stable villages that are home to the majority <strong>of</strong>the population are dist<strong>in</strong>ct to the enormous and rapidlyexpand<strong>in</strong>g urban areas. The country boasts vast areas <strong>of</strong>cultivable land yet regular food shortages and fam<strong>in</strong>e arecommon, and while there are a select few Ethiopianswith considerable wealth a substantial proportion <strong>of</strong>Ethiopians live <strong>in</strong> extreme poverty.Ethiopia is one <strong>of</strong> the poorest countries <strong>in</strong> the world. It isranked 169 th out <strong>of</strong> 175 countries <strong>in</strong> the United NationsDevelopment Programme Human Development Index.Among other <strong>in</strong>dicators demonstrat<strong>in</strong>g the massivedevelopmental challenges fac<strong>in</strong>g Ethiopia, primaryschool enrolment is remarkably low at only 46 per cent,<strong>in</strong>fant mortality is high at nearly ten per cent (98 childdeaths per thousand), 53 per cent <strong>of</strong> the population isilliterate, and 40 per cent <strong>of</strong> the population lives belowthe poverty l<strong>in</strong>e 1, 2 . National unemployment is high at16.7 per cent 3 , although <strong>in</strong> the capital city <strong>of</strong> AddisAbaba it is even higher at 32 per cent 4 .With a population <strong>of</strong> 79 million, Ethiopia is the secondmost populous country <strong>in</strong> Africa. It is grow<strong>in</strong>g rapidly;the annual growth rate is 2.6 per cent, equat<strong>in</strong>g to twomillionbirths per year 5 .Despite hav<strong>in</strong>g one <strong>of</strong> the lowest proportions <strong>of</strong> urbanpopulation <strong>in</strong> the world at only 16.7 per cent 6 , Ethiopiais rapidly urbanis<strong>in</strong>g at a high annual growth rate <strong>of</strong>3.49 per cent 7 . In the space <strong>of</strong> seventeen years the urbanpopulation more than doubled from 6.4 <strong>in</strong> 1990 to 13.8million <strong>in</strong> 2007 8 . The population is very young with 45per cent under 15 years <strong>of</strong> age 9 .The comb<strong>in</strong>ation <strong>of</strong> high population and urban growthrates coupled with a high prevalence <strong>of</strong> urban povertyhave placed enormous stra<strong>in</strong> on Ethiopian cites. 80per cent <strong>of</strong> the population lives <strong>in</strong> sub-standard slum<strong>hous<strong>in</strong>g</strong> that needs either complete replacement orsignificant upgrad<strong>in</strong>g 12, 13, 14 . Ethiopian cities sufferfrom a high degree <strong>of</strong> homelessness, environmentaldegradation, urban decay, a shortage <strong>of</strong> <strong>in</strong>frastructureand basic services, and high unemployment. These factorscomb<strong>in</strong>e to produce the critical urban issue addressed <strong>in</strong>Contents1chapter one<strong>in</strong>troductionTO ETHIOPIA1.1 Introduction to Ethiopia1.2 Brief history <strong>of</strong> land and<strong>hous<strong>in</strong>g</strong> <strong>in</strong> Ethiopia1.3 Current state <strong>of</strong> the <strong>hous<strong>in</strong>g</strong>sector1.4 The vision <strong>of</strong> the IntegratedHous<strong>in</strong>g DevelopmentProgrammeDESPITE HAVING ONE OF THELOWEST PROPORTIONS OF URBANPOPULATION IN THE WORLD ATONLY 16.7 PER CENT 10 , ETHIOPIAIS RAPIDLY URBANISING AT AHIGH ANNUAL GROWTH RATE OF3.49 PER CENT 11 .Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong> 1


THERE IS MASSIVE DEMAND FORSERVICED, HEALTHY, AFFORDABLEHOUSING. THIS DEMAND STEMSFROM BOTH THE CURRENTHOUSING DEFICIT AND THE POORQUALITY OF THE EXISTING KEBELEHOUSING STOCK THAT IS BEYONDREPAIR.1.3.4 Hous<strong>in</strong>g needs and effective demandFigure 7: The physical form <strong>of</strong> <strong>hous<strong>in</strong>g</strong> <strong>in</strong> Ethiopia ispredom<strong>in</strong>antly s<strong>in</strong>gle-storey. © UN-HABITATThe physical form <strong>of</strong> Ethiopian <strong>hous<strong>in</strong>g</strong> has beendom<strong>in</strong>ated by s<strong>in</strong>gle-storey construction, with a highproportion <strong>of</strong> ‘terrace <strong>hous<strong>in</strong>g</strong>’ (<strong>hous<strong>in</strong>g</strong> units adjo<strong>in</strong><strong>in</strong>gother units rather than free-stand<strong>in</strong>g). Nationally, <strong>in</strong> the1994 census, 98.3 per cent <strong>of</strong> build<strong>in</strong>gs nationwide weres<strong>in</strong>gle storied and the rema<strong>in</strong><strong>in</strong>g 1.7 per cent were multistoriedbuild<strong>in</strong>gs 43 .In terms <strong>of</strong> tenure, private house ownership levels arelow. In Addis Ababa only 30 per cent <strong>of</strong> houses areowner occupied. Rental <strong>hous<strong>in</strong>g</strong> is the dom<strong>in</strong>ant tenuremode. In Addis Ababa, <strong>in</strong> the 1994 census 57.3 percent <strong>of</strong> the <strong>hous<strong>in</strong>g</strong> stock was government-rental, eitherthrough local municipalities, or the National Agency forAdm<strong>in</strong>istration <strong>of</strong> Rental Hous<strong>in</strong>g 44 .THE PHYSICAL FORM OF ETHIOPIANHOUSING HAS BEEN DOMINATED BYSINGLE-STOREY CONSTRUCTION. INTERMS OF TENURE, PRIVATE HOUSEOWNERSHIP LEVELS ARE LOW. INADDIS ABABA ONLY 30 PER CENTOF HOUSES ARE OWNER OCCUPIED.RENTAL HOUSING IS THE DOMINANTTENURE MODE.The government estimates that the current <strong>hous<strong>in</strong>g</strong>deficit is between 900,000 and 1,000,000 units <strong>in</strong> urbanareas, and that only 30 per cent <strong>of</strong> the current <strong>hous<strong>in</strong>g</strong>stock is <strong>in</strong> a fair condition, with the rema<strong>in</strong><strong>in</strong>g 70 percent <strong>in</strong> need <strong>of</strong> total replacement 45 . In Addis Ababaalone, 300,000 units are required to meet the deficit 46 .The <strong>hous<strong>in</strong>g</strong> deficit is set to <strong>in</strong>crease concurrently withthe foreseen high population and urbanization growth.Between 1983 and 2007, Ethiopia’s population morethan doubled, from 33.5 million to 81.2 million 47 , andit is projected to more than double aga<strong>in</strong> by 2050 toreach 170.2 million. To accommodate future growth,the Urban Sector Millennium Development GoalsNeeds Assessment (2004) predicted that to meet theMillennium Development Goals (MDGs) <strong>in</strong> 2015requires a total <strong>of</strong> 2,250,831 units, which equates to aconsiderable 225,000 houses per annum.There is massive demand for serviced, healthy, affordable<strong>hous<strong>in</strong>g</strong>. This demand stems from both the current<strong>hous<strong>in</strong>g</strong> deficit and the poor quality <strong>of</strong> the exist<strong>in</strong>gkebele <strong>hous<strong>in</strong>g</strong> stock that is beyond repair. However,there is low effective demand. Effective demand is basedon the ability and will<strong>in</strong>gness to pay for <strong>hous<strong>in</strong>g</strong>,affected by <strong>in</strong>come and what households are prepared topay. Although effective demand is difficult to determ<strong>in</strong>ebecause it requires reliable data on <strong>in</strong>come levels andexpenditure patterns <strong>of</strong> households, their sav<strong>in</strong>gscapacity and prioritisation <strong>of</strong> <strong>hous<strong>in</strong>g</strong> vis-à-vis otherforms <strong>of</strong> <strong>in</strong>vestment, it is the case that the majority <strong>of</strong>Ethiopians cannot pay for formal <strong>hous<strong>in</strong>g</strong> supplied bythe private market. Therefore, the greatest need is foraffordable <strong>hous<strong>in</strong>g</strong>.6INTRODUCTION TO ETHIOPIA


1.3.5 Urban <strong>in</strong>frastructure and basic urbanservicesInfrastructure and basic urban service provision islow. The majority <strong>of</strong> Kebeles have access to water andelectricity but they have limited access to adequatesanitation systems. The sewerage network is small; <strong>in</strong>Addis Ababa it covers only 3 per cent <strong>of</strong> the city’s area.As with <strong>hous<strong>in</strong>g</strong>, <strong>in</strong>frastructure and basic urban servicesare provided and regulated by the state.1.3.6 Hous<strong>in</strong>g f<strong>in</strong>anceThere is a dist<strong>in</strong>ct absence <strong>of</strong> a diversified and flexible<strong>hous<strong>in</strong>g</strong> f<strong>in</strong>ance sector <strong>in</strong> Ethiopia. For many years, theConstruction and Bus<strong>in</strong>ess Bank (CBB) (formerly theHous<strong>in</strong>g and Sav<strong>in</strong>gs Bank) was the only bank to <strong>of</strong>fer<strong>hous<strong>in</strong>g</strong> construction loans and long-term mortgagesfor the procurement <strong>of</strong> <strong>hous<strong>in</strong>g</strong>. The Bank, which wasowned by the government <strong>of</strong> Ethiopia, relied heavilyon the Central Bank for its capital. Dur<strong>in</strong>g previousregimes this was not a problem, as the governmentwas responsible for the procurement <strong>of</strong> <strong>hous<strong>in</strong>g</strong> for theurban poor and <strong>hous<strong>in</strong>g</strong> units were completed and heldby the government <strong>in</strong> a rental portfolio. However, <strong>in</strong>the 1990s, the Construction and Bus<strong>in</strong>ess Bank startedlend<strong>in</strong>g money directly to <strong>hous<strong>in</strong>g</strong> cooperatives. Overall,this centralized f<strong>in</strong>ancial set-up has resulted <strong>in</strong> a <strong>hous<strong>in</strong>g</strong>f<strong>in</strong>ance sector that is very limited <strong>in</strong> its scope anddiversity <strong>of</strong> the products it <strong>of</strong>fers.A major challenge fac<strong>in</strong>g secur<strong>in</strong>g affordable <strong>hous<strong>in</strong>g</strong> forlow-<strong>in</strong>come Ethiopians has been access to <strong>hous<strong>in</strong>g</strong> f<strong>in</strong>ance.A MAJOR CHALLENGE FACINGSECURING AFFORDABLE HOUSINGFOR LOW-INCOME ETHIOPIANSHAS BEEN ACCESS TO HOUSINGFINANCE. FOLLOWING THEMARKET-LED ADJUSTMENTSIMPLEMENTED IN THE POST-1991PERIOD, SUBSIDIZED INTERESTRATES WERE REMOVED WHICHSIGNIFICANTLY INCREASEDLENDING RATES.Follow<strong>in</strong>g the market-led adjustments implementedpost-1991, subsidized <strong>in</strong>terest rates were removed whichsignificantly <strong>in</strong>creased lend<strong>in</strong>g rates. Rates <strong>in</strong>creasedfrom 4.5 per cent for co-operatives and 7.5 per cent for<strong>in</strong>dividuals to 16 per cent for both, severely reduc<strong>in</strong>g theopportunity for the low-<strong>in</strong>come households to securea home loan 48 . Furthermore, with a high percentage<strong>of</strong> low-<strong>in</strong>come people receiv<strong>in</strong>g <strong>in</strong>come from <strong>in</strong>formalsources and lack<strong>in</strong>g capital to use as collateral, accessto formal credit has been limited or non-existent. Thelow level <strong>of</strong> domestic sav<strong>in</strong>gs <strong>of</strong> the population, coupledwith the shortage <strong>of</strong> external resources, has affectedthe availability <strong>of</strong> <strong>in</strong>vestment <strong>in</strong> the <strong>hous<strong>in</strong>g</strong> sector. Atthe household level, these translate <strong>in</strong>to a low level <strong>of</strong><strong>in</strong>vestment <strong>in</strong> <strong>hous<strong>in</strong>g</strong>, and little capacity <strong>of</strong> the low<strong>in</strong>comepopulation to own m<strong>in</strong>imum-standard <strong>hous<strong>in</strong>g</strong>.Houses <strong>of</strong> a m<strong>in</strong>imum standard have simply been out <strong>of</strong>f<strong>in</strong>ancial reach for the poor 49 .1.3.7 Construction <strong>in</strong>dustry and build<strong>in</strong>gmaterialsAs with f<strong>in</strong>ance and urban service provision, thegovernment significantly controls the construction<strong>in</strong>dustry. Before 1991 the government had a monopolyover the production and supply <strong>of</strong> build<strong>in</strong>g materials.Even though the government is still active <strong>in</strong> retail<strong>in</strong>gand some subsidies rema<strong>in</strong> <strong>in</strong> place, material productionand supply is gradually shift<strong>in</strong>g to a market basedapproach where prices are by-and-large market prices 50 .Build<strong>in</strong>g materials are high <strong>in</strong> price and <strong>of</strong> a low qualityrelative to neighbour<strong>in</strong>g countries 51 .Figure 8: Small-scale enterprise <strong>in</strong> Addis Ababa. © UN-HABITATFor low-<strong>in</strong>come <strong>hous<strong>in</strong>g</strong> the most common build<strong>in</strong>gmaterials used are wattle and daub (‘chikka’) forwalls, with ro<strong>of</strong> rafters <strong>of</strong> round tree lengths (usuallyEucalyptus) covered with corrugated iron sheet<strong>in</strong>g, andCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>7


skim concrete or compacted earth floor. Larger multistoreycommercial and residential build<strong>in</strong>gs <strong>in</strong> urbanareas are composed <strong>of</strong> re<strong>in</strong>forced concrete frame and slabconstruction with hollow brick or fired brick <strong>in</strong>fill walls.There is a press<strong>in</strong>g need for more cost efficient alternativematerials, as the current cost <strong>of</strong> construction materialsis a high proportion <strong>of</strong> total construction cost, typicallyaround 70 per cent 52 .Figure 9: ‘Chikka’: the traditional construction material forresidential construction. © UN-HABITATThe construction <strong>in</strong>dustry comprises four ma<strong>in</strong>sectors: build<strong>in</strong>g and residential development sector(construction companies), civil eng<strong>in</strong>eer<strong>in</strong>g sector,pr<strong>of</strong>essional services, and <strong>in</strong>formal self-build<strong>in</strong>g sector 53 .Construction companies are classified accord<strong>in</strong>g tosize, expertise, and f<strong>in</strong>ancial capability. They must beregistered with the MWUD and licensed to undertakeconstruction work. There is little specialisation <strong>in</strong>contractors work, with contractors tak<strong>in</strong>g on all aspects<strong>of</strong> a build<strong>in</strong>g project (rather than specific tasks such asfoundations, structure, ro<strong>of</strong><strong>in</strong>g, etc) 54 .The pr<strong>of</strong>essional services sector comprises mostlyarchitects, eng<strong>in</strong>eers (mechanical, sanitary) and quantitysurveyors. Logically, the <strong>in</strong>formal self-build<strong>in</strong>g sector isnot registered but supplies materials and labour at a verylarge scale, employ<strong>in</strong>g a large number <strong>of</strong> people. There islittle cross-collaboration between the pr<strong>of</strong>essional sectorand <strong>in</strong>formal sector.Figure 10: Construction methods <strong>in</strong> Ethiopia are labour<strong>in</strong>tensive. © UN-HABITATThe national Ethiopian Build<strong>in</strong>g Code, EthiopianBuild<strong>in</strong>g Proclamation 624/2009 is a legal documentthat outl<strong>in</strong>es the build<strong>in</strong>g regulations and requirements,for use by local authorities to ensure build<strong>in</strong>g standardsare ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> their jurisdiction. Parts <strong>of</strong> Ethiopiaare located <strong>in</strong> an earthquake zone and a code exists toensure build<strong>in</strong>gs resist maximum predicted earthquakeloads. The codes are only used and enforced <strong>in</strong> build<strong>in</strong>gsdeveloped <strong>in</strong> the formal sector.The construction sector is undergo<strong>in</strong>g several changes.The government’s plan for the budget year <strong>of</strong> 2008/09was to enhance “the capacity <strong>of</strong> the construction <strong>in</strong>dustryby mak<strong>in</strong>g it capable and competitive, enhanc<strong>in</strong>g itscontribution to the country’s economy, enabl<strong>in</strong>g it tomeet the demand for <strong>hous<strong>in</strong>g</strong> construction, and enabl<strong>in</strong>git to create ample employment opportunities” 55 . It aimedto achieve this by improv<strong>in</strong>g construction <strong>in</strong>dustrypolicy; develop<strong>in</strong>g a construction <strong>in</strong>dustry capacitybuild<strong>in</strong>g programme; and ratify<strong>in</strong>g and implement<strong>in</strong>gthe national build<strong>in</strong>g proclamation 56 .Figure 11: Multi-storey build<strong>in</strong>gs <strong>in</strong> Addis Ababa are typicallyconstructed from cast <strong>in</strong>-situ re<strong>in</strong>forced concrete frame withbrick <strong>in</strong>fill walls. © UN-HABITAT8INTRODUCTION TO ETHIOPIA


The government aims to meet nearly half the <strong>hous<strong>in</strong>g</strong>needs and to support private sector to provide the otherportion 70 . After further elaboration <strong>of</strong> the programme,the target was 360,000 residential <strong>condom<strong>in</strong>ium</strong> unitsacross a range <strong>of</strong> <strong>hous<strong>in</strong>g</strong> typologies (Table 2) and 9,000commercial units.Table 2: Planned Condom<strong>in</strong>ium Hous<strong>in</strong>g Unit construction, 2006-2010Studio 1 Bedroom 2 Bedroom 3 Bedroom Total unitsAddis Ababa 36,750 71,750 52,500 14,000 175,000Other regional states 38,850 75,850 55,500 14,800 185,000Total 75,600 147,600 108,000 28,800 360,000% distribution 21% 41% 30% 8% 100%Source: adapted from Dolicho, E. (2006) Condom<strong>in</strong>ium, A New Hous<strong>in</strong>g Development Approach for Address<strong>in</strong>g the Low IncomeHous<strong>in</strong>g Problem <strong>of</strong> Addis Ababa, Ethiopia (F<strong>in</strong>al Report). ICHUD, IHS, June 2006, Rotterdam, The Netherlands.Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>11


Figure 13: The collosal <strong>condom<strong>in</strong>ium</strong> site <strong>of</strong> Jemo I, II and IIIJemo, Addis Ababa © UN-HABITAT / Kather<strong>in</strong>e Hegab


At the start <strong>of</strong> the programme, the Mayor created asteer<strong>in</strong>g committee, composed <strong>of</strong> the Bureau Heads <strong>of</strong>the Addis Ababa City Adm<strong>in</strong>istration and representativesfrom GTZ and MH Eng<strong>in</strong>eer<strong>in</strong>g, an Ethiopian designand eng<strong>in</strong>eer<strong>in</strong>g consult<strong>in</strong>g firm. Later, the Hous<strong>in</strong>gDevelopment Project Office assumed full management<strong>of</strong> the programme and a Board <strong>of</strong> Governors conta<strong>in</strong><strong>in</strong>gall members <strong>of</strong> the former steer<strong>in</strong>g committee, exceptthe GTZ representative, was created.Significance <strong>of</strong> the programmeThe Ethiopian Integrated Hous<strong>in</strong>g DevelopmentProgramme is an ambitious programme that directlyaddresses the press<strong>in</strong>g low-<strong>in</strong>come <strong>hous<strong>in</strong>g</strong> challenge. Theprogramme is significant and worthy <strong>of</strong> documentationfor four pr<strong>in</strong>cipal reasons.1. Large scaleThe programme is a large-scale approach to address<strong>in</strong>gthe current <strong>hous<strong>in</strong>g</strong> deficit, the poor quality <strong>of</strong> theexist<strong>in</strong>g <strong>hous<strong>in</strong>g</strong> stock, and the future <strong>hous<strong>in</strong>g</strong> needsdue to cont<strong>in</strong>ued urbanization. Ethiopia is one <strong>of</strong> fewcountries <strong>in</strong> Africa that has recently implemented aprogramme at such an ambitious scale. The large scalecontrasts the prevail<strong>in</strong>g approach <strong>of</strong> small-scale projectbasedslum upgrad<strong>in</strong>g and <strong>hous<strong>in</strong>g</strong> cooperative schemes.2. Pro-poorThe programme allows low- and middle-<strong>in</strong>comehouseholds, who typically live <strong>in</strong> precarious <strong>hous<strong>in</strong>g</strong>situations to access improved <strong>hous<strong>in</strong>g</strong>. Through theconstruction <strong>of</strong> durable, fully-serviced <strong>hous<strong>in</strong>g</strong> unitsthe programme greatly improves their liv<strong>in</strong>g conditions,security <strong>of</strong> tenure, and access to basic services.Importantly, the programme has facilitated access tocredit for the low-<strong>in</strong>come sector <strong>of</strong> the population,through the Commercial Bank <strong>of</strong> Ethiopia, wherepreviously there was very limited opportunity forlow-<strong>in</strong>come households to secure credit for improved<strong>hous<strong>in</strong>g</strong>.3. Slum prevention and access to homeownershipThe programme marks a radical departure from previousgovernment-owned rental <strong>hous<strong>in</strong>g</strong> approaches to that<strong>of</strong> private homeownership. The programme highlightsgovernment and local authority commitment toaddress<strong>in</strong>g <strong>hous<strong>in</strong>g</strong> affordability for the low-<strong>in</strong>comesector <strong>of</strong> the population and improv<strong>in</strong>g the liv<strong>in</strong>gconditions <strong>of</strong> the low-<strong>in</strong>come urban dwellers to meetthe MDGs and reduce urban slum prevalence rates <strong>in</strong>Ethiopia.4. Integrated approach to <strong>hous<strong>in</strong>g</strong> and economicdevelopmentThe programme recognizes the opportunity for <strong>hous<strong>in</strong>g</strong>to stimulate the economy, create employment, andimprove the capacity <strong>of</strong> the construction and f<strong>in</strong>ancialsectors. The adoption <strong>of</strong> cost-effective constructiontechniques and systems, notably pre-cast concreteelements, have reduced construction costs (by up to30 per cent) compared with conventional systems,improved the speed <strong>of</strong> construction, and facilitated thedevelopment <strong>of</strong> small and medium enterprises to produceconstruction elements. Furthermore, effective quantitysurvey<strong>in</strong>g and construction management systems havehelped reduce construction costs and material wastage,result<strong>in</strong>g <strong>in</strong> a programme that is extremely cost-efficient.Box 1: Condom<strong>in</strong>ium <strong>hous<strong>in</strong>g</strong>: a broaddef<strong>in</strong>ition <strong>of</strong> a <strong>hous<strong>in</strong>g</strong> typologyCondom<strong>in</strong>ium <strong>hous<strong>in</strong>g</strong> is a name given to the form <strong>of</strong><strong>hous<strong>in</strong>g</strong> tenure where each resident household ownstheir <strong>in</strong>dividual unit, but equally shares ownership andresponsibility for the communal areas and facilities <strong>of</strong>the build<strong>in</strong>g, such as hallways, heat<strong>in</strong>g systems, andelevators. There is no <strong>in</strong>dividual ownership over plots <strong>of</strong>land. All <strong>of</strong> the land on a <strong>condom<strong>in</strong>ium</strong> site is ownedby all homeowners.Usually, the external ma<strong>in</strong>tenance <strong>of</strong> the ro<strong>of</strong> and wallsare undertaken by a Condom<strong>in</strong>ium Association thatjo<strong>in</strong>tly represents ownership <strong>of</strong> the whole complex,employ<strong>in</strong>g strict management to ensure fund<strong>in</strong>gfrom each homeowner. This Association consists <strong>of</strong>representatives <strong>of</strong> all <strong>condom<strong>in</strong>ium</strong> residents whomanage the site through a Board <strong>of</strong> Directors, electedby Association members.A register <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> units and common areason site and any restrictions on their use is commonlyestablished <strong>in</strong> a Master Deed which authorizes theBoard <strong>of</strong> Directors to adm<strong>in</strong>ister <strong>condom<strong>in</strong>ium</strong> affairsand assess owners on their performance <strong>of</strong> adequatema<strong>in</strong>tenance. Rules <strong>of</strong> governance are usually covered<strong>in</strong> a separate set <strong>of</strong> Bylaws which generally governthe <strong>in</strong>ternal affairs <strong>of</strong> the <strong>condom<strong>in</strong>ium</strong> blocks.Bylaws usually establish the responsibilities <strong>of</strong> theCondom<strong>in</strong>ium Association; the vot<strong>in</strong>g procedure tobe used at Association meet<strong>in</strong>gs; the qualifications,powers, and duties <strong>of</strong> the Board <strong>of</strong> Directors; thepowers and duties <strong>of</strong> the <strong>of</strong>ficers; and the obligations<strong>of</strong> the owners with regards to assessments,ma<strong>in</strong>tenance, and use <strong>of</strong> their unit and common areas.A set <strong>of</strong> Rules and Regulations, provid<strong>in</strong>g specificdetails <strong>of</strong> restrictions and conduct, are established bythe Board and are more readily amendable than theDeclaration or Bylaws. Typical rules <strong>in</strong>clude mandatoryma<strong>in</strong>tenance fees (<strong>of</strong>ten a monthly collection), pet andlivestock restrictions, and colour/design choices visiblefrom the common areas <strong>of</strong> the build<strong>in</strong>gs. ➤14the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


The upkeep <strong>of</strong> walls and features <strong>in</strong>side a<strong>condom<strong>in</strong>ium</strong> unit is the sole responsibility <strong>of</strong>homeowners themselves. This area is def<strong>in</strong>ed as thearea bounded by the walls <strong>of</strong> the build<strong>in</strong>g, allow<strong>in</strong>gthe homeowner to make some <strong>in</strong>terior modificationswithout creat<strong>in</strong>g an impact on the common areas.These boundaries are specified by a legal declaration,filed with the local govern<strong>in</strong>g authority. Anyth<strong>in</strong>goutside this boundary is held <strong>in</strong> an undividedownership <strong>in</strong>terest by a corporation established at thetime <strong>of</strong> the <strong>condom<strong>in</strong>ium</strong>’s creation.Condom<strong>in</strong>ium unit owners can be permitted to rentout their home to tenants, although leas<strong>in</strong>g rightsmay be subject to conditions or restrictions set forth<strong>in</strong> the orig<strong>in</strong>al declaration, such as a rental cap on thetotal number <strong>of</strong> units a community can lease at anyone time, or otherwise as permitted by local law.The programme recognizes the opportunityfor <strong>hous<strong>in</strong>g</strong> to stimulate the economy, createemployment, and improve the capacity <strong>of</strong> theconstruction and f<strong>in</strong>ancial sectors.2.2 Programme DesignThis section outl<strong>in</strong>es the structure <strong>of</strong> the IntegratedHous<strong>in</strong>g Development Programme. It covers <strong>in</strong>stitutionaland legal frameworks, programme f<strong>in</strong>ance, and specificfeatures common to all projects (such as <strong>hous<strong>in</strong>g</strong> unittypologies, commercial and communal unit provision,and construction cost<strong>in</strong>g).2.2.1 Institutional FrameworkThe <strong>in</strong>stitutional framework is illustrated <strong>in</strong> Figure 14.M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (MWUD)The M<strong>in</strong>istry <strong>of</strong> Works and Urban Development dealswith the <strong>hous<strong>in</strong>g</strong> programme at large. The M<strong>in</strong>istryprovides support and direction at national level whilst aBureau <strong>of</strong> Works and Urban Development <strong>in</strong> each regionhas been set up to coord<strong>in</strong>ate the specific needs <strong>of</strong> thearea. Under the Hous<strong>in</strong>g Development Bureau <strong>in</strong> theMWUD there are four Directors: one to manage <strong>hous<strong>in</strong>g</strong>f<strong>in</strong>ance; one for the implementation mechanisms; onefor capacity build<strong>in</strong>g and one for research and design.Addis Ababa City Adm<strong>in</strong>istrationThe Addis Ababa City Adm<strong>in</strong>istration is the manag<strong>in</strong>gagency for the IHDP <strong>in</strong> Addis Ababa. The <strong>of</strong>fice isresponsible for the selection <strong>of</strong> new sites; the allocation<strong>of</strong> government resources; the extraction <strong>of</strong> funds fromthe city’s budget to f<strong>in</strong>ance construction; the acquisition<strong>of</strong> bonds from the Commercial Bank <strong>of</strong> Ethiopia (CBE)to pay for all other factors <strong>in</strong>clud<strong>in</strong>g the <strong>in</strong>frastructurecosts and design-team costs; and the compensation <strong>of</strong>all households displaced by <strong>in</strong>ner-city renewal. TheCity Adm<strong>in</strong>istration created the Hous<strong>in</strong>g DevelopmentProject Office (HDPO) specifically to manage theimplementation <strong>of</strong> the <strong>hous<strong>in</strong>g</strong> programme.The Hous<strong>in</strong>g Development Project Office (HDPO)The Hous<strong>in</strong>g Development Project Office was setup to ensure the successful delivery <strong>of</strong> the three ma<strong>in</strong>processes <strong>in</strong> the IHDP <strong>in</strong> Addis Ababa: the ‘design’,the ‘construction’, and the ‘<strong>hous<strong>in</strong>g</strong> transfer andadm<strong>in</strong>istration’. Ten sub-city branch <strong>of</strong>fices <strong>of</strong> theHDPO were set up around the city to facilitate theconstruction <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> units. In addition thereare four Hous<strong>in</strong>g Transfer Offices each cluster<strong>in</strong>g severalsub-cities.German Technical Corporation (GTZ)In 2003, GTZ <strong>in</strong>vestigated the technology <strong>of</strong>prefabricated build<strong>in</strong>g materials needed to implementa low-cost <strong>hous<strong>in</strong>g</strong> programme, through their bilateralprogramme. The last project they were <strong>in</strong>volved <strong>in</strong> washanded over to the government <strong>in</strong> March 2010, mark<strong>in</strong>gthe completion <strong>of</strong> their contract. Whilst the organisationwas act<strong>in</strong>g as an implement<strong>in</strong>g body, they engageda project manager to adm<strong>in</strong>ister both the f<strong>in</strong>ance andconstruction aspects <strong>of</strong> the programme.MH Eng<strong>in</strong>eer<strong>in</strong>g (MHE)MH Eng<strong>in</strong>eer<strong>in</strong>g is a large Ethiopian architecture firm.The company, composed <strong>of</strong> 80 architects, civil eng<strong>in</strong>eers,structural eng<strong>in</strong>eers, electrical eng<strong>in</strong>eers, and quantitysurveyors, was responsible for the concept design <strong>of</strong> thefirst <strong>condom<strong>in</strong>ium</strong> project <strong>in</strong> Ethiopia and a succession<strong>of</strong> 31 schemes thereafter, 13 <strong>of</strong> which were under themanagement <strong>of</strong> GTZ, and the rema<strong>in</strong><strong>in</strong>g 18 under themanagement <strong>of</strong> the HDPO.The firm’s <strong>in</strong>itial designs for cost-efficient <strong>condom<strong>in</strong>ium</strong>s<strong>in</strong> Addis Ababa stemmed from their collaboration withthe Low-Cost Hous<strong>in</strong>g Project at GTZ, where they<strong>in</strong>troduced the Cost-Efficient Methodology (LCH-MHsystem) <strong>of</strong> utilis<strong>in</strong>g pre-cast concrete elements <strong>in</strong> build<strong>in</strong>gdesign. MHE produced a manual that addressed the<strong>hous<strong>in</strong>g</strong> problems experienced by the country’s low<strong>in</strong>comegroups and <strong>of</strong>fered their conceptual designsolution as an open and accessible piece <strong>of</strong> work to beexplored.MH Eng<strong>in</strong>eer<strong>in</strong>g has provided supervision for new<strong>condom<strong>in</strong>ium</strong> projects, but has stepped back fromtheir role as the lead design team so as to enable newlyestablished companies to take on the responsibility.Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>15


Figure 14: Institutional framework (National {MWUD} and <strong>in</strong> Addis Ababa).Central Bank <strong>of</strong> Ethiopia (CBE)M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (MWUD)Credit DivisionPolicy Reseach &Plann<strong>in</strong>g BureauUrban DevelopmentCapacity Build<strong>in</strong>g OfficeHous<strong>in</strong>g DevelopmentBureauFederal UrbanPlann<strong>in</strong>g InstituteLand Development &Management BureauAddis Ababa City Adm<strong>in</strong>istrationLand Adm<strong>in</strong>istration andEnvironmental ProtectionBureauF<strong>in</strong>ance andEconomicDevelopmentBureauBureau <strong>of</strong> Works andUrban Development(BoWUD)Land DevelopmentBank<strong>in</strong>g and RenewalProject OfficeLand Adm<strong>in</strong>istrationand ConstructionPermit AuthorityHous<strong>in</strong>g Development Project Office (HDPO)Construction & SupervisionSupport Process Support Process Hous<strong>in</strong>g Transfer & Adm<strong>in</strong>istrationResearchPlann<strong>in</strong>gAudit Legal&BudgetPurchase,F<strong>in</strong>ance &Adm<strong>in</strong>istrationCommunicationAffairsDesign &InfrastructureCoord<strong>in</strong>ation10 Project Offices/ Bureaus for Construction for 10 Sub-cities4 Hous<strong>in</strong>g Transfer OfficesProjectOfficeAradaProjectOfficeLidettaProjectOfficeLaffoProjectOfficeYekaProjectOfficeBoleProjectOfficeKirkosProjectOfficeAddisKetemaProjectOfficeKolfeKeranyoProjectOfficeGulleleProjectOfficeAkaki-KalityHDPO TransferOfficeNorth(Clustered sub-cities)HDPO TransferOfficeSouth(Clustered sub-cities)HDPO TransferOfficeEast(Clustered sub-cities)Contractors Consultants MSEsDesignHDPO TransferOfficeWest(Clustered sub-cities)16the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


Through the firm’s <strong>in</strong>volvement <strong>in</strong> the programme,they have tra<strong>in</strong>ed and certified 13 consultants on costefficientconstruction so far, and have contributed to thejury that decides on the designs for new <strong>condom<strong>in</strong>ium</strong>sites across the country, follow<strong>in</strong>g government-releasedcompetitions. Mr. Haile, Manag<strong>in</strong>g Director <strong>of</strong> theMH Eng<strong>in</strong>eer<strong>in</strong>g, is on the Board <strong>of</strong> Directors for theIHDP, which has been set-up to discuss the design,cost, monitor<strong>in</strong>g, construction, f<strong>in</strong>ance, technology,adm<strong>in</strong>istration, and allocation <strong>of</strong> new <strong>condom<strong>in</strong>ium</strong>projects. The board is composed <strong>of</strong> 11 members and ischaired by the Mayor <strong>of</strong> Addis Ababa.Commercial Bank <strong>of</strong> Ethiopia (CBE)The Commercial Bank <strong>of</strong> Ethiopia is a governmentownedbank, whose mandate is to provide f<strong>in</strong>ancefor commercial purposes. In 2006, facilitated bythe MWUD, the CBE agreed <strong>in</strong> Memorandums <strong>of</strong>Understand<strong>in</strong>g with the five <strong>in</strong>volved regional statesand the city <strong>of</strong> Dire Dawa to purchase bonds <strong>in</strong> orderto enable the regions to f<strong>in</strong>ance the implementation <strong>of</strong>the IHDP. The city <strong>of</strong> Addis Ababa, after exclusivelyus<strong>in</strong>g the cities own budget dur<strong>in</strong>g the first years, alsostarted sell<strong>in</strong>g bonds to the CBE to f<strong>in</strong>ance all factors <strong>of</strong>the programme, <strong>in</strong>clud<strong>in</strong>g construction costs. The Bankprovides fund<strong>in</strong>g for the total cost <strong>of</strong> the programme’simplementation <strong>in</strong> Addis Ababa and <strong>in</strong> the regions, andnot on a site-by-site basis.The Bank has also come to an agreement with theHDPO to provide a loan-service to all <strong>condom<strong>in</strong>ium</strong>beneficiaries, whereby the Bank pays 80 per cent <strong>of</strong> theunit price on behalf <strong>of</strong> the beneficiary at the handover<strong>of</strong> the property (the beneficiaries pay the 20 per centdown payment themselves) and the families enter <strong>in</strong>to aloan-agreement with the CBE to pay back this amountsubject to <strong>in</strong>terest.The Bank benefits from the programme by receiv<strong>in</strong>ga significant <strong>in</strong>flux <strong>of</strong> clients without the needfor advertis<strong>in</strong>g and, as only a small percentage <strong>of</strong><strong>condom<strong>in</strong>ium</strong> beneficiaries (approximately 5 to 10per cent) are able to pay the full 100 per cent <strong>of</strong> theirpayment at handover, the rema<strong>in</strong><strong>in</strong>g enter <strong>in</strong>to loanagreements with the bank.As a result <strong>of</strong> this collaboration, the Bank has accumulated36,933 new customers <strong>in</strong> Addis Ababa alone, and hashanded out the total loan sum <strong>of</strong> ETB 1.7 billion (USD130 million) which is charged at an annual <strong>in</strong>terest rate<strong>of</strong> 8.5 per cent <strong>in</strong>terest rate. The Bank has also providedloans to approximately 4,535 customers <strong>in</strong> the regionalstates, but has chosen not to cont<strong>in</strong>ue their support <strong>in</strong>these regions <strong>in</strong> the future as demand is too low.2.2.2 Legal frameworksWhile the follow<strong>in</strong>g list is not exhaustive, the key lawsrelat<strong>in</strong>g to the IHDP are:Proclamation No. 172/2002 perta<strong>in</strong>s to the lease hold<strong>in</strong>g<strong>of</strong> urban land, with all land <strong>in</strong> public ownership.Proclamation No. 272/2003 stipulates that land isprovided free <strong>of</strong> lease charge for low-cost <strong>hous<strong>in</strong>g</strong>developments.Proclamation No. 370/2003, The Federal Condom<strong>in</strong>iumProclamation, perta<strong>in</strong>s to <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong>. Itdef<strong>in</strong>es <strong>condom<strong>in</strong>ium</strong> as “a build<strong>in</strong>g for residential orother purpose with five or more separately owned unitsand common elements, <strong>in</strong> a high rise or <strong>in</strong> a row <strong>of</strong>houses, and <strong>in</strong>cludes the land hold<strong>in</strong>g <strong>of</strong> the build<strong>in</strong>g” 1 .Proclamation No. 19/2005 deals with beneficiaryeligibility criteria and selection and penalties for noncompliance2 .Proclamation No. 455/2005 affirmed the basis andamounts <strong>of</strong> compensation for displacement and landexpropriation. 90 days notice period must be given;compensation is to be paid at market value; relocationcosts <strong>in</strong>curred must be met; and rental and ownershipoptions must be provided at fair prices, <strong>in</strong> the same ornearby location.Proclamation (number unknown) allowed theimportation <strong>of</strong> cement as the lack <strong>of</strong> locally availablecement caused major construction delays for<strong>condom<strong>in</strong>ium</strong> projects.Regulation No. 15/2004 outl<strong>in</strong>es the establishment <strong>of</strong> theAddis Ababa City Government Hous<strong>in</strong>g DevelopmentProject <strong>of</strong>fice and outl<strong>in</strong>es its duties and responsibilities.Regulation No. 12/2004 outl<strong>in</strong>es the <strong>condom<strong>in</strong>ium</strong>regulations for Addis Ababa city, regulat<strong>in</strong>g furtherdetails to Proclamation No. 370/2003.2.2.3 Programme F<strong>in</strong>anceGovernment f<strong>in</strong>anceThe Integrated Hous<strong>in</strong>g Development Programme isentirely f<strong>in</strong>anced by public resources. The programmewas orig<strong>in</strong>ally funded by the city government’s ownaccount. After three years, however, it became necessaryto consider a new strategy. The new approach came <strong>in</strong> theCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>17


Figure 15: Bole Summit, the last <strong>condom<strong>in</strong>ium</strong> site to be built on the periphery <strong>of</strong> the city. Addis Ababa. © UN-HABITATform <strong>of</strong> the regional and city adm<strong>in</strong>istration purchas<strong>in</strong>gbonds from the Commercial Bank <strong>of</strong> Ethiopia, securedunder a Bond Agreement and pay<strong>in</strong>g them back over fiveyears. Presently, CBE is the only <strong>in</strong>dependent f<strong>in</strong>ancialresource for the <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> Ethiopia and hasso far provided ETB 3.2 billion (USD 246 million) <strong>in</strong>bonds to the government, receiv<strong>in</strong>g a return <strong>of</strong> ETB 2billion (USD 153 million). Up to this date, the <strong>hous<strong>in</strong>g</strong>programme has not received any donor fund<strong>in</strong>g.The IHDP is solely f<strong>in</strong>anced by CBE bonds and the cityadm<strong>in</strong>istration’s own budget. The returns are used topay back the bank bonds where once they were <strong>in</strong>vested<strong>in</strong>to new schemes. An agreement between the cityadm<strong>in</strong>istration and the CBE has ensured that the HDPOdirectly receives the bonds for the implementation <strong>of</strong>the programme, and as a result the HDPO has alreadyborrowed ETB 3 billion (USD 230 million) <strong>in</strong> threeseparate phases.A proportion <strong>of</strong> the Addis Ababa city budget is allocatedto <strong>condom<strong>in</strong>ium</strong> build<strong>in</strong>g construction costs, labourcosts, and <strong>in</strong>frastructure costs. (The <strong>in</strong>frastructure works<strong>in</strong>clude the water supply, the electricity, the roads andthe dra<strong>in</strong>age system). With<strong>in</strong> each project the relativeweight <strong>of</strong> these are 60, 20 and 20 per cent respectively.The federal government and the regional states havesecured a Value Added Tax (VAT) tax exemption (15per cent) on the import <strong>of</strong> all build<strong>in</strong>g materials andmach<strong>in</strong>ery for the IHDP and have allocated ETB 2billion (USD 153 million) for the import <strong>of</strong> loaders,crushers and other mach<strong>in</strong>ery for the rapidly grow<strong>in</strong>gconstruction <strong>in</strong>dustry. This money is transferred directlyto construction companies to allow them to purchase themach<strong>in</strong>ery as and when they need it. The governmenthas also guaranteed exemption from the lease paymentfor land up to 50m² per unit.The construction cost <strong>of</strong> a <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> uniton the private market is estimated to be ETB 2,000/m² (USD 154/m²) The target cost on the pilot project,Bole Gerji, was ETB 800/m² (USD 61/m²) and theactual figure achieved was ETB 886/m² (USD 68/m²).12 per cent <strong>of</strong> this reduction <strong>in</strong> construction costs wasdue to the type <strong>of</strong> technology used, and 38 per cent <strong>of</strong>this reduction was due to the management and level <strong>of</strong><strong>in</strong>ternal f<strong>in</strong>ishes - <strong>in</strong> other words, the phas<strong>in</strong>g strategiesand the absence <strong>of</strong> floor tiles, the floor screed f<strong>in</strong>ish andabsence <strong>of</strong> wall plaster all contributed towards <strong>in</strong>creas<strong>in</strong>gthe affordability <strong>of</strong> the scheme.In the long-term, the programme is structured to be 100per cent cost-recoverable. Beneficiaries will eventuallypay for the full construction cost <strong>of</strong> their <strong>condom<strong>in</strong>ium</strong>sand the land and <strong>in</strong>frastructure cost will be recoveredthrough the sale <strong>of</strong> commercial units. Nevertheless, aswill be discussed <strong>in</strong> Part Three, the question rema<strong>in</strong>sregard<strong>in</strong>g whether or not the various f<strong>in</strong>ancial methodsthe government uses to subsidise <strong>hous<strong>in</strong>g</strong> production <strong>in</strong>the IHDP is a cost-effective and susta<strong>in</strong>able method <strong>of</strong>procur<strong>in</strong>g and f<strong>in</strong>anc<strong>in</strong>g affordable <strong>hous<strong>in</strong>g</strong>.18the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


Beneficiary f<strong>in</strong>anceCondom<strong>in</strong>ium unit beneficiaries are required to make adown-payment out <strong>of</strong> their own sav<strong>in</strong>gs to secure theirunit. The down-payment percentage varies accord<strong>in</strong>gto unit type. Beneficiaries enter <strong>in</strong>to a contractualloan agreement with the CBE on the basis <strong>of</strong> monthly<strong>in</strong>terest and pr<strong>in</strong>cipal repayments. Initially, <strong>in</strong>terestrates for studio units were zero per cent and 2 per centfor 1-bedroom units (Table 3), but the system has beenchanged and <strong>in</strong>cludes annual <strong>in</strong>terest rates <strong>of</strong> 8.5 percent for all units.The project f<strong>in</strong>ance structure aims to cross-subsidizethe studio and one-bedroom units as a pric<strong>in</strong>g strategyto <strong>in</strong>crease affordability for low-<strong>in</strong>come households.Studio and 1-bed units are sold lower than their<strong>in</strong>dividual construction costs and 2- and 3-bedroomunits are sold higher than their <strong>in</strong>dividual constructioncosts. The subsidy percentages are: studio -30 per cent,1-bed -10 per cent, 2-bed +5 per cent, and 3-bed +10per cent <strong>of</strong> unit construction cost. Likewise, there is<strong>in</strong>tended to employ families for six months on theconstruction sites where they could earn ETB 2 a day(USD 15 cents) and save half <strong>of</strong> this to go towardsthe down-payment for a unit. Unfortunately, thisprogramme feature did not eventuate.The Addis Credit Sav<strong>in</strong>gs Institution (AdCSI),established <strong>in</strong> 2000 and capitalized with ETB 517,000(USD 39,000) <strong>in</strong> city funds, provides sav<strong>in</strong>gs accountsand lend<strong>in</strong>g services to <strong>in</strong>dividuals, cooperatives, smallbus<strong>in</strong>esses, and others. It has experienced an <strong>in</strong>crease <strong>in</strong><strong>hous<strong>in</strong>g</strong> lend<strong>in</strong>g as it <strong>of</strong>fers down-payment loans to low<strong>in</strong>comebeneficiaries <strong>of</strong> the IHDP 3 .2.2.4 Location <strong>of</strong> projectsThe IHDP was envisaged as a national <strong>hous<strong>in</strong>g</strong>programme to meet national <strong>hous<strong>in</strong>g</strong> demand.Accord<strong>in</strong>gly, <strong>in</strong> 2006 a decision was taken to implementthe IHDP <strong>in</strong> the n<strong>in</strong>e semi-autonomous adm<strong>in</strong>istrativeTable 3: Initial f<strong>in</strong>ancial structure for beneficiaries accord<strong>in</strong>g to unit typeUnit type Down-payment Interest rate Grace period Repayment periodStudio 10% 0% 6 months 20 years1-Bed 10% 2% 3 months 10 years2-Bed 30% 7.5% - 15 years3-Bed 30% 7.5% - 10 yearsCommercial 100% - - -Source: Based on data from: Haregewo<strong>in</strong>, Y. (2007) Integrated Hous<strong>in</strong>g Development Programs for Urban Poverty Alleviation andSusta<strong>in</strong>able Development (The Case <strong>of</strong> Addis Ababa). Proceed<strong>in</strong>gs, European Network for Hous<strong>in</strong>g Research 2007: Susta<strong>in</strong>able UrbanAreas. Rotterdam, 25-28 June 2007. p.13.cross-subsidy from commercial to residential with thesale <strong>of</strong> commercial units f<strong>in</strong>anc<strong>in</strong>g the construction <strong>of</strong><strong>in</strong>frastructure for each site.No credit or <strong>in</strong>come checks on potential beneficiaries areundertaken. The assumption is that if beneficiaries havethe f<strong>in</strong>ancial capacity to meet their mortgage obligations,they will do so. If not, they will rent out their unit andf<strong>in</strong>ance the mortgage through this <strong>in</strong>come. The CBErefers outstand<strong>in</strong>g mortgage repayments to the HDPO,who, depend<strong>in</strong>g on the grace period, <strong>in</strong> turn may replacethe household with another household who has theability to pay.In an effort to improve affordability for low-<strong>in</strong>comeunemployed households, the programme orig<strong>in</strong>allyregions <strong>of</strong> Ethiopia. It was thought that this actionwould address the problem <strong>of</strong> migration from ruralareas to the urban centres at the source, and potentiallyimprove secondary cities, whilst act<strong>in</strong>g “as a preventivemeasure aga<strong>in</strong>st slum development” 4 .Methodologies and guidel<strong>in</strong>es were drawn from AddisAbaba’s experience <strong>of</strong> the programme, and adapted tosuit the regions. As <strong>of</strong> mid-2010, the programme hadbuilt a total <strong>of</strong> 69,921 units <strong>in</strong> the regions <strong>of</strong> Ethiopia,<strong>of</strong> which 22,699 have been transferred. However, theIHDP has been suspended <strong>in</strong> the regions for a variety <strong>of</strong>reasons. The <strong>condom<strong>in</strong>ium</strong> blocks have been describedas ‘an eye-sore’ <strong>in</strong> the smaller low-rise prov<strong>in</strong>cial townsand demand has been low due to considerably lowerpurchas<strong>in</strong>g power <strong>in</strong> the regions than <strong>in</strong> Addis Ababa.Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>19


2.2.5 Consistent project specific featuresWith<strong>in</strong> the programme there are common elementsacross all <strong>in</strong>dividual <strong>condom<strong>in</strong>ium</strong> projects: the <strong>hous<strong>in</strong>g</strong>design typologies, the provision <strong>of</strong> commercial units andcommunal build<strong>in</strong>gs, cost<strong>in</strong>g and quantity survey<strong>in</strong>gsystems, and build<strong>in</strong>g permits and land transferagreements.Condom<strong>in</strong>ium <strong>hous<strong>in</strong>g</strong> typologiesAt the start <strong>of</strong> the IHDP, the Mayor <strong>of</strong> Addis Ababaat the time, Mr. Oqubay Arkebe, approached thearchitecture and eng<strong>in</strong>eer<strong>in</strong>g firm, MH Eng<strong>in</strong>eer<strong>in</strong>g, tocall upon their assistance to draw up schemes for the firsttwo phases <strong>of</strong> the programme. The firm quickly becamethe lead architect-and-eng<strong>in</strong>eer<strong>in</strong>g firm for the conceptdesigns <strong>of</strong> 31 <strong>condom<strong>in</strong>ium</strong> projects.Their design proposals were based on the logic thatbecause the houses themselves could not be <strong>of</strong> such f<strong>in</strong>equality because <strong>of</strong> the low-cost nature <strong>of</strong> the project,ample outdoor green space had to be accommodated onsiteto make residents feel proud <strong>of</strong> their surround<strong>in</strong>gsand ‘remove the stigma <strong>of</strong> <strong>hous<strong>in</strong>g</strong> for the poor’.They attempted to address the <strong>in</strong>evitable difficultcultural transition <strong>of</strong> some occupants <strong>in</strong> mov<strong>in</strong>g fromlow-rise build<strong>in</strong>gs to high-rise build<strong>in</strong>gs throughprovid<strong>in</strong>g a well-designed neighbourhood, provision <strong>of</strong>communal build<strong>in</strong>gs, and a strong connection to land.Unfortunately, the demands placed on <strong>in</strong>creas<strong>in</strong>g thedensity <strong>of</strong> sites resulted <strong>in</strong> the modification <strong>of</strong> the orig<strong>in</strong>almaster plan and their design pr<strong>in</strong>ciples, specifically theloss <strong>of</strong> the orig<strong>in</strong>al clarity <strong>of</strong> the master plan objectivesand a sizable percentage <strong>of</strong> outdoor green space.Densification is the driv<strong>in</strong>g concept beh<strong>in</strong>d<strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong>. The IHDP believes that isgenerally more expensive to create lateral developmentthan vertical development so high-rise <strong>hous<strong>in</strong>g</strong> shouldbe encouraged, especially <strong>in</strong> valuable <strong>in</strong>ner-citylocations. IHDP projects range <strong>in</strong> density from 175 to300 households per hectare 6 . At present <strong>condom<strong>in</strong>ium</strong>blocks are ‘ground floor plus four storeys (G+4) <strong>in</strong> height,<strong>in</strong> some cases five storeys (G+5), therefore avoid<strong>in</strong>g theneed for a mechanical lift, which m<strong>in</strong>imizes associatedconstruction and ma<strong>in</strong>tenance costs. However, <strong>in</strong> themost recent <strong>condom<strong>in</strong>ium</strong> project, located <strong>in</strong> AddisAbaba’s Lideta district, <strong>condom<strong>in</strong>ium</strong> blocks are groundfloor plus seven storeys (G+7). Although this modelrequires an <strong>in</strong>ternal lift which <strong>in</strong>creases construction andma<strong>in</strong>tenance costs, the value <strong>of</strong> the centrally located landnecessitates the higher density to maximise the use <strong>of</strong> the<strong>in</strong>ner-city land on which it is located.There are four unit typologies <strong>in</strong>corporated <strong>in</strong>to each<strong>condom<strong>in</strong>ium</strong> block: a studio, 1-bedroom, 2-bedroom,and 3-bedroom unit types (Table 4). Each unit <strong>in</strong>cludesa bathroom, which <strong>in</strong>cludes a shower, flush-toilet, andbas<strong>in</strong>, and a separate kitchen. Each unit has water,sewerage, and electricity connections.Typically 40 per cent <strong>of</strong> units are 1-bedroom as statisticshave shown that the balance between floor-area andpurchas<strong>in</strong>g price <strong>of</strong> a 1-bedroom unit is the mostFigure 16: Project sites <strong>in</strong>clude unit blocks arranged around outdoor green space. Sengatera LDP 120the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


popular amongst <strong>condom<strong>in</strong>ium</strong>-applicants. The unittypes are distributed evenly across each storey, ratherthan each storey hav<strong>in</strong>g only one type to encourage amix <strong>of</strong> <strong>in</strong>come groups.The same overall design strategy is used across all projects,although m<strong>in</strong>or modifications are made to make eachproject site specific. The site layout <strong>of</strong> the <strong>condom<strong>in</strong>ium</strong>blocks, commercial units, and communal build<strong>in</strong>gsdepends on the specific site, respond<strong>in</strong>g to availableland area, land typography, and required densities. TheHDPO hires new architects through a competitionsystem to avoid monotony between sites.THE ARRANGEMENT OF THE SPACEON A CONDOMINIUM SITE SHOULDACCOMMODATE NOT ONLY GREENAREAS BUT ALSO SCHOOLS,PLAYGROUNDS, AND COMMERCIALHUBS – SPACES WHICH CANPROVIDE ENOUGH REVENUE TOSUBSIDISE THE HOUSING. THISWOULD CREATE A MIXED-USENEIGHBOURHOOD WHICH SERVESITS COMMUNITY AND, MOSTIMPORTANTLY, AVOIDS DISPLACINGPEOPLE SOCIALLY 5 .Figure 17: Condom<strong>in</strong>ium models at the HDPOHeadquarters.The <strong>condom<strong>in</strong>ium</strong> blocks are constructed from a frame<strong>of</strong> re<strong>in</strong>forced concrete (a mix <strong>of</strong> <strong>in</strong>-situ and pre-cast)with masonry <strong>in</strong>fill walls, plastered both <strong>in</strong>side and out.Units are handed to beneficiaries with skim concretefloors to reduce costs for the government. W<strong>in</strong>dows anddoors are made from metal frames with s<strong>in</strong>gle glaz<strong>in</strong>g.The modular design reduces construction times andallows for the repetition and adaptation <strong>of</strong> designs acrossprojects. The design utilises standard sizes <strong>of</strong> materialstherefore reduc<strong>in</strong>g costs further (for <strong>in</strong>stance standardhollow brick dimensions are kept to remove the need forcutt<strong>in</strong>g them to size).The Government also explored prefabricated walls fittedwith PVC w<strong>in</strong>dows and doors, as used <strong>in</strong> a Ch<strong>in</strong>ese<strong>in</strong>itiative and has utilised pre-cast concrete elements topromote cost efficiency and time-sav<strong>in</strong>g constructionon-site to help to achieve the target construction time <strong>of</strong>between one and one-and-a-half years per <strong>condom<strong>in</strong>ium</strong>site. The <strong>hous<strong>in</strong>g</strong> programme was the first <strong>in</strong> EthiopiaTable 4: Breakdown <strong>of</strong> unit typologies <strong>in</strong> each <strong>condom<strong>in</strong>ium</strong> blockUnit type Floor area (m 2 ) Percentage <strong>in</strong> each blockStudio 45 20Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>21


Figure 18: Bole Summit under constructionAddis Ababa. © UN-HABITAT/ Kather<strong>in</strong>e HegabFigure 19: F<strong>in</strong>ished <strong>condom<strong>in</strong>ium</strong>s <strong>in</strong> MikililandMikililand, Addis Ababa © UN-HABITAT/ Kather<strong>in</strong>e Hegabto employ pre-cast concrete for beams, floor-slabs and<strong>in</strong> some designs, <strong>in</strong>ternal staircases. The blocks have apredicted lifespan <strong>of</strong> 100 years. The seismic capacity <strong>of</strong>the designs are tested and verified us<strong>in</strong>g a computerisedearthquake simulation tool.Commercial unitsTen per cent <strong>of</strong> each <strong>condom<strong>in</strong>ium</strong> site is allocated tocommercial purposes, primarily small shops located atground level but also plots <strong>of</strong> land for commercial use.The commercial units are sold, not rented, and the plots<strong>of</strong> land for commercial use are leased. These commercialunits are small shops, restaurants, pharmacies, salonsand music shops. Although there are no restrictions oncommercial activities, the units are not appropriatelysized for large-scale <strong>in</strong>dustrial enterprises and thereforecan only accommodate small bus<strong>in</strong>esses which do notrequire special spaces or service provision.The provision <strong>of</strong> commercial units aims to ensure mixeduseoccupation <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> sites, which haveseveral benefits over purely residential developments.With as many as 10,000 households liv<strong>in</strong>g on one<strong>condom<strong>in</strong>ium</strong> site (e.g. Jemo site), the commercial unitscapture important revenue from these residents as wellas <strong>of</strong>fer<strong>in</strong>g the convenience for residents to shop locally,reduc<strong>in</strong>g travel distances to obta<strong>in</strong> their shopp<strong>in</strong>g,for <strong>in</strong>stance foodstuffs and related weekly necessities.Likewise, the food outlets and bars that occupy manycommercial units provide an array <strong>of</strong> social spaces<strong>in</strong> which people can meet. Another key reason forthe <strong>in</strong>clusion <strong>of</strong> commercial units was their ability toencourage activity on site at all times <strong>of</strong> the day and night,and therefore <strong>in</strong>crease security and decrease the chances<strong>of</strong> unsociable activity, such as burglary, as people arecont<strong>in</strong>uously mov<strong>in</strong>g around build<strong>in</strong>gs. Furthermore,as already noted, the commercial units are beneficial asthey reduce the purchase price <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> unitsfor beneficiaries through cross-subsidisation betweencommercial units and <strong>hous<strong>in</strong>g</strong> units.Both commercial units and land leases for plots <strong>of</strong> landfor commercial use are sold by auction. These land-leaseauctions happen every 15 days and momentum and<strong>in</strong>terest <strong>in</strong> the plots is heightened by regular market<strong>in</strong>gon the television and radio. Prospective purchasersvisit the site and can then bid at the auction. Once theauction w<strong>in</strong>ners are decided, they sign an agreementwith the City Adm<strong>in</strong>istration to confirm the terms <strong>of</strong>payment for the site and follow all legal procedures. Thew<strong>in</strong>ners <strong>of</strong> the land development auctions are permitteda land-use right <strong>of</strong> 99 years.Communal build<strong>in</strong>gsThe provision <strong>of</strong> communal build<strong>in</strong>gs to <strong>condom<strong>in</strong>ium</strong>sites was an attempt to respond to the cultural needs <strong>of</strong>residents. The function <strong>of</strong> the communal build<strong>in</strong>gs isto provide a protected space for residents to performtraditional tasks such as slaughter<strong>in</strong>g goats, handwash<strong>in</strong>glaundry, and cook<strong>in</strong>g extensive meals: activitiesthe <strong>hous<strong>in</strong>g</strong> units themselves cannot accommodate.They are typically freestand<strong>in</strong>g masonry build<strong>in</strong>gs located<strong>in</strong> the open courtyards created by the <strong>condom<strong>in</strong>ium</strong>blocks.22the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


Figure 20. Condom<strong>in</strong>ium Block Typical Floor Plan, SNNPR. MH Eng<strong>in</strong>eer<strong>in</strong>gCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>23


Figure 21. Condom<strong>in</strong>ium Block Elevation, SNNPR. MH Eng<strong>in</strong>eer<strong>in</strong>gAlthough the provision <strong>of</strong> communal units is well<strong>in</strong>tentioned, the post-occupation management <strong>of</strong> thecommunal build<strong>in</strong>gs has proven problematic and thererema<strong>in</strong>s no overall coherent programme approach.Initially, the price <strong>of</strong> the communal build<strong>in</strong>gs was not<strong>in</strong>cluded <strong>in</strong> the unit purchase price, which has createdaccessibility and use problems as will be discussed <strong>in</strong>THE PROVISION OF COMMERCIALUNITS AIMS TO ENSURE MIXED-USEOCCUPATION OF CONDOMINIUMSITES, WHICH HAVE SEVERALBENEFITS OVER PURELY RESIDENTIALDEVELOPMENTS.Part Three. At present, however, the cost <strong>of</strong> communalbuild<strong>in</strong>gs is <strong>in</strong>cluded <strong>in</strong> the unit purchase price, asevidenced <strong>in</strong> Gotera and G<strong>of</strong>a sites. Unfortunately, onsome project sites communal build<strong>in</strong>g provision hasceased <strong>in</strong> an effort to reduce construction costs.Resident demand for communal build<strong>in</strong>gs is high.On sites conta<strong>in</strong><strong>in</strong>g too few communal build<strong>in</strong>gs, theresidents themselves have started to construct them, eventhough this practice is forbidden by the government andit is likely these build<strong>in</strong>gs will eventually be demolished.A number <strong>of</strong> residents’ associations have s<strong>in</strong>ce boughttheir communal build<strong>in</strong>gs from the Government. InArada region alone, 23 communal build<strong>in</strong>gs have beensold to Hous<strong>in</strong>g Associations composed <strong>of</strong> <strong>condom<strong>in</strong>ium</strong>residents.Cost<strong>in</strong>g, quantity survey<strong>in</strong>g and constructionThe programme has tight cost<strong>in</strong>g and quantity survey<strong>in</strong>gmechanisms that aim to m<strong>in</strong>imize constructioncosts. The MWUD are responsible for purchas<strong>in</strong>g allconstruction materials, <strong>in</strong> bulk and therefore at lowprices. Contractors are engaged on fixed-cost contracts,which reduce the burden <strong>of</strong> solicit<strong>in</strong>g for, receiv<strong>in</strong>g, andchoos<strong>in</strong>g tenders for each job. The material requirementsfor each <strong>condom<strong>in</strong>ium</strong> block are calculated and theexact material quantities are given to contractors. Thiscentralized system m<strong>in</strong>imizes wastage, helps to keeprecords for material supplies and distribution, andenables any surplus materials to be used on other sites.These mechanisms give greater certa<strong>in</strong>ty <strong>of</strong> the f<strong>in</strong>al cost<strong>of</strong> construction.Infrastructure provision and servic<strong>in</strong>gThe city adm<strong>in</strong>istration coord<strong>in</strong>ates and f<strong>in</strong>ances theconstruction <strong>of</strong> <strong>in</strong>frastructure and services. Infrastructureelements <strong>in</strong>clude the roads, car parks, footpaths andgrass areas and services are water, electricity, and ma<strong>in</strong>ssewerageconnection for each unit.24the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


Figure 22. Condom<strong>in</strong>ium sites <strong>in</strong>clude commercial units at ground level <strong>in</strong> an effort to create mixed-use environments.Mikililand <strong>condom<strong>in</strong>ium</strong> site, Addis Ababa. © UN-HABITAT / Kather<strong>in</strong>e HegabOn early project sites, for <strong>in</strong>stance Bole Gerji, roads werethe f<strong>in</strong>al element to be built so as to reduce damage tothem by heavy mach<strong>in</strong>ery dur<strong>in</strong>g <strong>condom<strong>in</strong>ium</strong> blockconstruction. However, this created major delays <strong>in</strong>project completion and now <strong>in</strong>frastructure is plannedand implemented much earlier <strong>in</strong> the construction phase,concurrent with <strong>condom<strong>in</strong>ium</strong> block construction.Furthermore, electricity and water companies delayprojects with their disorganisation and limited resourceswhich are unable to deal with the large-scale city-widedemands. One major <strong>in</strong>frastructure challenge fac<strong>in</strong>gthe programme is the <strong>in</strong>adequate and small-scope <strong>of</strong> theAddis Ababa sewerage system. The horizontal expansion<strong>of</strong> Addis Ababa, particularly along the south-west andnorth-east regions <strong>of</strong> the city, has <strong>in</strong>creased the cost <strong>of</strong><strong>in</strong>frastructure provision and services on sites located<strong>in</strong> these locations. These <strong>in</strong>creased costs have placedstra<strong>in</strong> on the f<strong>in</strong>ancial viability <strong>of</strong> these <strong>in</strong>dividual<strong>condom<strong>in</strong>ium</strong> projects.Once the units are occupied residents pay for their waterand electricity services.They enter <strong>in</strong>to a contract with the service providers andshould they fail to keep on top <strong>of</strong> payments water andelectricity can be cut <strong>of</strong>f.The post-occupancy ma<strong>in</strong>tenance <strong>of</strong> private andcommunal areas is the responsibility <strong>of</strong> the residents,THE PROVISION OF COMMUNALBUILDINGS TO CONDOMINIUM SITESWAS AN ATTEMPT TO RESPONDTO THE CULTURAL NEEDS OFRESIDENTS. THE FUNCTION OFTHE COMMUNAL BUILDINGS ISTO PROVIDE A PROTECTED SPACEFOR RESIDENTS TO PERFORMTRADITIONAL TASKS SUCH ASSLAUGHTERING GOATS, HAND-WASHING LAUNDRY, AND COOKINGEXTENSIVE MEALS: ACTIVITIESTHE HOUSING UNITS THEMSELVESCANNOT ACCOMMODATE.who are responsible for ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g service fitt<strong>in</strong>gs(toilets, showers, bas<strong>in</strong>s) with<strong>in</strong> their units. To this end, awritten <strong>in</strong>formation guide has been produced by the cityadm<strong>in</strong>istration department for <strong>condom<strong>in</strong>ium</strong> residentsoutl<strong>in</strong><strong>in</strong>g how to undertake simple ma<strong>in</strong>tenance onfixtures (such as s<strong>in</strong>k dra<strong>in</strong>s) 7 . The government takes noresponsibility for the ma<strong>in</strong>tenance <strong>of</strong> the units once theyare occupied. In some projects, residents contribute a setamount <strong>of</strong> money to a kitty each month to cover the payCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>25


30 per cent <strong>of</strong> units are allocated to women. There are nospecial provisions for the elderly <strong>of</strong> disabled, although iftheir name is drawn <strong>in</strong> the lottery they have first choice <strong>in</strong>choos<strong>in</strong>g a ground floor <strong>condom<strong>in</strong>ium</strong>. Presently, thereis no <strong>in</strong>come verification system <strong>in</strong> place, but lotteryentrants must be able to prove that they have lived <strong>in</strong>Addis for at least 6 months (decreased from the 2 yearperiod <strong>in</strong>itially set) and that they do not presently ownproperty. In 2005, 453,000 applicants registered to beentered <strong>in</strong>to the lottery draw for the chance <strong>of</strong> receiv<strong>in</strong>ga <strong>condom<strong>in</strong>ium</strong> unit.Figure 23. A communal unit <strong>in</strong> Bole Summit, Addis Ababa.© UN-HABITAT/ Kather<strong>in</strong>e Hegab<strong>of</strong> a caretaker but <strong>in</strong> other projects no-one ma<strong>in</strong>ta<strong>in</strong>s thecommunal areas.Target beneficiaries and unit allocationThe different unit sizes were envisaged to suit households<strong>of</strong> differ<strong>in</strong>g <strong>in</strong>come levels. Table 5 outl<strong>in</strong>es the <strong>in</strong>itial (<strong>in</strong>2006) unit costs and target beneficiaries (accord<strong>in</strong>g totheir <strong>in</strong>come). The studio unit was targeted at the lowest<strong>in</strong>come group, with an average monthly <strong>in</strong>come <strong>of</strong> ETB300 (USD 23) (Table 5).Because demand for <strong>hous<strong>in</strong>g</strong> units far exceeds supply,<strong>hous<strong>in</strong>g</strong> units are allocated through a computer-basedlottery system. Lottery registration forms are distributedat public locations with<strong>in</strong> Addis Ababa, HDPO sub<strong>of</strong>fices<strong>in</strong> the sub-cities <strong>of</strong> the capital. Once applicantscollect these forms and fill them out, they return theforms to the HDPO for <strong>in</strong>put <strong>in</strong>to a database specificallydesigned to receive and organise lottery entrants.When register<strong>in</strong>g for the lottery, applicants choose which<strong>condom<strong>in</strong>ium</strong> site, Sub-city and unit type they prefer.The lottery takes place <strong>in</strong> a public meet<strong>in</strong>g spaceand attendance is open to anyone who is <strong>in</strong>terested.Admittance is open and free. First, the 30 per cent quotais drawn for women, then the remand<strong>in</strong>g 70 per cent formen and women together. Extra numbers are drawn tocompose a wait<strong>in</strong>g list, as <strong>in</strong>evitably previously allocatedunits become available because beneficiaries who cannotafford the down-payment drop out.The lottery system was implemented follow<strong>in</strong>g criticism<strong>of</strong> the allocation <strong>of</strong> the first <strong>condom<strong>in</strong>ium</strong> project, <strong>in</strong>which certa<strong>in</strong> groups were seen to be favoured ratherthan the low-<strong>in</strong>come target population. The programmerestricts the resale <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> units, withbeneficiaries not allowed to re-sell their <strong>condom<strong>in</strong>ium</strong>for five years from the date <strong>of</strong> tak<strong>in</strong>g over the property.The programme places special emphasis on m<strong>in</strong>imiz<strong>in</strong>gdisruption to residents affected by <strong>condom<strong>in</strong>ium</strong>development. The programme makes provision forthose who have had to leave their former home for<strong>condom<strong>in</strong>ium</strong> development and there is a dedicated<strong>of</strong>fice <strong>in</strong> the City Adm<strong>in</strong>istration who deals specificallywith relocation. People liv<strong>in</strong>g <strong>in</strong> sites that are tobe re-developed are given the option to acquire a<strong>condom<strong>in</strong>ium</strong> house <strong>in</strong> the same location. They arenot put through the lottery process but get allocated acondo automatically provided they can afford the downpayment. Furthermore, it is written <strong>in</strong> law that thoseTable 5: Unit type and beneficiary <strong>in</strong>come levelUnit typeMonthly <strong>in</strong>come <strong>in</strong> ETB(USD)Average price (m2)<strong>in</strong> ETB (USD)Sell<strong>in</strong>g price<strong>in</strong> ETB (USD)Studio 300 (23) 800 (62) 16,000 (1,230)1 Bedroom 600 (46) 900 (69) 18-27,000 (1,380-2,070)2 Bedroom 1,200 (92) 1,100 (85) 33-50,000 (2,530-16,660)3 bedroom 1,800 (138) 1,200 (92) >50,000 (16,660)Source: Haregewo<strong>in</strong>, Y. (2007) Integrated Hous<strong>in</strong>g Development Programs for Urban Poverty Alleviation and Susta<strong>in</strong>able Development (The Case <strong>of</strong>Addis Ababa). Proceed<strong>in</strong>gs, European Network for Hous<strong>in</strong>g Research 2007: Susta<strong>in</strong>able Urban Areas. Rotterdam, 25-28 June 2007. p.13.26the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


currently liv<strong>in</strong>g <strong>in</strong> an <strong>in</strong>ner-city area will be given a<strong>condom<strong>in</strong>ium</strong> still with<strong>in</strong> the <strong>in</strong>ner-city.2.3 Project DesignHav<strong>in</strong>g outl<strong>in</strong>ed the programme as a whole, this sectionpresents the specific aspects <strong>of</strong> the <strong>in</strong>dividual projects.After giv<strong>in</strong>g an overview <strong>of</strong> the projects undertaken todate, this section demonstrates the process from <strong>in</strong>itialsite selection to occupation for each project.2.3.1 An overview <strong>of</strong> projectsFigure 24 illustrates the national distribution <strong>of</strong> IHDPprojects. By far the majority <strong>of</strong> projects have beenundertaken <strong>in</strong> Addis Ababa. To date there have been atotal <strong>of</strong> 78,000 units built <strong>in</strong> Addis Ababa, located acrossmore than 100 project sites. In Addis Ababa projectsrange <strong>in</strong> size, from small ones <strong>in</strong> the sub-city <strong>of</strong> Akakithat have under 300 units 8 , to the largest one on Jemosite, which is split <strong>in</strong>to three zones, Jemo I, Jemo II andJemo III, with a comb<strong>in</strong>ed total <strong>of</strong> over 10,000 units.The next largest city, Dire Dawa, has only had 2,838units built.The first era <strong>of</strong> the Integrated Hous<strong>in</strong>g DevelopmentProgramme is yet to be f<strong>in</strong>ished - 30,000 <strong>hous<strong>in</strong>g</strong> unitsare still to be transferred and by the end <strong>of</strong> 2010, another30,000 units are <strong>in</strong>tended to be completed. Plans havebeen made to prolong the <strong>condom<strong>in</strong>ium</strong> development<strong>in</strong> Ethiopia for another five years, start<strong>in</strong>g with the newlyselected <strong>condom<strong>in</strong>ium</strong> site <strong>of</strong> Basha Wolde Chilot area<strong>in</strong> Arada District.2.3.2 Project design and implementationEach <strong>condom<strong>in</strong>ium</strong> project follows a similarprocess. A generalised overview <strong>of</strong> project design andimplementation steps for projects <strong>in</strong> Addis Ababa isprovided below. The length <strong>of</strong> time each stage takesvaries greatly across <strong>condom<strong>in</strong>ium</strong> sites.1. Addis Ababa City Adm<strong>in</strong>istration selects andsurveys potential site2. Request for approval put forward to the LandBoard3. Apply for Government bonds from CBE4. HDPO competition released for site masterplan5. Shortlisted entrants develop design6. Presentation <strong>of</strong> designs to stakeholders with aw<strong>in</strong>ner selected7. Design amendments made by HDPO8. Construction contractor vacancies released9. HDPO hires contractors and sub-contractors10. Condom<strong>in</strong>ium construction commences (firstconstruction <strong>of</strong> houses, then <strong>in</strong>frastructure)11. When construction is 80 per cent complete,lottery registration opens12. Lottery draw and results dissem<strong>in</strong>ation13. W<strong>in</strong>ners have one month to claim condo/complete Form 03.14. They then pay down payment to CBE and signGeneral Agreement with HDPO15. General Agreement sent to CBE and LandAuthority16. Construction complete17. Keys given to beneficiaries.Site selectionInitial site <strong>in</strong>vestigations are based on the 1997 AddisAbaba master plan, where potential sites are considered <strong>in</strong>terms <strong>of</strong> provid<strong>in</strong>g suitable sett<strong>in</strong>gs for the construction<strong>of</strong> new build<strong>in</strong>gs and analysis <strong>of</strong> the exist<strong>in</strong>g green- andbrown-field sites. Consultants are hired to conducta series <strong>of</strong> detailed studies on the area <strong>in</strong>clud<strong>in</strong>g thecarry<strong>in</strong>g capacity <strong>of</strong> the site; the local environmentalaspects; the exist<strong>in</strong>g water supply and access roads; anyexist<strong>in</strong>g pollutants and their potential relocation; thecommunity’s desire for <strong>condom<strong>in</strong>ium</strong>s; and the physicaland economic frameworks that exist. Consultants alsolook at the impact a large-scale residential developmentwould have on the exist<strong>in</strong>g social structure <strong>of</strong> the area. Ifthe studies conclude the site is suitable for <strong>condom<strong>in</strong>ium</strong>development, a request is forwarded to the Land Board,headed by the Mayor <strong>of</strong> Addis Ababa, to secure the landfor a <strong>condom<strong>in</strong>ium</strong> project.Despite one <strong>of</strong> the IHDP’s ma<strong>in</strong> objectives be<strong>in</strong>g tocarry out slum upgrad<strong>in</strong>g, so far the implementation<strong>of</strong> the programme <strong>in</strong> Addis Ababa as much as possiblehas been carried out <strong>in</strong> open spaces or on grounds upto-thenreserved for purposes other than <strong>hous<strong>in</strong>g</strong>. Themajor reason for this approach has been to avoid thesocial costs <strong>of</strong> slum clearance <strong>in</strong>flicted on residents.Nonetheless, <strong>in</strong>ner city redevelopment is a necessityand, Bole Summit, near<strong>in</strong>g completion, will be the last<strong>of</strong> the peripheral <strong>condom<strong>in</strong>ium</strong> projects built. One <strong>of</strong>the limits the Government has enforced is to restrictall house-build<strong>in</strong>g under the new policy to with<strong>in</strong> theexist<strong>in</strong>g city boundary. The purpose is to apply compactcity urban plann<strong>in</strong>g to reduce the f<strong>in</strong>ancial stra<strong>in</strong> <strong>of</strong> thebuild<strong>in</strong>g <strong>of</strong> <strong>in</strong>frastructure; and with <strong>in</strong>frastructure costsrema<strong>in</strong><strong>in</strong>g high <strong>in</strong> Addis Ababa, with sewerage systemcurrently only cover<strong>in</strong>g 3 percent <strong>of</strong> the city’s area, thiswould not be someth<strong>in</strong>g to encourage.Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>27


Tigray region: Mekele - 12 towns, 9,624 units, 5,812 transferredAfar region: Semara - 200 unitsAmhara region: Bahrdar - 12 towns, 20,314 units, 5,812 transferredBenshangul gumz region: Asosa - 42 unitsDire Dawa City: 2,838 units, 877 transferredAddis Ababa City: 78,000 units, 53,000 transferredHarari region: Harar - 2,445 units, 1,052 transferredSomali region: Jijga - Plann<strong>in</strong>g stageGambela region: Plann<strong>in</strong>g stageSNNPR: Hawasa - 12 towns, 11,624 units, 3,087 transferredOromiya region: 17 towns, 22,834 units, 5,817 transferredFigure 24: National distribution <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> projects across the n<strong>in</strong>e regional states <strong>of</strong> Ethiopia.Prelim<strong>in</strong>ary site and <strong>hous<strong>in</strong>g</strong> unit designThe HDPO opens a competition to design the masterplan for the site. Although the <strong>hous<strong>in</strong>g</strong> block designsare largely set (<strong>in</strong> terms <strong>of</strong> unit types, number <strong>of</strong> storeys,etc) the competition is for the site design, the layout <strong>of</strong>the blocks, communal build<strong>in</strong>gs, and open spaces onthe site. Entrants are short-listed and then develop thedesign. The schemes are presented to a review group<strong>in</strong>clud<strong>in</strong>g private consultant and government architectsand amendments are made based on their comments.In Addis Ababa f<strong>in</strong>al design changes are made <strong>in</strong> theHDPO, but the organisation <strong>of</strong> the construction processhappens <strong>in</strong> the ten HDPO sub-branches located <strong>in</strong> thesub-cities <strong>of</strong> Addis Ababa.Land clearance, compensation, temporary resettlementOn green- and brown-field sites compensation andresettlement is not an issue. If the proposed developmentsite is occupied by kebele <strong>hous<strong>in</strong>g</strong>, the project aims toundertake wide and open consultation with exist<strong>in</strong>gresidents on plans for <strong>condom<strong>in</strong>ium</strong> development.Households that are to be relocated to make way for<strong>condom<strong>in</strong>ium</strong> development are either:resettled (<strong>in</strong> another kebele), compensated, or they getfirst option for a new <strong>condom<strong>in</strong>ium</strong> unit on this site.If they are to buy a <strong>condom<strong>in</strong>ium</strong> unit on the same sitethey are given temporary accommodation <strong>in</strong> makeshifttimber and iron sheds <strong>in</strong> another location while the<strong>condom<strong>in</strong>ium</strong> blocks are built.Construction contractor engagementIn order to be contracted for work on <strong>condom<strong>in</strong>ium</strong>projects, construction companies must register with theM<strong>in</strong>istry <strong>of</strong> Works and Urban Development. There arecontrols on which companies can work. Constructioncompanies are graded <strong>in</strong> terms <strong>of</strong> their experience: Grade6 is the highest and <strong>in</strong>dicated significant experience. Tosecure a <strong>condom<strong>in</strong>ium</strong> block contract the m<strong>in</strong>imumis Grade 5. The previous requirement that contractorsHOUSEHOLDS THAT ARE TO BERELOCATED TO MAKE WAY FORCONDOMINIUM DEVELOPMENT AREEITHER: RESETTLED (IN ANOTHERKEBELE), COMPENSATED, OR THEYGET FIRST OPTION FOR A NEWCONDOMINIUM UNIT ON THIS SITE.had to have 12 years experience was <strong>in</strong>hibit<strong>in</strong>g and wastherefore reduced to four years. Eng<strong>in</strong>eers need threeyears experience to be contracted for IHDP work.Construction contractors are specifically hired to buildthe structure <strong>of</strong> each block. The task <strong>of</strong> fitt<strong>in</strong>g out thebuild<strong>in</strong>gs, <strong>in</strong>clud<strong>in</strong>g the plumb<strong>in</strong>g and electricity worksand the application <strong>of</strong> f<strong>in</strong>ishes, is given to sub-contractors28the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


Figure 25: Lideta site be<strong>in</strong>g cleared.© UN-HABITAT/ Kather<strong>in</strong>e HegabFigure 26: Construction <strong>of</strong> Bole Summit, Addis Ababa.© UN-HABITAT/ Kather<strong>in</strong>e Hegabconsist<strong>in</strong>g <strong>of</strong> Micro and Small Enterprises (MSE). Thissub-contraction <strong>of</strong> smaller tasks is done <strong>in</strong> an effort toenable the capacity and development <strong>of</strong> MSEs, to keepa tighter control on costs, and <strong>in</strong>crease competition thataims to improve construction quality. Consultants arehired to oversee construction and ma<strong>in</strong>ta<strong>in</strong> constructionquality.The HDPO acts as the project manager <strong>of</strong> each project.It allocates portions <strong>of</strong> each project to <strong>in</strong>dividualcontractors. The selected contractors visit the HDPOto analyse the specifications and decide whether theywill accept the fixed-cost for the job <strong>of</strong>fered to them bythe Government. Once the HDPO and the contractorscome to an agreement on the fixed price <strong>of</strong> the projectand a bill <strong>of</strong> quantities, the contractor’s f<strong>in</strong>al step is toprovide the HDPO with written confirmation <strong>of</strong> theiragreement.Differently graded contractors are allocated theconstruction <strong>of</strong> different percentages <strong>of</strong> the <strong>hous<strong>in</strong>g</strong>blocks on-site. Grade 6 contractors are <strong>of</strong>ten given onlytwo blocks; Grade 5 contractors are given three blocks;and Grade 4 contractors are given four blocks.Construction stageA central feature <strong>of</strong> the projects is the centrally sourcedand distributed build<strong>in</strong>g materials. The M<strong>in</strong>istrypurchases all materials (cement, re<strong>in</strong>forc<strong>in</strong>g bar,electricity and sanitation equipment, etc.) <strong>in</strong> bulk <strong>in</strong> aneffort to reduce the cost and control quality. This meansthat there is less risk for contractors <strong>of</strong> material cost overruns.Construction quality is monitored by consultants,who conduct on-site checks. New contractors can behired if quality levels slacken.Unit allocation and transferWhen construction work is 80 percent complete,registration for the lottery opens and the lottery isconducted, as per the process described above. Resultsare published on the <strong>in</strong>ternet, <strong>in</strong> newspapers and onkebele <strong>in</strong>formation boards.When beneficiaries come forward, they must sign ‘Form03’ at the branch Hous<strong>in</strong>g Transfer and Adm<strong>in</strong>istrationOffice as a form <strong>of</strong> contract with the <strong>of</strong>fice for the firststage <strong>of</strong> the transfer. Depend<strong>in</strong>g on whether or not theydecide to take advantage <strong>of</strong> the bank loan available tothem, they must take this form to the Commercial Bank<strong>of</strong> Ethiopia to make their claim. This form presents thebank with pro<strong>of</strong> that a contract has been made betweenthe beneficiary and the HDPO follow<strong>in</strong>g successfulselection from the lottery, and calls for the family’spayment <strong>of</strong> the 20 percent down-payment. Once paid,the bank issues the family with a receipt which they mustdeliver to the HDPO along with Form 03 to <strong>in</strong>itiate thesign<strong>in</strong>g <strong>of</strong> the title deed.The HDPO presents the General Agreement to thebeneficiary and follow<strong>in</strong>g their sign<strong>in</strong>g <strong>of</strong> this documentit is dispatched to the land adm<strong>in</strong>istration and sent tothe Bank. Beneficiaries must also pay ETB 200 (USD15) for land adm<strong>in</strong>istration charges and a 1.03 per centcharge for stamp tax <strong>of</strong> the total amount <strong>of</strong> their loan.Commercial Bank <strong>of</strong> Ethiopia signs the loan agreementbetween themselves and their customer and this formis sent to the sub-city <strong>of</strong>fice where the house keys canthen be issued. In many cases, residents move <strong>in</strong>to their<strong>condom<strong>in</strong>ium</strong> blocks before construction f<strong>in</strong>ish<strong>in</strong>g workis completed to prevent the theft <strong>of</strong> facilities.Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>29


Box 2: Dallol General ConstructionThe small enterprise <strong>of</strong> Dallol General Constructionwas established <strong>in</strong> 2007, through the government-ledMicro and Small Enterprise Development Programme.Hav<strong>in</strong>g seen an advertisement <strong>in</strong> the local newspaperfor a <strong>condom<strong>in</strong>ium</strong> sub-contractor, and be<strong>in</strong>g granteda loan from the Credit and Sav<strong>in</strong>gs Bank and MicroF<strong>in</strong>ance Institution <strong>of</strong> the Government 9 , the companyapplied to the HDPO for the advertised position. Theywere subsequently contracted to build the externalstaircases <strong>of</strong> all build<strong>in</strong>gs on one a <strong>condom<strong>in</strong>ium</strong> site.Once the company’s capital exceeded the ETB halfmillion(USD 38,400) cap put on the Government’sMSE Development Programme, they found themselves<strong>in</strong> a position to operate on the more competitivemarket <strong>of</strong> the private sector build<strong>in</strong>g <strong>in</strong>dustry withoutthe need for Government support.Box 3: Misrak Chora General ConstructionPost-occupancy stageOnce residents move <strong>in</strong>, the project is deemed complete.As many post-occupancy issues have arisen, however, twowritten guides have been prepared by the HDPO to helpresidents adjust to life <strong>in</strong> <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong>. Thefirst guide is the code <strong>of</strong> conduct; the second outl<strong>in</strong>eshow to carry out basic ma<strong>in</strong>tenance on the units. Apartfrom this, there is no government monitor<strong>in</strong>g andevaluation <strong>of</strong> the projects.Rubbish collection is organized as door to door collection.Pre-collectors are usually youth cooperatives or MSEwhich are paid by the Kebele adm<strong>in</strong>istration. They carrythe rubbish to collection po<strong>in</strong>t <strong>in</strong> the neighborhood,usually big open conta<strong>in</strong>ers. The conta<strong>in</strong>ers are collectedby trucks and transported to the landfill site. The costsare paid by the unit owners together with the waterbill. On some sites, however, rubbish collection has notbeen organized, which creates problems for the ongo<strong>in</strong>ghygiene and appearance <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> sites.Misrak Chora General Construction was anothercompany to have benefited from the MSE scheme.They started <strong>of</strong>f as 12 graduates from the technicaland vocational tra<strong>in</strong><strong>in</strong>g colleges <strong>of</strong> Addis Ababa withthe common goal <strong>of</strong> creat<strong>in</strong>g a successful constructionbus<strong>in</strong>ess. In 2005, the enterprise jo<strong>in</strong>ed the MSEDevelopment Programme and established l<strong>in</strong>ks withthe HDPO and the IHDP. The company was hired topartake <strong>in</strong> a number <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> constructionsites and “as a result, received technical tra<strong>in</strong><strong>in</strong>g andfully-serviced free-land.” 10 The company receivedso much work that they had to employ a further 20full-time staff members and 40 daily labourers andthough they started with only ETB 1,000 (USD 76) to<strong>in</strong>vest <strong>in</strong>to simple tools, they have now accumulateda capital <strong>of</strong> ETB 2 million (USD 153,000) which hasafforded them sophisticated construction mach<strong>in</strong>ery.They also benefited from the Government’s tax-freeallocation <strong>of</strong> imported dump-trucks to strengthen theconstruction <strong>in</strong>dustry by submitt<strong>in</strong>g an application tothe MWUD and receiv<strong>in</strong>g two trucks <strong>in</strong> return. Onedaily labourer work<strong>in</strong>g for Misrak Chora says thatbe<strong>in</strong>g employed has given him the opportunity tomove out and become <strong>in</strong>dependent 11 . This gentlemanearns ETB 19 (USD 1.4) per day work<strong>in</strong>g as a dailylabourer and a small amount by night work<strong>in</strong>g asa security guard so that he may earn his monthlysalary <strong>of</strong> ETB 300 (USD 23). These wages are simplytoo small to create any comfortable lifestyle or roomfor <strong>in</strong>vestment, and demonstrate that there are stillcrucial gaps <strong>in</strong> the employment sector that need to beaddressed.Figure 27: Quality checks on build<strong>in</strong>g materials arecrucial to ensure a high-quality result. Lideta, AddisAbaba. © UN-HABITAT/ Kather<strong>in</strong>e HegabFigure 28: Workman apply<strong>in</strong>g plaster to the first-storey<strong>of</strong> a <strong>condom<strong>in</strong>ium</strong> block. Bole Summit, Addis Ababa.© UN-HABITAT/ Kather<strong>in</strong>e Hegab30the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


2.4 Case studiesTwo case studies are presented here to give a descriptiveoverview <strong>of</strong> how the IHDP projects are implemented.They are from different po<strong>in</strong>ts <strong>in</strong> time and thereforedifferent stages <strong>in</strong> the IHDP: Bole Gerji was a relativelysmall pilot project on a brown-field site and led by GTZand Lideta was an <strong>in</strong>ner-city upgrad<strong>in</strong>g project that wasthe first project to use a ground floor plus seven storeys(G+7) <strong>condom<strong>in</strong>ium</strong> typology.Bole Gerji – the <strong>condom<strong>in</strong>ium</strong> pilot projectBole Gerji <strong>in</strong> Addis Ababa was the first <strong>condom<strong>in</strong>ium</strong>project to be constructed <strong>in</strong> Ethiopia. It was <strong>in</strong>itiated byGTZ and the Addis Ababa City Adm<strong>in</strong>istration <strong>in</strong> 2002,follow<strong>in</strong>g a request from the Mayor. The first masterplan for the design <strong>of</strong> the project was drawn by renownedarchitect Fasil Giorgis and accommodated 750 <strong>hous<strong>in</strong>g</strong>units, composed <strong>of</strong> studios, 1 and 2-bedroom typologies;an <strong>of</strong>fice build<strong>in</strong>g and several commercial units. Thescheme was the first major build<strong>in</strong>g project <strong>in</strong> AddisAbaba to <strong>in</strong>troduce sub-contractors which, <strong>in</strong> turn,avoided the formation <strong>of</strong> stack-pr<strong>of</strong>its. Dur<strong>in</strong>g its launchFigure 29: Lottery w<strong>in</strong>ners are announced around the cityHDPO Headquarters, Addis Ababa. © UN-HABITAT/ Kather<strong>in</strong>e Hegab<strong>in</strong> 2004, GTZ was the manag<strong>in</strong>g agent for the Bole Gerjisite work<strong>in</strong>g on behalf <strong>of</strong> the City Government <strong>in</strong> theirhir<strong>in</strong>g <strong>of</strong> contractors and daily labourers, who weredirectly employed by GTZ.As the project was the first <strong>of</strong> its k<strong>in</strong>d <strong>in</strong> Ethiopia, itreceived considerable support for its constructionand major work was completed <strong>in</strong> a st<strong>in</strong>t <strong>of</strong> eightmonths, although some elements rema<strong>in</strong>ed unf<strong>in</strong>ished.Government agencies had been responsible for thedelivery <strong>of</strong> the water supply and electricity so as to reducecosts further, but these bodies proved to be <strong>in</strong>efficient.External plaster<strong>in</strong>g was not carried out before it was timeFigure 30: Accumulated rubbish adjacent to <strong>condom<strong>in</strong>ium</strong>build<strong>in</strong>gs Mikililand <strong>condom<strong>in</strong>ium</strong> site, Addis Ababa.© UN-HABITAT/ Kather<strong>in</strong>e Hegabfor residents to move <strong>in</strong> and, as a result, the exposedwalls suffered from weather<strong>in</strong>g. Internal walls with<strong>in</strong>each unit rema<strong>in</strong>ed absent <strong>of</strong> plaster to keep costs to am<strong>in</strong>imum, so people undertook the role <strong>of</strong> plaster<strong>in</strong>gthe <strong>in</strong>ternal surfaces themselves. Unfortunately, theyfollowed this by pour<strong>in</strong>g the plaster residue onto theGTZ-landscap<strong>in</strong>g and kill<strong>in</strong>g many <strong>of</strong> the flowers.S<strong>in</strong>ce the <strong>condom<strong>in</strong>ium</strong>s were transferred, they havebeen criticised for their substandard quality and lack <strong>of</strong>synchronisation between separate construction eventsat the time <strong>of</strong> their erection. However, the governmentsay they have learned from their mistakes at Bole Gerjiand amongst their new moves, they have made it arequirement to plaster all houses both <strong>in</strong>ternally andexternally on future project sites. As this was the PilotProject, the lottery draw system <strong>of</strong> <strong>condom<strong>in</strong>ium</strong>allocation had not been established and most units werenot distributed at random; <strong>in</strong>stead they were given toGovernment employees already liv<strong>in</strong>g <strong>in</strong> Gerji, andbus<strong>in</strong>essmen, architects and lawyers.Community groups have been self-formed and betweenthemselves, residents plastered and pa<strong>in</strong>ted theircommunal parts, planted new pockets <strong>of</strong> landscap<strong>in</strong>gand organised the security gate separat<strong>in</strong>g the site fromthe ma<strong>in</strong> road.Lideta – the first <strong>in</strong>ner-city relocation project <strong>in</strong> AddisAbabaOne <strong>of</strong> the challenges faced by the programme regard<strong>in</strong>gthe <strong>in</strong>troduction <strong>of</strong> new <strong>condom<strong>in</strong>ium</strong> developmentsto Addis Ababa has been <strong>in</strong> the scarcity <strong>of</strong> empty land.Once all <strong>of</strong> the Government-owned brown-field sites <strong>in</strong>Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>31


the <strong>in</strong>ner city were developed and the periphery <strong>of</strong> thecapital had been exploited, the city government decidedto focus their efforts on the exist<strong>in</strong>g city <strong>of</strong> Addis Ababa.They began a dialogue to redevelop pockets <strong>of</strong> the city’s<strong>in</strong>formal settlements and the Lideta area is the first <strong>of</strong> fiveoccupied sites to be re-developed by the programme. Itis, therefore, a pilot project for <strong>in</strong>ner city redevelopmentbased on the resettlement <strong>of</strong> a significant proportion <strong>of</strong>the population. Like much <strong>of</strong> the city, Lideta did notconta<strong>in</strong> any formal sewage system or latr<strong>in</strong>es as it wasprimarily an unplanned, densely populated settlement.The 26 hectare site <strong>of</strong> Lideta conta<strong>in</strong>ed 1,070 exist<strong>in</strong>ghouseholds and up to 6,000 people liv<strong>in</strong>g with<strong>in</strong> them.Between them, these families <strong>in</strong>habited 932 Kebelehouses, 323 privately-owned houses and 55 <strong>hous<strong>in</strong>g</strong>adm<strong>in</strong>istration houses. There were also 11 exist<strong>in</strong>ggovernment and religious build<strong>in</strong>gs on site, <strong>in</strong>clud<strong>in</strong>g aprotestant church, which had to be relocated, althoughit was possible to ma<strong>in</strong>ta<strong>in</strong> Lideta School on-site. Onsuch a central site as Lideta it was deemed importantto maximize the value <strong>of</strong> the land and therefore<strong>condom<strong>in</strong>ium</strong> blocks had to be at least 7-storeys high.The Local Development Plan for Lideta was launched on6 May 2009 and proposed the follow<strong>in</strong>g site allocation:1 ha <strong>of</strong> land was specifically allocated to green space forresidents; 2 ha <strong>of</strong> land were assigned for social services;3 ha <strong>of</strong> land were provided for allocation to privatehomeowners whose houses had to be demolished; anarea <strong>of</strong> 5 ha was designated to multi-use facilities; 2 hawere designated to the build<strong>in</strong>g <strong>of</strong> <strong>in</strong>frastructure; 4 hawere set aside for commercial purposes; and 8 ha wereallocated to <strong>condom<strong>in</strong>ium</strong> development.An assembly took place <strong>in</strong> March 2009, to give thegovernment the opportunity to meet the community <strong>of</strong>Lideta and <strong>in</strong>form them <strong>of</strong> their plans to redevelop thesite, expla<strong>in</strong><strong>in</strong>g what was go<strong>in</strong>g to happen and how itwas go<strong>in</strong>g to be achieved. They also used the occasionto ask current residents to leave their homes <strong>in</strong> Lideta<strong>in</strong> exchange for a government-provided residence orplot <strong>of</strong> land elsewhere. Lideta residents <strong>in</strong>terviewed byUN-HABITAT said that government representativescarried out five rounds <strong>of</strong> consultations with residents<strong>of</strong> Lideta over a period <strong>of</strong> four months to overcomeresistance to their plans, although accord<strong>in</strong>g to StateM<strong>in</strong>ister Arkebe, the consultation process betweenLideta residents and Government representatives tookalmost two years to conv<strong>in</strong>ce those liv<strong>in</strong>g on-site <strong>of</strong>the benefits that were to come. He declared that “noupgrad<strong>in</strong>g programme can be done without the consensus <strong>of</strong>the community. Participation <strong>of</strong> the community should bethe basis <strong>of</strong> slum upgrad<strong>in</strong>g.”To ga<strong>in</strong> the support <strong>of</strong> the exist<strong>in</strong>g community, the cityadm<strong>in</strong>istration had to propose a number <strong>of</strong> <strong>in</strong>centiveswhich they presented to residents:Option A: Kebele tenants receive <strong>condom<strong>in</strong>ium</strong> units <strong>in</strong>Lideta or elsewhereThose liv<strong>in</strong>g <strong>in</strong> Kebele <strong>hous<strong>in</strong>g</strong> were <strong>of</strong>fered a new<strong>condom<strong>in</strong>ium</strong> by the government if they could affordthe 20 percent down-payment. 47 percent <strong>of</strong> Kebeleoccupants made the choice to be relocated to a twobedroom<strong>condom<strong>in</strong>ium</strong> elsewhere despite the strugglethey anticipated <strong>in</strong> afford<strong>in</strong>g their monthly payments. Tohelp these families with their potential f<strong>in</strong>ancial burden,the government gave Kebele residents the opportunity topay the 20 percent down payment <strong>in</strong> three stages.Moreover, the Government approached an NGOcalled the Network <strong>of</strong> Ethiopian Women’s Associationto request the provision <strong>of</strong> some form <strong>of</strong> f<strong>in</strong>ancialsupport for 200 women-headed-households <strong>of</strong> Lidetawho could not afford to pay the down-payment for a<strong>condom<strong>in</strong>ium</strong>. Through fundrais<strong>in</strong>g, the NGO securedETB 800,000 (USD 61,500) for the 200 women, whereETB 300,000 (USD 23,000) was used for the downpayment<strong>of</strong> studios for each woman and the rema<strong>in</strong><strong>in</strong>gETB 500,000 (USD 38,500) was used as a start-upcapital to help the women set up their own bus<strong>in</strong>essesand small-scale enterprises. The women were giventra<strong>in</strong><strong>in</strong>g <strong>in</strong> skills they could use to ga<strong>in</strong> employment <strong>in</strong>the future, such as brick-mak<strong>in</strong>g and bread-mak<strong>in</strong>g, andthe products manufactured from this tra<strong>in</strong><strong>in</strong>g were soldback to the construction companies work<strong>in</strong>g on Lidetato generate money to pay back to the NGO for the loan.The women were also organised <strong>in</strong>to a cooperative toensure the fair distribution <strong>of</strong> funds between themselves.This has been the only <strong>in</strong>tervention by an NGO so farfor Lideta.The city government also agreed to pay one year’s rentfor each household that agreed to temporarily moveoutside <strong>of</strong> Lideta, dur<strong>in</strong>g the construction <strong>of</strong> Lideta’s<strong>condom<strong>in</strong>ium</strong>s, as there would be a <strong>condom<strong>in</strong>ium</strong>property available <strong>in</strong> Lideta for each <strong>of</strong> these householdsthereafter. Accord<strong>in</strong>g to Mr. Tsegaye, “it is written <strong>in</strong>law that those currently liv<strong>in</strong>g <strong>in</strong> <strong>in</strong>ner city areas will begiven a <strong>condom<strong>in</strong>ium</strong> still with<strong>in</strong> the city,” should theybe asked to move for <strong>condom<strong>in</strong>ium</strong> development.In fact, out <strong>of</strong> the 650 households who were happy toaccept <strong>condom<strong>in</strong>ium</strong> units elsewhere, only 11 havechosen to move back to Lideta, once construction iscompleted.32the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


Option B: Kebele tenants are allocated other Kebele unitswith<strong>in</strong> the same district420 households could not afford to purchase a<strong>condom<strong>in</strong>ium</strong> unit and have chosen to accept anotherKebele house with<strong>in</strong> the same district. The vacantKebeles <strong>of</strong>fered to such families are assessed <strong>in</strong> advanceby a technical committee with<strong>in</strong> the HDPO to decidewhether or not they are <strong>in</strong> habitable condition. If theyare not, they will not be selected for the resettlement <strong>of</strong>households displaced by <strong>condom<strong>in</strong>ium</strong> construction.However, if they are, the houses are registered andreported back to the Kebele Adm<strong>in</strong>istration so thatthey can be allocated to affected households. A separatelottery draw takes places for the households opt<strong>in</strong>g to bere-housed to another Kebele. If selected, a household can<strong>in</strong>spect the condition <strong>of</strong> the Kebele house and depend<strong>in</strong>gon its condition, can claim for refurbishment expenses orwait for another kebele unit to become available shouldthey decide that it is not <strong>in</strong> an adequate condition. Ifthey are happy with the conditions <strong>of</strong> their new Kebele,the head <strong>of</strong> household signs a rental agreement with theKebele Adm<strong>in</strong>istration.Option C: Owners <strong>of</strong> private houses receive compensationand an alternative plotFor households liv<strong>in</strong>g <strong>in</strong> privately-owned houses,the Adm<strong>in</strong>istration <strong>of</strong>fered to pay compensationequivalent to the value <strong>of</strong> their residence at the time <strong>of</strong>its construction. Residents are also given the option toaccess a free plot <strong>of</strong> land equal to the size they occupied<strong>in</strong> Lideta <strong>in</strong> an area with<strong>in</strong> Nefas Silk, Lafto, AkakiKality, Bole or Kolfe.Beneficiary representatives drafted a Memorandum<strong>of</strong> Understand<strong>in</strong>g with the Adm<strong>in</strong>istration and onceapproved by both parties, it was signed to commenceLideta’s renewal, start<strong>in</strong>g with a 45-day w<strong>in</strong>dow <strong>in</strong> whichresidents had to leave their homes.With<strong>in</strong> this period, residents filled <strong>in</strong> a series <strong>of</strong> forms to<strong>in</strong>dicate their preference regard<strong>in</strong>g their compensation,whether it be <strong>in</strong> the form <strong>of</strong> a new <strong>condom<strong>in</strong>ium</strong> or theallocation <strong>of</strong> a plot <strong>of</strong> land with compensation.A total <strong>of</strong> 780 households from Lideta moved to Goterasite and G<strong>of</strong>a and many others moved to the new subcity<strong>of</strong> Nefas Silk.The new scheme for Lideta is a mixed-use residentialdevelopment. It encompasses 25 per cent <strong>of</strong> land forprivate <strong>in</strong>vestors, which has been sold through the landleaseauction at prices that will further subsidise theaffordable <strong>hous<strong>in</strong>g</strong> on-site: Awash <strong>International</strong> Bankwill lease 2,800m 2 <strong>of</strong> land; Dashen Bank will lease2,696m 2 ; Zefran Plc will lease 987m 2 ; and Dure AbbasMohammed Plc will lease 149m 2 <strong>of</strong> land. The fifth leaseholder, who has been kept anonymous, is to occupy2,333m 2 <strong>of</strong> land with a 4-star hotel. All companies havebeen given the m<strong>in</strong>imum requirement to build structures<strong>of</strong> at least 4-storeys.The proposal for Lideta, designed by private architecturefirm TELDA Consult Plc, <strong>in</strong>corporates <strong>condom<strong>in</strong>ium</strong><strong>hous<strong>in</strong>g</strong> blocks <strong>of</strong> between four and n<strong>in</strong>e storeys; solarpanels; lifts; playgrounds and a number <strong>of</strong> green spaces.A total <strong>of</strong> ETB 236 million (USD 18 million) has beenput towards the development <strong>of</strong> Lideta and new residentsThe problem with the current federal law for homeownersdisplaced by <strong>condom<strong>in</strong>ium</strong> projects lies <strong>in</strong> the decisionas to whether or not they own the property <strong>in</strong> whichthey are liv<strong>in</strong>g. The majority <strong>of</strong> <strong>hous<strong>in</strong>g</strong> <strong>in</strong> Addis Ababadoes not have a title deed as the plot size <strong>of</strong> 50 percent <strong>of</strong>privately-owned houses is below 75m². The government<strong>of</strong>fered these households a new plot <strong>of</strong> land greater than75m² to enable them to obta<strong>in</strong> a title deed and ga<strong>in</strong> legalownership <strong>of</strong> their land. 44 privately-owned householdsopted for a <strong>condom<strong>in</strong>ium</strong> rather than tak<strong>in</strong>g the plot <strong>of</strong>land.The relocation/resettlement process and the new scheme forLidetaThe five consultation meet<strong>in</strong>gs between residents <strong>of</strong>Lideta and the Kebele Adm<strong>in</strong>istration were attended byalmost all Kebele residents, and dur<strong>in</strong>g each meet<strong>in</strong>g theAdm<strong>in</strong>istration called out the names <strong>of</strong> more than 400residents who had been drawn from Lideta’s own <strong>hous<strong>in</strong>g</strong>lottery to receive the next set <strong>of</strong> available <strong>condom<strong>in</strong>ium</strong>s.Figure 31: Labourers build<strong>in</strong>g the foundations forLideta <strong>condom<strong>in</strong>ium</strong>s Lideta, Addis Ababa.© UN-HABITAT/ Kather<strong>in</strong>e HegabCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>33


will be able to avail <strong>of</strong> a newly built CBE branch, <strong>in</strong> closeproximity to the site so as to make beneficiaries’ monthlypayments easier to carry out on time.Critical reflection on the relocation/resettlement processAlthough the government has committed to an approachto urban renewal that is pro-poor, the views <strong>of</strong> manyaffected residents and other stakeholders UN-HABITATspoke with raise the question <strong>of</strong> whether due processwas exercised dur<strong>in</strong>g the eviction procedure. The mostfrequent compla<strong>in</strong>t from Lideta residents is that theyhave not been <strong>of</strong>fered adequate compensation and werenot given adequate time to move.A closer look reveals that despite the government’s effortsto <strong>in</strong>clude consultation and compensation <strong>in</strong> the slumclearance and resettlement process <strong>in</strong> Lideta, there hasbeen criticism from various stakeholders. Some considerthe approach to be a ‘forced eviction’ and recommendthat certa<strong>in</strong> components <strong>of</strong> the process have to besignificantly improved so that it follows due process<strong>in</strong> l<strong>in</strong>e with <strong>in</strong>ternational human rights standards <strong>in</strong>general and guidel<strong>in</strong>es for eviction and developmentdrivendisplacement <strong>in</strong> particular.Eviction notice: Relocated residents share a commonfeel<strong>in</strong>g that adequate and reasonable eviction notice wasnot given to them. Accord<strong>in</strong>g to one lawyer <strong>in</strong>terviewedby Addis Fortune Magaz<strong>in</strong>e, the 45-day advance notice“contradicts the Ethiopian expropriation law… Theowner <strong>of</strong> an immovable property should be given noticeconcern<strong>in</strong>g the expropriation <strong>of</strong> his/her house 90 days<strong>in</strong> advance…I don’t see the legitimacy <strong>in</strong> deliver<strong>in</strong>g thenotice just 45 days <strong>in</strong> advance.” One family was givena longer period <strong>of</strong> time with<strong>in</strong> which to organise theirdeparture as their new <strong>condom<strong>in</strong>ium</strong> was delayed bya year <strong>in</strong> its construction. However, when the familydelayed their move even further due to <strong>in</strong>completef<strong>in</strong>ishes <strong>of</strong> their new home, the government tookmeasures to force them from Lideta by stopp<strong>in</strong>g theirelectricity and water supply and giv<strong>in</strong>g them a warn<strong>in</strong>gafter a period <strong>of</strong> a further 45 days.Consultation: Residents claim that, follow<strong>in</strong>g the firstassembly, no other consultation meet<strong>in</strong>g took place.Presence <strong>of</strong> government <strong>of</strong>ficials or their representatives:Residents compla<strong>in</strong> that no government representativesvisited the site at the time <strong>of</strong> their relocation.Provision <strong>of</strong> legal aid to persons who are <strong>in</strong> need <strong>of</strong> it toseek redress from the courts: Residents report that theywere not given legal aid despite their concern that it wasneeded.Compensation: A total <strong>of</strong> ETB 88 million (USD 6.7million) has been distributed amongst approximately300 private homeowners as compensation, but a number<strong>of</strong> residents rema<strong>in</strong> unhappy with the amount they havebeen given. This is because the compensation onlycovers the value <strong>of</strong> the house at the time <strong>of</strong> constructionand only acknowledges the ro<strong>of</strong><strong>in</strong>g, walls and otherpermanent build<strong>in</strong>g <strong>in</strong>stallations. It does not considerthe <strong>in</strong>vestment occupants have put <strong>in</strong>to the <strong>in</strong>ternaldecoration <strong>of</strong> their houses or the land on which it sits.The compensation has certa<strong>in</strong>ly not been sufficient tobuild a comparable house <strong>in</strong> another location.Assistance for physical relocation: Relocated householdscompla<strong>in</strong>ed that they have not found relocation easy.They had been promised support by the government <strong>in</strong>mov<strong>in</strong>g their belong<strong>in</strong>gs from one site to the next butwere not given it.Through its accession to the <strong>International</strong> Covenant onEconomic, Social and Cultural Rights (ICESCR) on 11Jun 1993, Ethiopia has the obligation to prevent forcedevictions and, <strong>in</strong> the exceptional cases where they arejustified, to follow the procedural protection and dueprocess prescribed by the Committee on Economic,Social and Cultural Rights. For the <strong>in</strong>ternationallyadopted def<strong>in</strong>ition <strong>of</strong> ‘forced eviction’ and the prescribedprocedural protection and due process <strong>in</strong> eviction cases,see Box 4.34the <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> programme <strong>in</strong> <strong>ethiopia</strong>


Box 4: Forced eviction and the prescribed procedural protection and due processUnder <strong>in</strong>ternational law, forced eviction is def<strong>in</strong>ed by the Committee on Economic, Social and Cultural Rights <strong>in</strong> itsGeneral Comment 7 - The right to adequate <strong>hous<strong>in</strong>g</strong> (Art.11.1): forced evictions 12 , as “the permanent or temporaryremoval aga<strong>in</strong>st their will <strong>of</strong> <strong>in</strong>dividuals, families and/communities from the home and/or the land they occupy,without the provision <strong>of</strong>, and access to, appropriate form <strong>of</strong> legal or other protection. The prohibition on forcedevictions does not, however, apply to evictions carried out by force <strong>in</strong> accordance with the law and <strong>in</strong> conformity withthe provisions <strong>of</strong> the <strong>International</strong> Covenants on Human Rights”.In exceptional cases where eviction is considered to be justified, it should be carried out <strong>in</strong> strict compliance with therelevant provisions <strong>of</strong> <strong>in</strong>ternational human rights law and <strong>in</strong> accordance with general pr<strong>in</strong>ciples <strong>of</strong> reasonablenessand proportionality. Appropriate procedural protection and due process which should be applied <strong>in</strong> relation to forcedevictions <strong>in</strong>clude:(a) an opportunity for genu<strong>in</strong>e consultation with those affected;(b) adequate and reasonable notice for all affected persons prior to the scheduled date <strong>of</strong> eviction;(c) <strong>in</strong>formation on the proposed evictions, and, where applicable, on the alternative purpose for which the land or<strong>hous<strong>in</strong>g</strong> is to be used, to be made available <strong>in</strong> reasonable time to all those affected;(d) especially where groups <strong>of</strong> people are <strong>in</strong>volved, government <strong>of</strong>ficials or their representatives to be present dur<strong>in</strong>gan eviction;(e) all persons carry<strong>in</strong>g out the eviction to be properly identified;(f) evictions not to take place <strong>in</strong> particularly bad weather or at night unless the affected persons consent otherwise;(g) provision <strong>of</strong> legal remedies; and(h) provision, where possible, <strong>of</strong> legal aid to persons who are <strong>in</strong> need <strong>of</strong> it to seek redress from the courts.Evictions should not result <strong>in</strong> <strong>in</strong>dividuals be<strong>in</strong>g rendered homeless or vulnerable to the violation <strong>of</strong> other human rights.Where those affected are unable to provide for themselves, the State party must take all appropriate measures, to themaximum <strong>of</strong> its available resources, to ensure that adequate alternative <strong>hous<strong>in</strong>g</strong>, resettlement or access to productiveland, as the case may be, is available. All the <strong>in</strong>dividuals concerned have a right to adequate compensation for anyproperty, both personal and real, which is affected.More detailed guidance on displacement is provided <strong>in</strong> the “Basic Pr<strong>in</strong>ciples and Guidel<strong>in</strong>es on Development-BasedEvictions and Displacement”, developed by the Special Rapporteur on adequate <strong>hous<strong>in</strong>g</strong> as a component <strong>of</strong> the rightto an adequate standard <strong>of</strong> liv<strong>in</strong>g. 13 The document is available at: http://www2.ohchr.org/english/issues/<strong>hous<strong>in</strong>g</strong>/docs/guidel<strong>in</strong>es_en.pdfCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>35


36Figure 32: The latest <strong>condom<strong>in</strong>ium</strong> project under construction and the last one to bebuilt on the edge <strong>of</strong> the city: Bole Summit, Addis Ababa. © UN-HABITAT / Kather<strong>in</strong>e Hegab


ProgrammePerformance3.1 Anticipated results andachievementsThere are three ma<strong>in</strong> areas that the programme aimedto address and <strong>in</strong> which achievements have been made:(i) the programme has made a positive impact on thecountry; (ii) it is <strong>of</strong> a large scale and produces units atvery low cost; and (iii) achieves a physical improvement<strong>in</strong> the <strong>hous<strong>in</strong>g</strong> and urban environment.3Impact on countryThe IHDP has had a major positive impact on thecapacity <strong>of</strong> the follow<strong>in</strong>g four sectors <strong>of</strong> the country:construction, skilled-labour, the manufactur<strong>in</strong>g <strong>in</strong>dustry,and transportation.Despite produc<strong>in</strong>g only half the target number <strong>of</strong>affordable <strong>hous<strong>in</strong>g</strong> units <strong>in</strong> Ethiopia, EthiopianGovernment <strong>of</strong>ficials suggest that the programme hascontributed to a GDP growth rate <strong>of</strong> 11.5 per cent. Ithas created 176,000 new jobs and significantly <strong>in</strong>creasedthe technical capacity <strong>of</strong> the construction sector. Aswell, the quantity and capacity <strong>of</strong> micro- and smallenterpriseshas <strong>in</strong>creased produc<strong>in</strong>g direct employmentand economic benefits at ground-level.Follow<strong>in</strong>g its implementation <strong>in</strong> Addis Ababa, there havebeen a number <strong>of</strong> important results for city dwellers: thecost <strong>of</strong> rent for a dwell<strong>in</strong>g has nationally decreased; the<strong>hous<strong>in</strong>g</strong> shortage has been stemmed; the provision <strong>of</strong>public services for citizens has <strong>in</strong>creased and greater jobopportunities are available to the youth <strong>of</strong> Addis Ababa.chapter threePROGRAMME PERFOMANCEContents3.1 Anticipated results andachievements3.2 Unanticipated results andachievements3.3 Unanticipated challengesfac<strong>in</strong>g the programmeLarge scale and low costA significant number <strong>of</strong> units have been built: 171,000thousand units, represent<strong>in</strong>g 2,850 units per month,12 units per work<strong>in</strong>g hour. In many countries thiswould be a significant achievement, but it is especiallysignificant for Ethiopia consider<strong>in</strong>g the relatively youngconstruction and f<strong>in</strong>ancial sectors and previously lowcapacity to deliver <strong>hous<strong>in</strong>g</strong> at such a large scale asoutl<strong>in</strong>ed <strong>in</strong> Part One.The programme has achieved its goal <strong>of</strong> deliver<strong>in</strong>g<strong>hous<strong>in</strong>g</strong> at low cost. In fact, the costs are extremely low,with units cost<strong>in</strong>g around ETB 1,000 (USD 77) perm 2 , whereas if private contractors constructed them onthe free market they would cost ETB 2,500 (USD 193)per m 2 1 .Condom<strong>in</strong>ium Hous<strong>in</strong>g programme: <strong>ethiopia</strong> 37


THERE ARE THREE MAIN AREASIN WHICH ACHIEVEMENTS HAVEBEEN MADE: (I) THE PROGRAMMEHAS MADE A POSITIVE ECONOMICIMPACT ON THE COUNTRY; (II)IT IS OF A LARGE SCALE ANDPRODUCES UNITS AT A LOW COST;AND (III) ACHIEVES A PHYSICALIMPROVEMENT IN THE HOUSINGAND URBAN ENVIRONMENT.demand is composed <strong>of</strong> effective demand by those whohave the required down-payment and ability to servicethe monthly mortgage, and ‘aspiration’ demand by thosewho want to own a unit but do not have sav<strong>in</strong>gs to meetthe down-payment.The demand results from attractiveness <strong>of</strong> the<strong>condom<strong>in</strong>ium</strong> units to low- and middle-<strong>in</strong>comeEthiopians, predom<strong>in</strong>antly those liv<strong>in</strong>g <strong>in</strong> Addis Ababa,s<strong>in</strong>ce unit ownership <strong>of</strong>fers the opportunity to notonly improve one’s <strong>hous<strong>in</strong>g</strong> conditions but also to takeadvantage <strong>of</strong> the wealth generation opportunity whichow<strong>in</strong>g a unit provides, with the unit be<strong>in</strong>g an extremelysecure private asset.Urban and <strong>hous<strong>in</strong>g</strong> developmentThe programme has achieved several <strong>hous<strong>in</strong>g</strong> and urbandevelopment aims. Residents that have moved <strong>in</strong>to<strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> have a greatly improved physicalenvironment compared with their previous <strong>hous<strong>in</strong>g</strong>.All units have basic services and <strong>in</strong>frastructure and unitowners have security <strong>of</strong> tenure.Inner city <strong>condom<strong>in</strong>ium</strong> projects, for <strong>in</strong>stance Lideta,are aimed at achiev<strong>in</strong>g the urban development goals <strong>of</strong>compact urban growth, densification <strong>of</strong> economicallyvaluable urban land, and regenerat<strong>in</strong>g deteriorated areas<strong>of</strong> Addis Ababa.3.2 Unanticipated results andachievementsIn addition to the aforementioned anticipatedachievements, the programme has achievements that werenot anticipated yet contribute to its accomplishments.There are three ma<strong>in</strong> unexpected achievements: (i) highdemand and support for the programme; (ii) the creation<strong>of</strong> many low-<strong>in</strong>come landlords; and (iii) positive changesto the rental <strong>hous<strong>in</strong>g</strong> market.High demand and support for the programmeUpon launch<strong>in</strong>g the programme the governmentwas confronted with extremely high demand for<strong>hous<strong>in</strong>g</strong> units, which they did not anticipate. Whenthe government first <strong>of</strong>fered units <strong>in</strong> 2004,around450,000 people registered <strong>in</strong> the hope <strong>of</strong> secur<strong>in</strong>g a<strong>condom<strong>in</strong>ium</strong> unit. The high demand has cont<strong>in</strong>uedthroughout the programmes’ five year life so far. TheLow-<strong>in</strong>come landlordsAn anticipated beneficial outcome <strong>of</strong> <strong>condom<strong>in</strong>ium</strong><strong>hous<strong>in</strong>g</strong> is that it creates homeowners. A parallelunanticipated outcome is that many unit owners havebecome landlords s<strong>in</strong>ce they move out <strong>of</strong> their unit andrent it to another household. Unit owners that are unableto service the required monthly mortgage repaymentshave chosen to privately rent out their unit, ratherthan risk loos<strong>in</strong>g it through foreclosure by the bank. Ashouseholds cannot legally sell their unit for five yearsfrom the date <strong>of</strong> purchase, rent<strong>in</strong>g is an attractive option.Ironically, most <strong>condom<strong>in</strong>ium</strong> unit landlords are thevery low-<strong>in</strong>come households and many <strong>of</strong> these landlordswere previously unemployed. There are no legal or localcommunity adm<strong>in</strong>istration restrictions on this strategyand no checks made on unit occupation. It is f<strong>in</strong>anciallyadvantageous for unit owners to rent out their property,with rental charges more than cover<strong>in</strong>g the mortgagerepayments.The government appears to support <strong>condom<strong>in</strong>ium</strong>homeownership becom<strong>in</strong>g a tool by which beneficiariescan generate substantial <strong>in</strong>come through rent<strong>in</strong>g outtheir <strong>condom<strong>in</strong>ium</strong>, mov<strong>in</strong>g <strong>in</strong>to a cheaper rental placeand us<strong>in</strong>g the access rental <strong>in</strong>come for <strong>in</strong>come-generat<strong>in</strong>gor other productive activities. Thus, <strong>condom<strong>in</strong>ium</strong>ownership has turned <strong>in</strong>to an effective poverty reductionstrategy. While exact figures are not available, recentGovernment estimates suggest that <strong>in</strong> total up to 70percent <strong>of</strong> homeowners rent out their <strong>condom<strong>in</strong>ium</strong>(either the whole unit or a part <strong>of</strong> their unit <strong>in</strong> whichthey cont<strong>in</strong>ue to occupy) to <strong>in</strong>crease their <strong>in</strong>come toease the struggle <strong>of</strong> pay<strong>in</strong>g back their bank loan, and/orreceive a regular <strong>in</strong>come.38PROGRAMME PERFOMANCE


Figure 33: View from a communal corridor, Bole Gerji, Addis Ababa.Land and rental <strong>hous<strong>in</strong>g</strong> marketAs a result <strong>of</strong> the above mentioned practice, a significantsupply <strong>of</strong> rental property has been <strong>in</strong>troduced <strong>in</strong> AddisAbaba that has <strong>in</strong> turn reduced the city’s market rentlevel. This has made rental options more affordable forall <strong>in</strong>come sectors.The programme has reduced the number <strong>of</strong> cases <strong>of</strong>illegal development on land <strong>in</strong> Addis Ababa and hascontributed to progress towards an improved <strong>hous<strong>in</strong>g</strong>market by legalis<strong>in</strong>g more <strong>of</strong> the <strong>hous<strong>in</strong>g</strong> supplyand <strong>in</strong>creas<strong>in</strong>g the number <strong>of</strong> <strong>of</strong>ficial property titles<strong>in</strong> circulation (<strong>in</strong> contrast to <strong>in</strong>formal urbanisationprocesses). The <strong>hous<strong>in</strong>g</strong> market was known for be<strong>in</strong>g“generally <strong>in</strong>efficient” 2 and characterised by hightransaction costs, fragmentation, and imperfect<strong>in</strong>formation on market properties. Despite there be<strong>in</strong>g afive-year restriction on the re-sell<strong>in</strong>g <strong>of</strong> a <strong>condom<strong>in</strong>ium</strong>,f<strong>in</strong>d<strong>in</strong>gs have shown that there are a number <strong>of</strong> <strong>in</strong>formalestate agents who facilitate the sell<strong>in</strong>g <strong>of</strong> <strong>condom<strong>in</strong>ium</strong>sprior to that 5-year limitation period.3.3 Unanticipated challengesfac<strong>in</strong>g the programmeIn many respects the programme is extremely successfulyet it faces five ma<strong>in</strong> challenges that need to beacknowledged and addressed. The first two concernbeneficiary and programme f<strong>in</strong>ance: the affordability <strong>of</strong>THE PROGRAMME HAS THREE MAINUNEXPECTED ACHIEVEMENTS:(I) HIGH DEMAND AND SUPPORTFOR THE PROGRAMME; (II) THECREATION OF MANY LOW-INCOMELANDLORDS; AND (III) POSITIVECHANGES TO THE RENTAL HOUSINGMARKET.units for low-<strong>in</strong>come households and the unsusta<strong>in</strong>ablef<strong>in</strong>anc<strong>in</strong>g <strong>of</strong> the programme as a whole. The other threechallenges are beneficiary consultation and management,project specific issues (location, built environmentdesign, and construction quality), and the lack <strong>of</strong> postoccupancymanagement, monitor<strong>in</strong>g and evaluation.If left unaddressed, these unanticipated challenges willjeopardize the long-term success <strong>of</strong> the programmeCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>39


and its ability to achieve its aims <strong>of</strong> slum reduction andprevention, economic growth, and improvement <strong>in</strong> theliv<strong>in</strong>g conditions <strong>of</strong> the low-<strong>in</strong>come population.AffordabilityWhile the IHDP has the laudable aim <strong>of</strong> target<strong>in</strong>g thelow-<strong>in</strong>come sector <strong>of</strong> the population, unfortunatelyexperience has shown that the ‘poorest <strong>of</strong> the poor’ arenot benefit<strong>in</strong>g from the IHDP due to <strong>in</strong>ability to affordthe <strong>in</strong>itial down-payment and monthly service payments.The ‘poorest <strong>of</strong> the poor’ are primarily excluded fromsecur<strong>in</strong>g a unit because they do not have the f<strong>in</strong>ancialcapacity to pay the required down-payment. EvenWHILST THE IHDP HAS THELAUDABLE AIM OF TARGETINGTHE LOW-INCOME SECTOR OF THEPOPULATION, UNFORTUNATELYEXPERIENCE HAS SHOWN THAT THE‘POOREST OF THE POOR’ ARE NOTBENEFITING FROM THE IHDP DUE TOINABILITY TO AFFORD THE INITIALDOWN-PAYMENT.if they manage to pool resources between familyand friends to meet the down-payment (a commonapproach), if they choose to live <strong>in</strong> their unit servic<strong>in</strong>gthe monthly mortgage is difficult if not impossiblebecause the majority have no stable formal employmentor <strong>in</strong>come source. Furthermore, <strong>in</strong> addition to mortgagerepayments, monthly service charges such as electricitymust be paid, plac<strong>in</strong>g extra f<strong>in</strong>ancial stra<strong>in</strong> on alreadyeconomically challenged households. For the ‘poorest<strong>of</strong> the poor’ the <strong>in</strong>crease <strong>in</strong> monthly expenditure issignificant consider<strong>in</strong>g the low rent and service chargespaid <strong>in</strong> previous Kebele <strong>hous<strong>in</strong>g</strong>. As noted above, tocope with this economic pressure many householdsmove out from their units and rent them out to middle<strong>in</strong>comepeople who can afford the monthly expenses.Alternatively, groups that have pooled resources to securea unit live <strong>in</strong> the unit together, result<strong>in</strong>g <strong>in</strong> overcrowd<strong>in</strong>gthat places additional stra<strong>in</strong> on households, communalareas, and <strong>in</strong>frastructure and services.The <strong>in</strong>clusion <strong>of</strong> four unit typologies was made <strong>in</strong> aneffort to address affordability but this approach wronglyassumed that unit size would relate to economiccapability; that is, the smaller and therefore cheaper unitswould be occupied by the poorest households. However,experience has shown that the poorest, who <strong>of</strong>ten havelarge families, do not opt for the small studio unit butthe one and two bedroom units. Overall, it appears thatthere was <strong>in</strong>sufficient thought given to affordability, both<strong>in</strong>itial down-payment affordability and the percentage<strong>of</strong> monthly <strong>in</strong>come required to be allocated to <strong>hous<strong>in</strong>g</strong>(monthly service charges and mortgage repayments).Moreover, the programme faces a specific affordabilitychallenge <strong>in</strong> terms <strong>of</strong> gender. While special provisionto female-headed households is be<strong>in</strong>g addressed throughthe 30 per cent lottery allocation policy, the reality isthat there is a higher poverty level among femaleheadedhouseholds 3 . Many <strong>of</strong> the poorest householdswho cannot afford <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> are femaleheaded: s<strong>in</strong>gle mothers, with little formal educationor employment. Therefore, because <strong>of</strong> the affordabilityproblems already mentioned these women and theirchildren are excluded from development plans.As described <strong>in</strong> the Lideta case study, an NGO has been<strong>in</strong>strumental <strong>in</strong> facilitat<strong>in</strong>g the down-payment for 200women <strong>in</strong> the Lideta project. Apart from this uniquecase, there are no policies, public systems or f<strong>in</strong>ancialsupport organizations <strong>in</strong> place to facilitate <strong>in</strong>creasedaccess to <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> for women and s<strong>in</strong>glemothers’.Programme f<strong>in</strong>anc<strong>in</strong>gThe current f<strong>in</strong>ancial approach underp<strong>in</strong>n<strong>in</strong>g theprogramme is unsusta<strong>in</strong>able. In order to cont<strong>in</strong>ue theprogramme and meet the ambitious completion targets,secure f<strong>in</strong>ance is necessary. Commenc<strong>in</strong>g projectsrequires considerable fund<strong>in</strong>g and capital outlay fromcity government f<strong>in</strong>ances, which are reportedly alreadyALTHOUGH SPECIAL PROVISION TOFEMALE-HEADED HOUSEHOLDSIS ADDRESSED THROUGH THE 30PER CENT LOTTERY ALLOCATIONPOLICY, THE PROGRAMME FACESAN AFFORDABILITY CHALLENGEIN TERMS OF GENDER BECAUSETHERE IS A HIGHER POVERTYLEVEL AMONG FEMALE-HEADEDHOUSEHOLDS 3 .stretched. Programme f<strong>in</strong>anc<strong>in</strong>g will be further tested<strong>in</strong> the com<strong>in</strong>g years if residents and tenants cannotcont<strong>in</strong>ue to meet mortgage repayments and/or thecommercial units are unsuccessful. Concerns havebeen raised regard<strong>in</strong>g what city government activities40PROGRAMME PERFOMANCE


SEVERAL PROBLEMS HAVE BEENRAISED REGARDING THE LIMITEDCONSULTATION AND PARTICIPATIONPROCESSES, INADEQUATECOMPENSATION IN THE CASE OFRELOCATION, AND THE LACK OFSUPPORT FOR THE TRANSITION OFRELOCATED PEOPLE TO TEMPORARYHOUSING.have been reduced or discont<strong>in</strong>ued <strong>in</strong> order to f<strong>in</strong>ance<strong>condom<strong>in</strong>ium</strong> projects which require significantamounts <strong>of</strong> f<strong>in</strong>ancial resources. Along these l<strong>in</strong>es, cautionmust be taken to grow all aspects <strong>of</strong> cities <strong>in</strong> a balancedfashion, for <strong>in</strong>stance to also grow urban <strong>in</strong>frastructureand services and not only focus on isolated <strong>hous<strong>in</strong>g</strong>projects.Beneficiary consultation and managementAlthough the programme makes explicit effort to consultwidely on development plans, provide compensation<strong>in</strong> the case <strong>of</strong> relocation, and support the transition <strong>of</strong>relocated people through temporary <strong>hous<strong>in</strong>g</strong>, severalproblems have been raised.Private owners have concerns regard<strong>in</strong>g the low level <strong>of</strong>compensation provided for their property, which theyargue is below the current market value 4 . Furthermore,project evaluations <strong>in</strong>dicate that the compensationprocess is not transparent and consistent, and it doesnot account for social and economic costs (for examplemov<strong>in</strong>g household belong<strong>in</strong>gs and disruption to bus<strong>in</strong>ess<strong>in</strong>come/livelihoods) <strong>in</strong>curred due to displacement 5 .Some have suggested that compensation was based onthe estimated value at the time <strong>of</strong> construction, whichis much lower than the current replacement value thusmak<strong>in</strong>g it impossible for affected households to reestablishthemselves <strong>in</strong> <strong>hous<strong>in</strong>g</strong> conditions that are atleast equal to the previous ones.The temporary relocation <strong>of</strong> people <strong>in</strong>to transitional<strong>hous<strong>in</strong>g</strong> is prov<strong>in</strong>g problematic. Unfortunately, it is<strong>of</strong>ten the ‘poorest <strong>of</strong> the poor’ and most vulnerable <strong>in</strong>these houses because they can not afford <strong>condom<strong>in</strong>ium</strong><strong>hous<strong>in</strong>g</strong> 6 . Physical conditions <strong>in</strong> temporary <strong>hous<strong>in</strong>g</strong> areusually worse than those <strong>in</strong> Kebele <strong>hous<strong>in</strong>g</strong> <strong>in</strong> whichthey were liv<strong>in</strong>g previously. Furthermore, residents <strong>of</strong>tenhave to <strong>in</strong>habit temporary houses for a long time (6-12months), and they are scared they will be forgotten or, ifthey cannot afford the down-payment for <strong>condom<strong>in</strong>ium</strong><strong>hous<strong>in</strong>g</strong>, will rema<strong>in</strong> <strong>in</strong> temporary <strong>hous<strong>in</strong>g</strong> 7 . In addition,residents <strong>in</strong> some projects compla<strong>in</strong> that <strong>in</strong>sufficientnotice <strong>of</strong> relocation plans was given to residents, 45days, not the 90 as stipulated by Ethiopian law 8 , andthat government assistance <strong>in</strong> mov<strong>in</strong>g personal itemswas not provided even though it has been agreed aspart <strong>of</strong> the relocation deal. Further research is needed toascerta<strong>in</strong> the validity and scale <strong>of</strong> these issues <strong>in</strong> practice;if it is found to be the case affected households could beconsidered as victims <strong>of</strong> forced eviction by <strong>in</strong>ternationalhuman rights standards.Project specific issuesPeripheral sitesThe lack <strong>of</strong> undeveloped central-city land comb<strong>in</strong>edwith the <strong>in</strong>itial undesirability to undertake projects<strong>in</strong> occupied and slum areas led many projects to belocated on the periphery <strong>of</strong> Addis Ababa, which hasproven problematic for both beneficiaries’ livelihoodsand <strong>in</strong>frastructure provision. There are <strong>in</strong>sufficientemployment opportunities <strong>in</strong> such locations andtransportation to access the city centre is costly andtime consum<strong>in</strong>g. Furthermore, the cost <strong>of</strong> <strong>in</strong>frastructureprovision is greater on peripheral sites, which <strong>in</strong>creasesthe overall project cost and <strong>in</strong> particular the cost to analready f<strong>in</strong>ancially overstretched local government.To address this issue, the completion <strong>of</strong> Bole Summitmarks the last peripheral project and now <strong>condom<strong>in</strong>ium</strong>projects focus on <strong>in</strong>ner city redevelopment sites, whereproposals are for eight storey blocks to make themf<strong>in</strong>ancially viable and address the density requirements.The first <strong>of</strong> these <strong>in</strong>ner city projects is Lideta.Built environment designHav<strong>in</strong>g now been occupied for some time, several issuesconcern<strong>in</strong>g the design <strong>of</strong> the built environment haveemerged. In particular, there are design problems <strong>in</strong>terms <strong>of</strong> the responsiveness <strong>of</strong> the units and urban designto occupants’ needs and activities. Most occupants areaccustomed to liv<strong>in</strong>g close to the ground and so adjust<strong>in</strong>gto life <strong>in</strong> multi-storied apartment blocks is prov<strong>in</strong>g achallenge 9 .Add<strong>in</strong>g to this adjustment pressure, the unit and build<strong>in</strong>gdesign does not successfully respond to occupants’lifestyles and activities. For example, customary activitiessuch as preparation <strong>of</strong> traditional <strong>in</strong>jera bread andslaughter<strong>in</strong>g <strong>of</strong> animals have long been acknowledged ascrucial parts <strong>of</strong> Ethiopian culture 10 .These activities require space for large ovens and openareas for slaughter<strong>in</strong>g. Due to lack <strong>of</strong> space <strong>in</strong> the <strong>in</strong>Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>41


Figure 34: Isolated nature <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> sites on the periphery <strong>of</strong> the city. Bole Summit, Addis Ababa .© UN-HABITAT/ Kather<strong>in</strong>e Hegabthe <strong>condom<strong>in</strong>ium</strong> units, activities such as hand-wash<strong>in</strong>gand goat slaughter<strong>in</strong>g are undertaken <strong>in</strong> circulationareas, which causes an <strong>in</strong>convenience for neighbours.Functionally, many occupants feel that their kitchens aretoo small to be useful and that they are certa<strong>in</strong>ly toosmall for prepar<strong>in</strong>g larger, communal meals.Three other common grievances are the weakness <strong>of</strong>the electricity supply mak<strong>in</strong>g it difficult to facilitate anelectric heater or an <strong>in</strong>jera oven; the electricity junctionsthat rema<strong>in</strong> un-<strong>in</strong>sulated, creat<strong>in</strong>g a danger for children;and the <strong>in</strong>adequate water pressure on the top floor <strong>of</strong> thebuild<strong>in</strong>gs result<strong>in</strong>g <strong>in</strong> a noticeably weaker water supply atthis level. Furthermore, dur<strong>in</strong>g times <strong>of</strong> water shortages,families must collect water <strong>in</strong> buckets and carry themto their flats as there are no water tanks to generate asecondary water supply <strong>in</strong> case <strong>of</strong> such emergency.In response to post-occupancy issues, an awarenesscampaign was undertaken by the Addis Ababa cityadm<strong>in</strong>istration consist<strong>in</strong>g <strong>of</strong> a technical manualoutl<strong>in</strong><strong>in</strong>g appropriate behaviours and responsibilities <strong>in</strong><strong>condom<strong>in</strong>ium</strong>s. Nevertheless, there rema<strong>in</strong>s significantscope to improve the design <strong>of</strong> the built environment,both the units themselves and the overall masterplann<strong>in</strong>g, to improve the responsiveness <strong>of</strong> the physicalenvironment to occupants’ needs, values, and lifestyles.Construction quality and delaysThe programme aims to produce low-cost but not lowquality<strong>hous<strong>in</strong>g</strong>. Nonetheless, there are concerns overthe quality <strong>of</strong> the built environment, <strong>in</strong> particular thequality <strong>of</strong> construction f<strong>in</strong>ishes and <strong>in</strong>frastructure. Forexample, there have been reports <strong>of</strong> burst sewerage pipesthat leaked through all floors and wide-spread crack<strong>in</strong>g<strong>of</strong> wall plaster. The expected lifespan <strong>of</strong> the units is 100years, although local pr<strong>of</strong>essionals and residents doubtthe validity <strong>of</strong> these predictions. Construction quality isaffected by micro and small enterprises seek<strong>in</strong>g to makeadditional pr<strong>of</strong>it by us<strong>in</strong>g cheaper substandard fixtures,THERE REMAINS SIGNIFICANTSCOPE TO IMPROVE THE DESIGNOF THE BUILT ENVIRONMENT, BOTHTHE UNITS THEMSELVES AND THEOVERALL MASTER PLANNING, TOIMPROVE THE RESPONSIVENESS OFTHE PHYSICAL ENVIRONMENT TOOCCUPANTS’ NEEDS, VALUES, ANDLIFESTYLES.42PROGRAMME PERFOMANCE


one million tonnes <strong>of</strong> cement and iron bars from asfar away as Turkey and the Ukra<strong>in</strong>e, and deal with thesurg<strong>in</strong>g demand <strong>of</strong> materials for <strong>condom<strong>in</strong>ium</strong> projects.To improve construction efficiency and reducecosts, the government is currently <strong>in</strong>vestigat<strong>in</strong>galternative build<strong>in</strong>g technologies and systems. They areconcentrat<strong>in</strong>g their efforts on <strong>in</strong>creas<strong>in</strong>g the use <strong>of</strong> localconstruction techniques and materials, and promot<strong>in</strong>gprivate <strong>in</strong>vestment <strong>in</strong> the national production <strong>of</strong> cement,glass, and iron. Research is currently be<strong>in</strong>g conductedon alternative materials, <strong>in</strong> particular on the greatestchallenge: that <strong>of</strong> f<strong>in</strong>d<strong>in</strong>g an alternative material tocement, for the partition walls <strong>of</strong> the build<strong>in</strong>gs, to avoidthe delays it currently causes and to reduce costs.Figure 35: Significant improvement could be made tothe design <strong>of</strong> the built environment to improve theresponsiveness to occupant needs and lifestyles.such as doors and door handles, as well as the low levels<strong>of</strong> construction skills and capacity, which is somewhatunderstandable consider<strong>in</strong>g the vast numbers <strong>of</strong> recentlyemployed <strong>in</strong>experienced contractors and buildersnecessary for projects <strong>of</strong> this scale.Follow<strong>in</strong>g quality issues with early <strong>condom<strong>in</strong>ium</strong>projects, consultants have been hired to carry out qualitysupervision and monitor<strong>in</strong>g. Quality checks on build<strong>in</strong>gmaterials have been implemented alongside monitor<strong>in</strong>g<strong>of</strong> structural frame quality, crucially important <strong>in</strong> theearthquake-zoned city <strong>of</strong> Addis Ababa.Alongside construction quality, construction delays area major issue fac<strong>in</strong>g the programme. The productivity<strong>of</strong> the construction phase has not been as efficient asplanned dur<strong>in</strong>g the programme’s implementation thusfar due to gross material shortages, a lack <strong>of</strong> adequate<strong>in</strong>frastructure, and poor construction managementdelay<strong>in</strong>g completion by as much as a year on some sites.Approximately 50 per cent <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> sites arebeh<strong>in</strong>d schedule because <strong>of</strong> delays <strong>in</strong> the build<strong>in</strong>g <strong>of</strong><strong>in</strong>frastructure. The solution to this problem is to startthe construction <strong>of</strong> <strong>in</strong>frastructure prior to, or alongside,the <strong>hous<strong>in</strong>g</strong> units so as to avoid the delays that cause theentire development to hold up.The most significant material <strong>in</strong>efficiency has been <strong>in</strong>the quantity <strong>of</strong> cement over the past two years. Thegovernment has commissioned the build<strong>in</strong>g <strong>of</strong> multiplecement factories across the country to lessen the burdenon the exist<strong>in</strong>g three, to reduce their imports <strong>of</strong> up toPost-occupancy issuesOne <strong>of</strong> the major challenges fac<strong>in</strong>g the project concernspost-occupation management and monitor<strong>in</strong>g, whichhave received very little attention to date. The programmehas no systems <strong>in</strong> place for post-occupancy engagementon issues such as community cohesion, ma<strong>in</strong>tenance <strong>of</strong>communal areas, and the establishment <strong>of</strong> communitygroups and community based management <strong>of</strong> facilities.In all projects this has resulted <strong>in</strong> significant problemswith the management <strong>of</strong> communal facilities. Thisis particularly the case with the specially designedcommunal build<strong>in</strong>gs that <strong>in</strong> many projects rema<strong>in</strong> unusedbecause their cost was not <strong>in</strong>cluded <strong>in</strong> the unit purchaseprice. While some self-organized resident associationshave taken over the ownership and management <strong>of</strong> thesefacilities, the majority <strong>of</strong> them rema<strong>in</strong> locked and thusunusable until agreement between residents and thegovernment is reached.Many residents have found it difficult to adjust to life<strong>in</strong> multi-storied build<strong>in</strong>g and their new locations.Liv<strong>in</strong>g <strong>in</strong> <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong> br<strong>in</strong>gs certa<strong>in</strong>responsibilities and obligations to ensure harmoniousliv<strong>in</strong>g environment for all residents. Liv<strong>in</strong>g <strong>in</strong> such closequarters, neighbour relations have been stra<strong>in</strong>ed due tonoise and privacy issues. As already mentioned, a writtenguide outl<strong>in</strong><strong>in</strong>g residents’ responsibilities, <strong>in</strong>clud<strong>in</strong>g suchth<strong>in</strong>gs as consideration <strong>of</strong> noise transfer to other units,<strong>in</strong>appropriate use <strong>of</strong> corridors for activities and storageplaces, and respect <strong>of</strong> communal areas by keep<strong>in</strong>g themclean and rubbish free, has been distributed.Livelihoods have been affected because units cannotaccommodate certa<strong>in</strong> <strong>in</strong>come generation activities (suchas bak<strong>in</strong>g bread for sale), which formed a central <strong>in</strong>comesource <strong>in</strong> their previous environment, plac<strong>in</strong>g extraf<strong>in</strong>ancial pressure on many households.Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>43


Figure 36: Redundant communal build<strong>in</strong>g on Mikili land <strong>condom<strong>in</strong>ium</strong> site, Addis Ababa. © UN-HABITAT/ Kather<strong>in</strong>e HegabInternal construction f<strong>in</strong>ish<strong>in</strong>g undertaken by occupants,such as til<strong>in</strong>g, can cause build<strong>in</strong>g ma<strong>in</strong>tenance issues,for example block<strong>in</strong>g dra<strong>in</strong>s with cement. In the BoleGerji neighbourhood residents plastered their <strong>in</strong>ternalsurfaces themselves but poured plaster residue on the s<strong>of</strong>tlandscap<strong>in</strong>g, which ru<strong>in</strong>ed it. S<strong>in</strong>ce this pilot project it isnow a requirement that all <strong>condom<strong>in</strong>ium</strong>s are plastered<strong>in</strong>side and outside prior to occupation.There have been operat<strong>in</strong>g issues with water provisionand sewerage disposal. One reason is the large scale <strong>of</strong>the projects that has created high demand on exist<strong>in</strong>g<strong>in</strong>frastructure (especially sewerage) that is <strong>of</strong>ten nonexistentor <strong>of</strong> poor quality.THERE HAS BEEN INSUFFICIENTMONITORING AND EVALUATIONOF PROGRAMME PROCESSES ANDBUILT PROJECTS, INCLUDING ALLSTAKEHOLDERS BUT ESPECIALLY THEBENEFICIARIES.On the whole, there has been <strong>in</strong>sufficient monitor<strong>in</strong>gand evaluation <strong>of</strong> programme processes and builtprojects, <strong>in</strong>clud<strong>in</strong>g all stakeholders and especially thebeneficiaries.44PROGRAMME PERFOMANCE


conclusions4.1 Key lessonsThe Ethiopian Integrated Hous<strong>in</strong>g DevelopmentProgramme highlights several lessons for address<strong>in</strong>g the<strong>hous<strong>in</strong>g</strong> problem. The IHDP positively demonstrates:• There is a need for strong political commitmentat all levels <strong>of</strong> adm<strong>in</strong>istration to address low<strong>in</strong>come<strong>hous<strong>in</strong>g</strong> at a large scale.• There are many advantages to scal<strong>in</strong>g upsmall <strong>hous<strong>in</strong>g</strong> projects to city and nationallevel programmes to reach more beneficiaries,quicker, and with a coord<strong>in</strong>ated effort thatdevelops the national construction sector.• There is a need to provide tenure security soresidents feel secure to <strong>in</strong>vest <strong>in</strong> (and save for)house ownership and improvement.However, the IHDP also highlights several challenges forimplement<strong>in</strong>g large-scale low-cost <strong>hous<strong>in</strong>g</strong> projects:• Develop<strong>in</strong>g approaches to address thecapabilities <strong>of</strong> the ‘poorest <strong>of</strong> the poor’ whocannot afford formal <strong>condom<strong>in</strong>ium</strong> <strong>hous<strong>in</strong>g</strong>.• Enhanc<strong>in</strong>g the capacity <strong>of</strong> all stakeholders<strong>in</strong>volved, <strong>in</strong>clud<strong>in</strong>g those <strong>in</strong> the public andprivate sectors, as well as beneficiaries.• F<strong>in</strong>d<strong>in</strong>g cheaper ways <strong>of</strong> build<strong>in</strong>g to reduce theneed for cement and re<strong>in</strong>forc<strong>in</strong>g bars, which arebecom<strong>in</strong>g prohibitively expensive.• Consider<strong>in</strong>g <strong>hous<strong>in</strong>g</strong> quality, not just quantity.The challenge, which is far from new, is toimprove the quality (<strong>of</strong> built environmentdesign and construction) without reduc<strong>in</strong>gquantity or significantly <strong>in</strong>creas<strong>in</strong>g costs.• Carry<strong>in</strong>g out slum clearance and resettlementbased on procedural protection and due processprescribed by <strong>in</strong>ternational human rights, toavoid forced evictions.4chapter fourKEY LESSONS ANDCONCLUSIONSContents4.1 Key lessons4.2 Suggestions for improvement4.3 Conclud<strong>in</strong>g remarks – anachievement with positive sideeffects and scope for furtherimprovements4.2 Suggestions for improvementAffordabilitySerious attention should be given to the affordability <strong>of</strong><strong>condom<strong>in</strong>ium</strong> units. Many low-<strong>in</strong>come households areexcluded because they cannot afford the down-paymentor monthly mortgage and service repayments.Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong> 45


AS THE NEED TO MITIGATE THEEFFECTS OF CLIMATE CHANGEBECOME INCREASINGLY APPARENT,IT IS IMPERATIVE THAT ATTENTIONBE GIVEN TO THE ENVIRONMENTALSUSTAINABILITY OF FUTURECONDOMINIUM PROJECTS.F<strong>in</strong>ancial support mechanisms are needed to improveaccess to CH units for the low-<strong>in</strong>come sector. Likewise,specific attention needs to be given to women-headedhouseholds who, although given preference <strong>in</strong> the lottery,cannot secure a unit due to lack <strong>of</strong> f<strong>in</strong>ancial capacity.Information, consultation and compensation <strong>in</strong> theresettlement processMany improvements can be made to the <strong>in</strong>formation,consultation, compensation and resettlement processes.In general, this process should be carried out <strong>in</strong> compliancewith procedural protection and due process for evictionand resettlement (see Box 4). The consultation processshould allow sufficient time for residents to be <strong>in</strong>formedabout development plans, to respond to them, considerall possible alternatives, agree on resettlement options,and organize themselves <strong>in</strong> preparation for resettlement.A notice <strong>of</strong> at least 90 days prior to the resettlement dateshould be given to all affected persons. Governmentneeds to provide assistance for the physical move,<strong>in</strong>clud<strong>in</strong>g personal items, and government <strong>of</strong>ficials needto be on site at the time <strong>of</strong> resettlement. Legal remediesand legal aid should be provided to persons who are <strong>in</strong>need <strong>of</strong> it.All <strong>in</strong>dividuals concerned have a right to adequatecompensation for any property, both personal and real,which is affected. Compensation for property should bebased on its current replacement value <strong>in</strong>stead <strong>of</strong> its valueat the time <strong>of</strong> construction. Rent for temporary <strong>hous<strong>in</strong>g</strong>should be adequately covered by the government. Thephysical standard <strong>of</strong> temporary shelters for relocatedresidents should be improved, or the constructionprocess modified to avoid the need for temporaryaccommodation but rather a direct move for beneficiariesfrom their exist<strong>in</strong>g house to new <strong>condom<strong>in</strong>ium</strong> house.If temporary shelters rema<strong>in</strong>, greater certa<strong>in</strong>ty <strong>of</strong> theirposition regard<strong>in</strong>g future <strong>condom<strong>in</strong>ium</strong> ownershipshould be given.Design and construction improvementWhile overall there is a certa<strong>in</strong> level <strong>of</strong> beneficiaryparticipation <strong>in</strong> projects, there is little participation<strong>in</strong> the build<strong>in</strong>g and master plann<strong>in</strong>g design process.Opportunities for beneficiary <strong>in</strong>volvement <strong>in</strong> theplann<strong>in</strong>g and design should be explored <strong>in</strong> an effort tocreate greater attachment to the f<strong>in</strong>al built product andmake the built environment more responsive to locallifestyles and culture. If beneficiaries rema<strong>in</strong> excludedfrom the design process, the design pr<strong>of</strong>essionals <strong>in</strong>volved<strong>in</strong> generat<strong>in</strong>g the proposals should give greater attentionto beneficiary dwell<strong>in</strong>g aspirations and lifestyles.Importantly, as the need to mitigate the effects <strong>of</strong>climate change become <strong>in</strong>creas<strong>in</strong>gly apparent, it isimperative that attention be given to the environmentalsusta<strong>in</strong>ability <strong>of</strong> future <strong>condom<strong>in</strong>ium</strong> projects. Globally,the build<strong>in</strong>g sector accounts for a significant proportion<strong>of</strong> greenhouse gas emissions through embodied energy<strong>of</strong> materials and operational energy use. Unfortunately,to date the IHDP has not considered these two aspects,yet these should be central <strong>in</strong> the plann<strong>in</strong>g and design<strong>of</strong> future IHDP projects. The search for alternatives tocement as ma<strong>in</strong> build<strong>in</strong>g material is a positive effort <strong>in</strong>tothe right direction.The quality <strong>of</strong> the construction should be improved.This requires cont<strong>in</strong>ual capacity build<strong>in</strong>g <strong>of</strong> pr<strong>of</strong>essionalsand contractors as well as on-site quality checks (<strong>of</strong>construction processes and raw materials) by tra<strong>in</strong>edpr<strong>of</strong>essionals.OPPORTUNITIES FOR BENEFICIARYINVOLVEMENT IN THE PLANNINGAND DESIGN SHOULD BE EXPLOREDIN AN EFFORT TO MAKE THE BUILTENVIRONMENT MORE RESPONSIVETO LOCAL LIFESTYLES ANDCULTURE.Post-occupancyThere is a press<strong>in</strong>g need to undertake thorough postoccupancymonitor<strong>in</strong>g and evaluation <strong>of</strong> built projects.This is important to learn lessons for use <strong>in</strong> future<strong>condom<strong>in</strong>ium</strong> projects. Evaluation should <strong>in</strong>clude allstakeholders, especially the residents.46KEY LESSONS AND CONCLUSIONS


IN LIGHT OF ETHIOPIA’S PREVIOUSLYUNCOORDINATED AND INEFFICIENTHOUSING SECTOR, THE INTEGRATEDHOUSING DEVELOPMENTPROGRAMME HAS PROVED TO BEA HIGHLY SUCCESSFUL TOOL FORAFFORDABLE HOUSING DELIVERY ATLARGE SCALE.There is a need to address the post-occupancy issuesregard<strong>in</strong>g the ownership and management <strong>of</strong> communalfacilities. These facilities are crucial parts <strong>of</strong> the builtenvironment and their use should be facilitated, however,the government has to acknowledge that the majority <strong>of</strong>residents cannot afford to buy or rent these facilities andtherefore the cost implications need to be thoroughlyconsidered.and their overall economic situation are improved. Thisrental practice is entirely ‘pro-poor’ because it is hard todeny that those who can afford the down-payment areeconomically benefit<strong>in</strong>g from the programme. Thus, theIntegrated Hous<strong>in</strong>g Development Programme, <strong>in</strong>deed,is not just a <strong>hous<strong>in</strong>g</strong> programme but a wealth generationprogramme for low-<strong>in</strong>come households. Among otherbenefits, ownership <strong>of</strong> a <strong>condom<strong>in</strong>ium</strong> property can beused as collateral to enable the owner to borrow money<strong>in</strong> the future for <strong>in</strong>vestment.In light <strong>of</strong> Ethiopia’s previously uncoord<strong>in</strong>ated and<strong>in</strong>efficient <strong>hous<strong>in</strong>g</strong> sector, the programme demonstratessignificant achievement <strong>in</strong> ‘go<strong>in</strong>g to scale’. It has impactedon the country beyond the provision <strong>of</strong> <strong>hous<strong>in</strong>g</strong> units.It has improved the economy, created employmentopportunities, brought capacity development, andpromoted micro- and small-enterprises. Work rema<strong>in</strong>sto be done, however, to improve the programme so itachieves its target <strong>of</strong> improved liv<strong>in</strong>g conditions for moreEthiopians and especially for its lowest <strong>in</strong>come group.4.3 Conclud<strong>in</strong>g remarks – anachievement with positiveside effects and scope forfurther improvementsThe Integrated Hous<strong>in</strong>g Development Programme isan ambitious achievement for Ethiopia. It is a physicalmanifestation <strong>of</strong> the transition from a static urban<strong>hous<strong>in</strong>g</strong> sector based ma<strong>in</strong>ly on publicly provided andcontrolled poor-quality rental <strong>hous<strong>in</strong>g</strong> to a dynamichomeownership-based approach with <strong>in</strong>telligent crosssubsidisationfor the poor, where the focus is on build<strong>in</strong>gthe capacity <strong>of</strong> private companies and on economicdevelopment <strong>in</strong> general. The Integrated Hous<strong>in</strong>gDevelopment Programme has proved to be a highlyeffective tool for affordable <strong>hous<strong>in</strong>g</strong> delivery at largescale. The recent use <strong>of</strong> <strong>condom<strong>in</strong>ium</strong> development forurban renewal and slum upgrad<strong>in</strong>g has great potential tobe replicated <strong>in</strong> other areas <strong>of</strong> the city with very poor andnot upgradable <strong>hous<strong>in</strong>g</strong> conditions, but the approachneeds some improvements to comply with <strong>in</strong>ternationalhuman rights law.THE INTEGRATED HOUSINGDEVELOPMENT PROGRAMME ISNOT JUST A HOUSING PROGRAMMEBUT A WEALTH GENERATIONPROGRAMME FOR LOW-INCOMEHOUSEHOLDS.The prevalent practice by <strong>condom<strong>in</strong>ium</strong> owners <strong>of</strong>rent<strong>in</strong>g out their units to wealthier households does notmeet the orig<strong>in</strong>al aim <strong>of</strong> improv<strong>in</strong>g the liv<strong>in</strong>g conditions<strong>of</strong> the low-<strong>in</strong>come sector <strong>of</strong> the population by directlyprovid<strong>in</strong>g them with affordable <strong>hous<strong>in</strong>g</strong>. However, s<strong>in</strong>cethey use the rental <strong>in</strong>come to move to a better kebelehouse and for <strong>in</strong>come-generat<strong>in</strong>g activities, they ga<strong>in</strong> <strong>in</strong>two respects: the quality <strong>of</strong> their <strong>hous<strong>in</strong>g</strong> environmentCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>47


BibliographyAbate, M. (2001) Hous<strong>in</strong>g the Poor <strong>in</strong> Addis Abeba: Trends and Opportunities. F<strong>in</strong>al Report No. 2961 for the workshopUrban Management: Plann<strong>in</strong>g and F<strong>in</strong>ance. 79 th ICHUD, IHS, Rotterdam, The Netherlands.Abebe, E. (1997) Nationalisation <strong>of</strong> Urban Lands and Extra Urban houses: Impacts on Home Ownership Rights <strong>in</strong>Ethiopia with particular Reference to Addis Ababa. Report 2518, ICHUD 71, IHS, Rotterdam, The Netherlands.Abelti, G., Brazzoduro, M. and Gebremedh<strong>in</strong>, B. (2001) Hous<strong>in</strong>g Conditions and Demand for Hous<strong>in</strong>g <strong>in</strong> UrbanEthiopia. Jo<strong>in</strong>t report prepared by the Central Statistical Authority, Addis Ababa and The Institute for PopulationResearch- National Research Council. Rome, Italy.Acioly C. (2010). New Towns for the 21 st Century: the Planned vs. the Unplanned City. The Informal City andthe Phenomenon <strong>of</strong> Slum’s: The Challenges <strong>of</strong> Slum Upgrad<strong>in</strong>g and Slum Prevention. SUN architecture and authors,Amsterdam.Addis Ababa City Government (2009) Tra<strong>in</strong><strong>in</strong>g Manual: Electrical and Water/ Sanitation Installations. StrancomEng<strong>in</strong>eer<strong>in</strong>g Consultants, Addis Ababa.Andemeskel, E. (1986) Ways <strong>of</strong> Life <strong>in</strong> Hudmo & Ethiopian Urban Houses. In, Kervanto Nevanl<strong>in</strong>na, A. andPöyhiä, T. (Eds) Ways <strong>of</strong> Life as a Basis for Hous<strong>in</strong>g Design <strong>in</strong> Ethiopia. Espoo: Hels<strong>in</strong>ki University <strong>of</strong> Technology,Department <strong>of</strong> Architecture, pp. 21-42.Aneley, A. (2006) Synoptic Reflection on Urban Land Adm<strong>in</strong>istration Issues <strong>in</strong> Ethiopia. Land Adm<strong>in</strong>istration DecisionMakers Meet<strong>in</strong>g, United Nations University and Polytechnic <strong>of</strong> Nambia. W<strong>in</strong>dhoek, 7-8 December 2006.Berrisford, S. (2002) Land Management Regulations for Addis Ababa. Report prepared for Addis Ababa Development andImprovement Project Office, 15 July 2002, Rotterdam.Central Statistical Authority and United Nations Population Fund (2008). Ethiopia, Summary and Statistical Report<strong>of</strong> the 2007 Population and Hous<strong>in</strong>g Census, Population Census Commission. UNFPA.Committee on Economic, Social and Cultural Rights (CESCR) (1997). The right to adequate <strong>hous<strong>in</strong>g</strong> (Art.11.1):forced evictions: CESCR General comment 7. 20/05/1997.http://www.unhchr.ch/tbs/doc.nsf/(Symbol)/959f71e476284596802564c3005d8d50?OpendocumentDolicho, E. (1996) Improv<strong>in</strong>g access to <strong>hous<strong>in</strong>g</strong> for the low-<strong>in</strong>come groups through self-help <strong>hous<strong>in</strong>g</strong> co-operatives <strong>in</strong> AddisAbaba: the case <strong>of</strong> pure self-help <strong>hous<strong>in</strong>g</strong> co-operatives <strong>in</strong> Addis Ababa city, Ethiopia. Master’s thesis, Urban ManagementCentre, Rotterdam, The Netherlands.Hailu, T. (2001) The role <strong>of</strong> <strong>hous<strong>in</strong>g</strong> cooperatives to overcome urban <strong>hous<strong>in</strong>g</strong> problems: the case <strong>of</strong> Mekelle. UnpublishedMaster’s thesis. Urban Management Centre, Rotterdam, The Netherlands.Haregewo<strong>in</strong>, Y. (2007) Integrated Hous<strong>in</strong>g Development Programs for Urban Poverty Alleviation and Susta<strong>in</strong>ableDevelopment (The Case <strong>of</strong> Addis Ababa). Proceed<strong>in</strong>gs, European Network for Hous<strong>in</strong>g Research 2007: Susta<strong>in</strong>ableUrban Areas. Rotterdam, 25-28 June 2007.Hehl, R. and Stollman. J. (2010) New Towns for the 21 st Century: the Planned vs. the Unplanned City. New-Town-To-Be: Kotebe Hana Mariam. An Urban<strong>in</strong>form.net Test-site <strong>in</strong> Addis Ababa. SUN Architecture and authors, Amsterdam.Kebbede, G. Jacob, M. (1985) Urban growth and the <strong>hous<strong>in</strong>g</strong> problem <strong>in</strong> Ethiopia. Cities, August 1985, pp. 230-242.Keffa, Solomon. (2005) Hous<strong>in</strong>g development as an <strong>in</strong>strument to alleviate urban poverty: The case <strong>of</strong> Addis Ababa.<strong>International</strong> Conference on Land <strong>in</strong> the Urban Landscape, Gothenburg, Sweden, 29 May-1 June 2005.Kumie A. and Berhane Y. Crowd<strong>in</strong>g <strong>in</strong> traditional rural <strong>hous<strong>in</strong>g</strong> (“Tukul”) <strong>in</strong> Ethiopia.http://ejhd.uib.no/ejhd16-n3/ejhdv16no3-page303.PDF48


M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2010) Hous<strong>in</strong>g Development Report 1998-2002 Ethiopian Calendar(2005-2010). Addis Ababa.M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Integrated Hous<strong>in</strong>g Development Programme <strong>of</strong> the FederalDemocratic Republic <strong>of</strong> Ethiopia. African M<strong>in</strong>isterial Conference on Hous<strong>in</strong>g and Urban Development, AMCHUD,Abuja, Nigeria, 28-30 July 2008.M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Urban Sector and Construction Industry Performance Report <strong>of</strong>2008/09. Addis Ababa.M<strong>in</strong>istry <strong>of</strong> Works and Urban Development. (2009). Film: Fruits <strong>of</strong> Hard Labour. Halleta Advertis<strong>in</strong>g Media andEnterta<strong>in</strong>ment PLC.M<strong>in</strong>istry <strong>of</strong> Works and Urban Development. (no date) Microlend<strong>in</strong>g Programme for Hous<strong>in</strong>g <strong>in</strong> Ethiopia. Unpublishedreport.Mulugeta, S. (1995) Hous<strong>in</strong>g for Low and Moderate Income Workers <strong>in</strong> Addis Ababa, Ethiopia: Policy versus Performance.PhD Thesis, Graduate School-New Brunswick Rutgers, New Jersey.OHCHR (2007) Basic Pr<strong>in</strong>ciples and Guidel<strong>in</strong>es on Development-Based Evictions and Displacement, Annex 1 <strong>of</strong>the report <strong>of</strong> the Special Rapporteur on adequate <strong>hous<strong>in</strong>g</strong> as a component <strong>of</strong> the right to an adequate standard <strong>of</strong>liv<strong>in</strong>g, A/HRC/4/18, http://www2.ohchr.org/english/issues/<strong>hous<strong>in</strong>g</strong>/docs/guidel<strong>in</strong>es_en.pdfPopulation Division <strong>of</strong> the Department <strong>of</strong> Economic and Social Affairs <strong>of</strong> the United Nations Secretariat, WorldPopulation Prospects: The 2008 Revision and World Urbanization Prospects: The 2009 Revision, http://esa.un.org/wup2009/unup/, Friday, December 03, 2010; 6:11:14 AM.Sileshi, T. (2002) Hous<strong>in</strong>g Cooperatives: Answers for Addis Ababa Hous<strong>in</strong>g Demand. Case study <strong>in</strong> Land and Hous<strong>in</strong>gManagement Theme. December 2002.Tesfaye, A. (2007) Problems and prospects <strong>of</strong> <strong>hous<strong>in</strong>g</strong> development <strong>in</strong> Ethiopia. Property Management, Vol. 25, No.1, pp. 27-53.Teshome T. (2008) Manag<strong>in</strong>g Ethiopian Cities <strong>in</strong> an Era <strong>of</strong> Rapid Urbanisation. Appraisal <strong>of</strong> <strong>hous<strong>in</strong>g</strong> typologies <strong>in</strong>Addis Ababa. IHS, Eburon Delft.UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without Slums Programme:Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme: Nairobi, Kenya.UN-HABITAT (2008) Ethiopia Urban Pr<strong>of</strong>ile. UN-HABITAT: Nairobi.UN-HABITAT (2008) Addis Ababa Urban Pr<strong>of</strong>ile. UN-HABITAT: Nairobi.UN-HABITAT (2010) State <strong>of</strong> the World’s cities Report 2010/2011: Bridg<strong>in</strong>g the Urban Divide. Earthscan: London.Woldehanna, S. (2003) Promotion <strong>of</strong> Cost Efficient Hous<strong>in</strong>g <strong>in</strong> Ethiopia: The Case <strong>of</strong> GTZ Experience. Report No.3204. 85 th ICHUD, IHS, Rotterdam, The Netherlands.Woiundimagegnehu, T. (2009) Affordable Houses for Middle and Low Income Group <strong>in</strong> Ethiopia: Self-help <strong>hous<strong>in</strong>g</strong> with<strong>in</strong>novative construction technology. IHS, Rotterdam, The Netherlands.Yami, Nirke, Aseffa, Tarekegn, and Dolicho, Eyob (2007) Consequences <strong>of</strong> the Condom<strong>in</strong>ium <strong>hous<strong>in</strong>g</strong> project <strong>in</strong> AddisAbaba with a focus on <strong>hous<strong>in</strong>g</strong> access to the poorest <strong>in</strong> the city. Draft Report prepared by Development Partners, July10 2007. Addis Ababa Civil Society Urban Renewal Committee (ACSURC) and Christian Relief and DevelopmentAssociation (CRDA).Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>49


EndnotesSection One Endnotes1 UN-HABITAT (2008) Ethiopia Urban Pr<strong>of</strong>ile. UN-HABITAT: Nairobi, p.11.2 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Integrated Hous<strong>in</strong>g Development Programme <strong>of</strong>the Federal Democratic Republic <strong>of</strong> Ethiopia. African M<strong>in</strong>isterial Conference on Hous<strong>in</strong>g and UrbanDevelopment, AMCHUD, Abuja, Nigeria, 28-30 July 2008, p.2.3 Ibid., p.2.4 UN-HABITAT, op. cit., p.6.5 Central Statistical Authority and United Nations Population Fund (2008). Ethiopia, Summary andStatistical Report <strong>of</strong> the 2007 Population and Hous<strong>in</strong>g Census, Population Census Commission. UNFPA.6 Population Division <strong>of</strong> the Department <strong>of</strong> Economic and Social Affairs <strong>of</strong> the United Nations Secretariat,World Population Prospects: The 2008 Revision and World Urbanization Prospects: The 2009 Revision,http://esa.un.org/wup2009/unup/, Friday, December 03, 2010; 6:11:14 AM.7 Ibid.8 UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without SlumsProgramme: Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme:Nairobi, Kenya, p. 177.9 UN-HABITAT (2008) Ethiopia Urban Pr<strong>of</strong>ile. UN-HABITAT: Nairobi, p. 10.10 Population Division <strong>of</strong> the Department <strong>of</strong> Economic and Social Affairs <strong>of</strong> the United Nations Secretariat,World Population Prospects: The 2008 Revision and World Urbanization Prospects: The 2009 Revision,http://esa.un.org/wup2009/unup/, Friday, December 03, 2010; 6:11:14 AM.11 Ibid.12 UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without SlumsProgramme: Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme:Nairobi, Kenya, p. 177.13 UN-HABITAT (2008) Ethiopia Urban Pr<strong>of</strong>ile. UN-HABITAT: Nairobi, p.9.14 Hehl, R. and Stollman. J. (2010) New Towns for the 21st Century: the Planned vs. the UnplannedCity. New-Town-To-Be: Kotebe Hana Mariam. An Urban<strong>in</strong>form.net Test-site <strong>in</strong> Addis Ababa. SUNArchitecture and authors, Amsterdam, p. 234.15 UN-HABITAT (2010) State <strong>of</strong> the World’s cities Report 2010/2011: Bridg<strong>in</strong>g the Urban Divide.Earthscan: London, p.169.16 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development. (2008). Paper: Integrated Hous<strong>in</strong>g Development Program<strong>of</strong> the Federal Democratic Republic <strong>of</strong> Ethiopia. African M<strong>in</strong>isterial Conference on Hous<strong>in</strong>g and UrbanDevelopment, p. 2.17 UN-HABITAT, op. cit., p.169.18 Kebbede, G. Jacob, M. (1985) Urban growth and the <strong>hous<strong>in</strong>g</strong> problem <strong>in</strong> Ethiopia. Cities, August 1985,pp. 230-242.19 Abate, M. (2001) Hous<strong>in</strong>g the Poor <strong>in</strong> Addis Abeba: Trends and Opportunities. F<strong>in</strong>al Report No. 2961for the workshop Urban Management: Plann<strong>in</strong>g and F<strong>in</strong>ance. 79th ICHUD, IHS, Rotterdam, TheNetherlands.20 Kebbede, G. Jacob, M., op. cit.21 UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without SlumsProgramme: Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme:Nairobi, Kenya.22 UN-HABITAT, op. cit.23 Teshome T. (2008). Manag<strong>in</strong>g Ethiopian Cities <strong>in</strong> an Era <strong>of</strong> Rapid Urbanisation. Appraisal <strong>of</strong> <strong>hous<strong>in</strong>g</strong>typologies <strong>in</strong> Addis Ababa. IHS, Eburon Delft, p. 45.24 Mulugeta, S. (1995) Hous<strong>in</strong>g for Low and Moderate Income Workers <strong>in</strong> Addis Ababa, Ethiopia: Policyversus Performance. PhD Thesis, Graduate School-New Brunswick Rutgers, New Jersey, p. 69.25 Kebbede, G. Jacob, M., op. cit.26 Mulugeta, S., op. cit., p. ii.50Bibliography


27 Ibid., p. 71.28 Mulugeta, S., op. cit., p. 96.29 Kumie A. and Berhane Y. Crowd<strong>in</strong>g <strong>in</strong> traditional rural <strong>hous<strong>in</strong>g</strong> (“Tukul”) <strong>in</strong> Ethiopia.http://ejhd.uib.no/ejhd16-n3/ejhdv16no3-page303.PDF, p. 1.30 Mulugeta, S., op. cit., p. 96.31 Acioly C. (2010). New Towns for the 21st Century: the Planned vs. the Unplanned City. The InformalCity and the Phenomenon <strong>of</strong> Slum’s: The Challenges <strong>of</strong> Slum Upgrad<strong>in</strong>g and Slum Prevention. SUNarchitecture and authors, Amsterdam, p. 4.32 UN-Habitat (2008) Ethiopia: Urban Pr<strong>of</strong>ile. UN-Habitat: Nairobi,33 Ibid.34 Ibid., p. 14.35 Dolicho, E. (1996) Improv<strong>in</strong>g access to <strong>hous<strong>in</strong>g</strong> for the low-<strong>in</strong>come groups through self-help <strong>hous<strong>in</strong>g</strong> cooperatives<strong>in</strong> Addis Ababa: the case <strong>of</strong> pure self-help <strong>hous<strong>in</strong>g</strong> co-operatives <strong>in</strong> Addis Ababa city, Ethiopia.Master’s thesis, Urban Management Centre, Rotterdam, The Netherlands.36 Hailu, T. (2001) The role <strong>of</strong> <strong>hous<strong>in</strong>g</strong> cooperatives to overcome urban <strong>hous<strong>in</strong>g</strong> problems: the case <strong>of</strong>Mekelle. Master’s thesis. Urban Management Centre, Rotterdam, The Netherlands.37 Sileshi, T. (2002) Hous<strong>in</strong>g Cooperatives: Answers for Addis Ababa Hous<strong>in</strong>g Demand. Case study <strong>in</strong> Landand Hous<strong>in</strong>g Management Theme. December 2002.38 Tesfaye, A. (2007) Problems and prospects <strong>of</strong> <strong>hous<strong>in</strong>g</strong> development <strong>in</strong> Ethiopia. Property Management,Vol. 25, No. 1, pp. 27-53.39 Berrisford, S. (2002) Land Management Regulations for Addis Ababa. Report prepared for Addis AbabaDevelopment and Improvement Project Office, 15 July 2002, Rotterdam.40 Berrisford, S. (2002) Land Management Regulations for Addis Ababa. Report prepared for Addis AbabaDevelopment and Improvement Project Office, 15 July 2002, Rotterdam.41 UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without SlumsProgramme: Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme:Nairobi, Kenya.42 UN-HABITAT, op. cit.43 Abelti, G., Brazzoduro, M. and Gebremedh<strong>in</strong>, B. (2001) Hous<strong>in</strong>g Conditions and Demand for Hous<strong>in</strong>g <strong>in</strong>Urban Ethiopia. Jo<strong>in</strong>t report prepared by the Central Statistical Authority, Addis Ababa and The Institutefor Population Research- National Research Council, Rome, Italy, pp. 10.44 Haregewo<strong>in</strong>, Y., op. cit., p.5.45 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Integrated Hous<strong>in</strong>g Development Programme <strong>of</strong>the Federal Democratic Republic <strong>of</strong> Ethiopia. African M<strong>in</strong>isterial Conference on Hous<strong>in</strong>g and UrbanDevelopment, AMCHUD, Abuja, Nigeria, 28-30 July 2008, p.2.46 Haregewo<strong>in</strong>, Y. (2007) Integrated Hous<strong>in</strong>g Development Programs for Urban Poverty Alleviation andSusta<strong>in</strong>able Development (The Case <strong>of</strong> Addis Ababa). Proceed<strong>in</strong>gs, European Network for Hous<strong>in</strong>gResearch 2007: Susta<strong>in</strong>able Urban Areas. Rotterdam, 25-28 June 2007. p.32.47 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development, op. cit., p.2.48 Haregewo<strong>in</strong>, Y., op. cit., p. 5.49 Ibid.50 Abebe, E. (1997) Nationalisation <strong>of</strong> Urban Lands and Extra Urban houses: Impacts on Home OwnershipRights <strong>in</strong> Ethiopia with particular Reference to Addis Ababa. Report 2518, ICHUD 71, IHS, Rotterdam,The Netherlands.51 Woldehanna, S. (2003) Promotion <strong>of</strong> Cost Efficient Hous<strong>in</strong>g <strong>in</strong> Ethiopia: The Case <strong>of</strong> GTZ Experience.Report No. 3204. 85th ICHUD, IHS, Rotterdam, The Netherlands.52 Woiundimagegnehu, T. (2009) Affordable Houses for Middle and Low Income Group <strong>in</strong> Ethiopia: Selfhelp<strong>hous<strong>in</strong>g</strong> with <strong>in</strong>novative construction technology. XXX?53 Tesfahunegn, A. (1999) Construction <strong>in</strong> Ethiopia.54 Woldehanna, S. (2003) Promotion <strong>of</strong> Cost Efficient Hous<strong>in</strong>g <strong>in</strong> Ethiopia: The Case <strong>of</strong> GTZ Experience.Report No. 3204. 85th ICHUD, IHS, Rotterdam, The Netherlands.55 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Urban Sector and Construction Industry PerformanceReport <strong>of</strong> 2008/09. p. 22.56 Ibid.57 UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without SlumsCondom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>51


Programme: Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme:Nairobi, Kenya, p. 33.58 Ibid.59 UN-HABITAT (2008) Addis Ababa Urban Pr<strong>of</strong>ile. UN-HABITAT: Nairobi. p.660 UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without SlumsProgramme: Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme:Nairobi, Kenya.61 Ibid.62 UN-HABITAT (2008) Ethiopia Urban Pr<strong>of</strong>ile. UN-HABITAT: Nairobi, p. 22.63 Ibid., p. 22.64 UN-HABITAT (2008) Addis Ababa Urban Pr<strong>of</strong>ile. UN-HABITAT: Nairobi. p.665 Haregewo<strong>in</strong>, Y., op. cit.66 Aneley, A. (2006) Synoptic Reflection on Urban Land Adm<strong>in</strong>istration Issues <strong>in</strong> Ethiopia. LandAdm<strong>in</strong>istration Decision Makers Meet<strong>in</strong>g, United Nations University and Polytechnic <strong>of</strong> Nambia.W<strong>in</strong>dhoek, 7-8 December 2006.67 UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without SlumsProgramme: Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme:Nairobi, Kenya.68 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Integrated Hous<strong>in</strong>g Development Programme <strong>of</strong>the Federal Democratic Republic <strong>of</strong> Ethiopia. African M<strong>in</strong>isterial Conference on Hous<strong>in</strong>g and UrbanDevelopment, AMCHUD, Abuja, Nigeria, 28-30 July 2008, p. 3.69 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Integrated Hous<strong>in</strong>g Development Programme <strong>of</strong>the Federal Democratic Republic <strong>of</strong> Ethiopia. African M<strong>in</strong>isterial Conference on Hous<strong>in</strong>g and UrbanDevelopment, AMCHUD, Abuja, Nigeria, 28-30 July 2008, p.5.70 Ibid., p.4.71 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Integrated Hous<strong>in</strong>g Development Programme <strong>of</strong>the Federal Democratic Republic <strong>of</strong> Ethiopia. African M<strong>in</strong>isterial Conference on Hous<strong>in</strong>g and UrbanDevelopment, AMCHUD, Abuja, Nigeria, 28-30 July 2008, p. 3.Section Two Endnotes1 Dolicho, E. (2006) Condom<strong>in</strong>ium, a New Hous<strong>in</strong>g Development Approach for address<strong>in</strong>g the LowIncome Hous<strong>in</strong>g Problem <strong>of</strong> Addis Ababa, Ethiopia (F<strong>in</strong>al Report). ICHUD, IHS, June 2006, Rotterdam,The Netherlands.2 Haregewo<strong>in</strong>, Y. (2007) Integrated Hous<strong>in</strong>g Development Programs for Urban Poverty Alleviation andSusta<strong>in</strong>able Development (The Case <strong>of</strong> Addis Ababa). Proceed<strong>in</strong>gs, European Network for Hous<strong>in</strong>gResearch 2007: Susta<strong>in</strong>able Urban Areas. Rotterdam, 25-28 June 2007.3 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development. Microlend<strong>in</strong>g Programme for Hous<strong>in</strong>g <strong>in</strong> Ethiopia, p. 16.4 Hehl, R. and Stollman. J. (2010) New Towns for the 21 st Century: the Planned vs. the UnplannedCity. New-Town-To-Be: Kotebe Hana Mariam. An Urban<strong>in</strong>form.net Test-site <strong>in</strong> Addis Ababa. SUNArchitecture and authors, Amsterdam, p. 234. p. 235.5 Quote from <strong>in</strong>terview with Mr. Haile, Addis Ababa City Adm<strong>in</strong>istration6 Haregewo<strong>in</strong> op. cit., p. 10.7 Addis Ababa City Government (2009) Tra<strong>in</strong><strong>in</strong>g Manual: Electrical and Water/ Sanitation Installations.Strancom Eng<strong>in</strong>eer<strong>in</strong>g Consultants, Addis Ababa.8 UN-HABITAT (2007) Situation Analysis <strong>of</strong> Informal Settlements <strong>in</strong> Addis Ababa. Cities without SlumsProgramme: Addis Ababa Slum Upgrad<strong>in</strong>g Programme. United Nations Human Settlements Programme:Nairobi, Kenya.9 The Micro F<strong>in</strong>ance Institution provided funds as it had re-orientated its credit policy to provide extrasupport to Micro & Small Enterprises.52ENDNOTES


10 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development. (2009). Film: Fruits <strong>of</strong> Hard Labour. Halleta Advertis<strong>in</strong>gMedia and Enterta<strong>in</strong>ment PLC.11 Ibid.12 Committee on Economic, Social and Cultural Rights (CESCR) (1997), The right to adequate <strong>hous<strong>in</strong>g</strong>(Art.11.1): forced evictions: CESCR General comment 7. 20/05/1997.http://www.unhchr.ch/tbs/doc.nsf/(Symbol)/959f71e476284596802564c3005d8d50?Opendocument13 OHCHR (2007), Basic Pr<strong>in</strong>ciples and Guidel<strong>in</strong>es on Development-Based Evictions and Displacement,Annex 1 <strong>of</strong> the report <strong>of</strong> the Special Rapporteur on adequate <strong>hous<strong>in</strong>g</strong> as a component <strong>of</strong> the right toan adequate standard <strong>of</strong> liv<strong>in</strong>g, A/HRC/4/18, http://www2.ohchr.org/english/issues/<strong>hous<strong>in</strong>g</strong>/docs/guidel<strong>in</strong>es_en.pdfSection Three Endnotes1 Dolicho, E. (2006) Condom<strong>in</strong>ium, a New Hous<strong>in</strong>g Development Approach for address<strong>in</strong>g the LowIncome Hous<strong>in</strong>g Problem <strong>of</strong> Addis Ababa, Ethiopia (F<strong>in</strong>al Report). ICHUD, IHS, June 2006, Rotterdam,The Netherlands. p. 10.2 M<strong>in</strong>istry <strong>of</strong> Works and Urban Development (2008) Integrated Hous<strong>in</strong>g Development Programme <strong>of</strong>the Federal Democratic Republic <strong>of</strong> Ethiopia. African M<strong>in</strong>isterial Conference on Hous<strong>in</strong>g and UrbanDevelopment, AMCHUD, Abuja, Nigeria, 28-30 July 2008, p. 3.3 Yami, Nirke, Aseffa, Tarekegn, and Dolicho, Eyob (2007) Consequences <strong>of</strong> the Condom<strong>in</strong>ium <strong>hous<strong>in</strong>g</strong>project <strong>in</strong> Addis Ababa with a focus on <strong>hous<strong>in</strong>g</strong> access to the poorest <strong>in</strong> the city. Draft Report preparedby Development Partners, July 10 2007. Addis Ababa Civil Society Urban Renewal Committee(ACSURC) and Christian Relief and Development Association (CRDA).4 Keffa, Solomon. (2005) Hous<strong>in</strong>g development as an <strong>in</strong>strument to alleviate urban poverty: The case <strong>of</strong>Addis Ababa. <strong>International</strong> Conference on Land <strong>in</strong> the Urban Landscape, Gothenburg, Sweden, 29 May-1June 2005.5 Yami, Nirke, Aseffa, Tarekegn, and Dolicho, Eyob (2007) Consequences <strong>of</strong> the Condom<strong>in</strong>ium <strong>hous<strong>in</strong>g</strong>project <strong>in</strong> Addis Ababa with a focus on <strong>hous<strong>in</strong>g</strong> access to the poorest <strong>in</strong> the city. Draft Report preparedby Development Partners, July 10 2007. Addis Ababa Civil Society Urban Renewal Committee(ACSURC) and Christian Relief and Development Association (CRDA).6 Ibid.7 Keffa, op.cit.8 Keffa, op. cit.9 Keffa, op. cit.10 Andemeskel, E. (1986) Ways <strong>of</strong> Life <strong>in</strong> Hudmo & Ethiopian Urban Houses. In, Kervanto Nevanl<strong>in</strong>na,A. and Pöyhiä, T. (Eds) Ways <strong>of</strong> Life as a Basis for Hous<strong>in</strong>g Design <strong>in</strong> Ethiopia. Espoo: Hels<strong>in</strong>kiUniversity <strong>of</strong> Technology, Department <strong>of</strong> Architecture, pp. 21-42.Condom<strong>in</strong>ium Hous<strong>in</strong>g <strong>in</strong> <strong>ethiopia</strong>53


SUMMARYS<strong>in</strong>ce 2005 Ethiopia has been implement<strong>in</strong>g an ambitious government-led low- and middle<strong>in</strong>come<strong>hous<strong>in</strong>g</strong> programme: The Integrated Hous<strong>in</strong>g Development Programme (IHDP) whichaims to construct 400,000 <strong>hous<strong>in</strong>g</strong> units, create 200,000 jobs, promote the development <strong>of</strong>10,000 micro- and small- enterprises, and enhance the capacity <strong>of</strong> the construction sector.This authoritative book documents the genesis <strong>of</strong> the programme and the country’s experiences<strong>in</strong>ce its <strong>in</strong>ception. As it is <strong>in</strong>tended for policy makers, public sector <strong>of</strong>ficials, and urban and<strong>hous<strong>in</strong>g</strong> practitioners, it logically outl<strong>in</strong>es the design <strong>of</strong> this programme and its effect onthe multiple dimensions <strong>of</strong> <strong>hous<strong>in</strong>g</strong>. Through document<strong>in</strong>g the Ethiopian experience otherdevelop<strong>in</strong>g countries with <strong>hous<strong>in</strong>g</strong> shortages and who face rapid urbanization and populationgrowth can adapt and apply this logic to their own <strong>hous<strong>in</strong>g</strong> systems.In light <strong>of</strong> Ethiopia’s previously uncoord<strong>in</strong>ated and <strong>in</strong>efficient <strong>hous<strong>in</strong>g</strong> sector, the IntegratedHous<strong>in</strong>g Development Programme has proved to be a highly successful tool for affordable<strong>hous<strong>in</strong>g</strong> delivery at a large scale. Importantly, the programme is not only a <strong>hous<strong>in</strong>g</strong>programme but a wealth generation programme for low-<strong>in</strong>come households. Its success lies<strong>in</strong> its <strong>in</strong>tegrated nature - understand<strong>in</strong>g <strong>hous<strong>in</strong>g</strong> as part <strong>of</strong> an <strong>in</strong>tegrated social, economic,and political system - which has the opportunity to greatly improve the liv<strong>in</strong>g conditions andeconomic capacity <strong>of</strong> all sectors <strong>of</strong> society.United Nations Human Settlements Programme (UN-HABITAT)P.O. Box 30030, Nairobi 00100, KENYATel: +254 20 762 3120Website: www.unhabitat.orgEuropean Commission

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!